| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹2.8 L+₹10,844 (4.04%)Rejected-Finance | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Sri Azhagar Constructions L2 | Shree Saravana Contructions L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the Old Cement Concrete Road for Providing Storm Water Drain Arrangements including cost and conveyance of all materials and all labour charges etc., Complete | 9 | cum | 500 ₹4,500 | 486 ₹4,374 Lowest |
| 2.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. For Kerb Wall | 13.5 | cum | 200 ₹2,700 | 185 ₹2,497.5 Lowest |
| 3.00 | Plain Cement concrete of mix 1:4:8 (one part of cement, four parrt of M.sand ,and Eight part of coarse aggregate) using hard broken granite stone jelly of 40 mm gauge for foundation levelling course, including shuttering, dewatering wherever necessary and laid I layers of not more than 15cm thick complete complying with standard specifications and drawings and as directed by the departmental Engineers including all cost & conveyance of materials laying curing etc., complete as per TNDSS No 28 V,VI, (S2) (S5A)VII | 4.5 | cum | 5,300 ₹23,850 | 5,264 ₹23,688 Lowest |
| 4.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 118 | Sqm | 500 ₹59,000 | 459 ₹54,162 Lowest |
| 5.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part M-sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 15 | cum | 6,750 ₹1,01,250 | 6,714 ₹1,00,710 Lowest |
| 6.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 15 | Sqm | 180 ₹2,700 | 169 ₹2,535 Lowest |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 450 | Kg | 100 ₹45,000 | 89.88 ₹40,446 Lowest |
| 8.00 | Reinforcement Cement Concrete 1:11/2:3 mix using 20mm HBG Metal including cost and conveyance of all material to site and all labour charges etc., Complete | 4.5 | Sqm | 9,000 ₹40,500 | 8,943 ₹40,243.5 Lowest |
Tender Value
₹3.3 L
EMD Value
₹3,300
Closing Date
12 Aug 2025, 3:00 pmClosed
Executive officer
Nallampatti Town Panchayat
Construction of Storm Water Drain with cover slab at Ward No.04, From Existing Drainage to Odai in Nallampatti AD Colony in Nallampatti Town Panchayat.
2025_DTP_588827_1
62/1
Open Tender
Civil Works
Works
120 days
Nallampatti Town Panchayat
AS PER NORMS
2 documents required · 2 mandatory
₹0
₹3,300
Yes
20 Aug 2025
4 Aug 2025
12 Aug 2025
4 Aug 2025
12 Aug 2025
4 Aug 2025
4 Aug 2025 - 12 Aug 2025
Amount
Dismantling the Old Cement Concrete Road for Providing Storm Water Drain Arrangements including cost and conveyance of all materials and all labour charges etc., Complete
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. For Kerb Wall
Plain Cement concrete of mix 1:4:8 (one part of cement, four parrt of M.sand ,and Eight part of coarse aggregate) using hard broken granite stone jelly of 40 mm gauge for foundation levelling course, including shuttering, dewatering wherever necessary and laid I layers of not more than 15cm thick complete complying with standard specifications and drawings and as directed by the departmental Engineers including all cost & conveyance of materials laying curing etc., complete as per TNDSS No 28 V,VI, (S2) (S5A)VII
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
Plain Cement Concrete 1:2:4 Mix (one part cement, two part M-sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Reinforcement Cement Concrete 1:11/2:3 mix using 20mm HBG Metal including cost and conveyance of all material to site and all labour charges etc., Complete
Sri Azhagar Constructions (BID ID -1427289)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_703426.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .