Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
10 Jun 2026, 5:00 pm4d left
EE UDAC Mathura
EE UDAC Mathura
LOT10
2026_UPIDC_1155503_10
05/EE/2026-27
Open Tender
Civil Works
90 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹33,000
Yes
4 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
10 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work. | 615.68 | CUM | - | - |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge. | 74.59 | CUM | - | - |
| 3 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 130.88 | CUM | - | - |
| 4 | Struck Pointing in 1:2 Cement mortor in Brick Masonry including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 152.27 | SQM | - | - |
| 5 | Flat Brick Pitching at Plateform in 1:4 Cement coarse sand ratio filled in joints including cost of all material, labour and T&P etc.complete. | 41.74 | SQM | - | - |
| 6 | Alternate Brick Pitching at ramp in 1:4 Cement coarse sand ratio filled in joints including cost of all material, labour and T&P etc.complete. | 61.2 | SQM | - | - |
| 7 | Providing and fixing of 75 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work | 15 | RM | - | - |
| 8 | Shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work | 170.7 | SQM | - | - |
| 9 | Struck deep pointing in 1:3 on Stone masonry cement, coarse sand inciuding cost of all material labour and T& P etc. complete | 184.14 | SQM | - | - |
| 10 | Making sub grade/ in lining work including watering compaction and preparation of surface. | 476.55 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
BOQ_2164824.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid