Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance 00 VIDYUT NAGAR MEERANPUR SADDARALI TANDA AMBEDKAR NAGAR UTTAR PRADESH 224238 UDYAM UP 04 0030119 | AMBEDKAR NAGAR | UTTAR PRADESH | 224238 | ₹10.4 L | L1 | Accepted-Finance AS PER PQC |
| 2 | L2₹11.0 LAccepted-Finance | ₹11.0 L | L2 | Accepted-Finance AS PER PQC |
| 3 | L3₹11.4 LAccepted-Finance | ₹11.4 L | L3 | Accepted-Finance AS PER PQC |
| Sl No | Description | Qty | Unit | M.A.K. CONSTRUCTION CO. L2 | M/S NOSAD CONTRACTOR L3 | M/s PRIYA CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|
| 1.00 | Routine Maintenance of various capacities of 6.6 KV motors ranging from 340 KW to 3600 KW of unit of Unit # 3 & 4 PTPP Parichha As per scope of work Sr. No.1, 1 to 10 | 24 | JOB | 35,096 ₹8.4 L | 36,217 ₹8.7 L | 33,425 ₹8.0 L |
| 2.00 | Proper tightening of stator copper leads, Tail cables, brass connectors, main cables etc inside cable connection box of motor at motor end as per scope of works Sl. No.2 A, 1 to 6 and Proper tightening of cable connections at breaker end as per scope of works Sl. No.2 B, 1 to 6 for Category A motor and Category B motors | 1 | EA | 382 ₹382 | 398 ₹398 | 351 ₹351 |
| 3.00 | Disconnection and re-connection of 6.6 KV cable connections at motor end as per scope of works Sl. No.2 C, 1 to 6 and Disconnection and re-connection of 6.6 KV cable at breaker end as per scope of works Sl. No.2 D, 1 to 7 for Category A and Category B motors. | 1 | EA | 576 ₹576 | 616 ₹616 | 528 ₹528 |
| 4.00 | Measuring of 6.6 KV motor & cable insulation resistance (IR) value by 2.5/5 KV megger. Measuring IR value of motor for 1min and 10min time for measuring polarization index of motor to ascertain the healthiness of motor as per scope of works Sl. No.2 E, 1 to 10 Category A and Category B motors. | 1 | EA | 421 ₹421 | 495 ₹495 | 386 ₹386 |
| 5.00 | Repairing of stator copper cable end of 6.6 KV Motor as per scope of work Sl. No.2 F, 1 to 8 for Category A and Category B motors. | 1 | EA | 4,328 ₹4,328 | 4,528 ₹4,528 | 4,113 ₹4,113 |
| 6.00 | Replacement of Brass terminal connector/tail copper cable/FRP moulding joint box/nylon gland part as per scope of work Sl. No.2 G, 1 to7 for Category A and Category B motors and Replacement of C.T. of Neutral side as per scope of work Sl. No.2 H, 1 to 5 for Category B motors. | 1 | EA | 1,265 ₹1,265 | 1,198 ₹1,198 | 1,152 ₹1,152 |
| 7.00 | Removal & installation of neutral side CT connection box as per scope of work Sl. No.2 I, 1 to 9 for Category B motor. | 1 | EA | 3,778 ₹3,778 | 3,849 ₹3,849 | 3,582 ₹3,582 |
| 8.00 | Replacement of gasket of 6.6 KV motor’s CT box & cable connection box at motor end. | 1 | EA | 723 ₹723 | 745 ₹745 | 651 ₹651 |
| 9.00 | Removal/Reinstall of canopy /Channels/Grills/ Mesh/Beam/Sheet of 6.6 KV, 340 KW Mill Motor,350 KW TAC Motor,600 KW CEP Motor,660 KW FD Fan Motor,300 KW PA Fan Motor ,1550 KW ID Fan Motor | 1 | Job | 2,695 ₹2,695 | 2,890 ₹2,890 | 2,479 ₹2,479 |
| 10.00 | Shifting of motor as per site requirement of 6.6 KV, 340 KW Mill Motor, 375 KW ACW Motor, 600 KW CEP Motor,660 KW FD Fan Motor | 1 | EA | 11,328 ₹11,328 | 12,217 ₹12,217 | 10,262 ₹10,262 |
Tender Value
₹13.0 L
EMD Value
₹25,000
Closing Date
9 Oct 2025, 4:00 pmClosed
SE OMC 4
office of SE OMC 4
Routine Electrical Preventive/Breakdown Maintenance of various capacities of 6.6 KV motors (Ranging from 340 KW to 3600 KW) of Unit # 3 4 of PTPP Parichha Jhansi
2025_RVUNL_1073746_1
N-PAR/B/OMC4/EMD1/6000009626
Open Tender
Power/Energy Projects/Products
730 days
office of SE OMC 4
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Dy. CAO, CFA BO
₹25,000
6 Feb 2026
15 Sept 2025
10 Oct 2025
15 Sept 2025
9 Oct 2025
15 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid