| 1 | L1₹9.5 CrAccepted-AOC 8TH FLOOR BUILDING NO 9A DLF CYBER CITY PHASE III GURGAON 122002 | GURGAON | GURGAON | HARYANA | 122002 | ₹9.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹10.7 Cr+₹1.3 Cr (13.5%)Rejected-AOC 114 115 FIRST FLOOR AURORA TOWER EAST WING MG ROAD PUNE 411001 | PUNE | PUNE | MAHARASHTRA | 411001 | ₹10.7 Cr+₹1.3 Cr (13.5%) | L2 | Rejected-AOC L2 |
| 3 | L3₹11.5 Cr+₹2.0 Cr (21.3%)Rejected-AOC | ₹11.5 Cr+₹2.0 Cr (21.3%) | L3 | Rejected-AOC L3 |
| 4 | L4₹12.4 Cr+₹2.9 Cr (31.2%)Rejected-AOC D 90 OKHLA INDUSTRIAL AREA PHASE 1 NEW DELHI NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | ₹12.4 Cr+₹2.9 Cr (31.2%) | L4 | Rejected-AOC L4 |
| 5 | L5₹13.1 Cr+₹3.6 Cr (38.5%)Rejected-AOC PO BIRLA VIKAS PO BIRLA VIKAS SATNA MADHYA PRADESH 485005 | SATNA | MADHYA PRADESH | 485005 | ₹13.1 Cr+₹3.6 Cr (38.5%) | L5 | Rejected-AOC L5 |
Tender Value
₹11.9 Cr
EMD Value
₹23.9 L
Closing Date
30 Jul 2020, 4:00 pmClosed
SE (AUTOMATION,N/M, SP)
VIDYUT BHAWAN, JYOTI NAGAR, JAIPUR
Construction of 132 KV SC Transmission line between 132 KV GSS Nohar to 132 KV Railway TSS Nohar Using 132 KV XLPE Cable system ( 2 Phase and 1 Spare)
2020_RRVPN_187655_1
RVPN_EHV_ASP_TN_58
Open Tender
Electrical Works
Turn-key
270 days
NOHAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹17,700
SR AO (EA AND CASH) RVPN
₹23.9 L
JAIPUR
30 Jul 2021
25 Jun 2020
30 Jul 2020
25 Jun 2020
30 Jul 2020
25 Jul 2020
13 Jul 2020
MAIN MATERIAL/ ITEMS
Under ground cable Section
132kV, Single Core, 400mm2, XLPE Copper Cable
145kV rated Voltage Pre-moulded Straight Through Joint suitable for above cable
145kV rated Voltage Pre-moulded Straight Through Joint (with provision for sheath separation for cross bonding) suitable for above cable
145kV rated Voltage pre-moulded Outdoor end termination Kit complete with accessories suitable for above cable
Galvanized Steel Supporting Structures alongwith clamps, connectors, nut-bolts, washers, foundation bolts etc. for outdoor 132 kV cable termination (a composite structure to mount link boxes and the cable and termination) for each phase
Solid bonding Link box with Link plates, bonding & grounding cable complete with other associated accessories for 1-phase
Cross bonding Link box, Co-axial bonding cable, Sheath Voltage Limiters (SVL) complete with other associated accessories for each (2-phase+1 Spare) circuit
Earthing Material including cast iron pipes with suitable clamps, charcol, common salt etc. (2 core +1 Spare)
Terminal connector suitable for ACSR Panther on the item No. 6 to connect cable end termination to Outdoor Switchyard Equipment.
Warning Tapes as per Specification
Optical Fiber Cable and associated accessories/items as per specification
Line differential cum distance - Numerical relay with optical interface
OLTE equipments consisting of Fully Wired Cabinet with base 19" equipment rack with Control, Synchronisation, Alarm & Power supply cables- 1 No.;Central Processing Card - CPU- 2 Nos.;Power supply unit -48VDC- 2 Nos.;OLTE - 4 Port STM-1(155 Mbps Card)- 1 No.;SFP Duplex LC Connector for OLTE Card- 4 Nos.;OFC Patch Cords - 20 m- 8 Nos.;8 Port 2w/4w E&M Interface Card- 1 No.;4 Port Data Interface Card- 1 No.;4 Port Ethernet Card- 1 No.;4 Command Integrated Teleprotection Card- 1 No.;Line Differential relay interface card (min 2 ports)- 1 No.;Engineering Order Wire Phone- 1 No.;Laptop (Core i3 processor family,3.1 GHz & above, 15.0" LED, 1TB HDD, 4 GB RAM, DVD R/W) with configuration Software for all OLTE Terminals/ Equipments with preloaded licensed Microsoft Windows 10 OS as offered- 1 No.
Add: Any other item bidder may require to complete the Cable System as per specification requirements
Description of Work / Item(s)
Service part
SURVEY
Surveying of cable route excavation of trial holes as per field requirement, prepartion of cable route profile, drawings for cable laying , final route alignment, marking lines & grades/prepartion of final cable route darwings after approval & preparing bill of materials for complete route shown in drawings i.e. between terminal sub stations.
Evalutions of thermal resistivity of soil along cable route (as per tecnical specifications)
Cable Installation:
Handling, Transportation to site & laying of 132 KV, single core, 400 Sq mm XLPE Copper cable as per foregoing specification requirements.
Establishing of 1 single Ckt. having 2 Phase + 1 spare in each ckt for 132kV single core, 400 sq. mm copper cable in flat formation alogwith pilot fiber cable, providing of Warning tape taging fixing, pipes for drain & gate crossing as per drawings and specifications in trench by pulling, drawing, etc. including cables, using standard cable installation equipments and as per directions of the engineer in charge and returning of unused items in Store.
Handling & making of straight through joints for 132 KV, single core, 400 Sq mm power cable (XLPE copper cable) as per specification.
Handling and making of straight through joints (with provision for sheath separation for cross bonding) for 132 kV single core power cable as per specifcation.
Handling and making of outdoor type cable end terminations for 132 kV single core power cable as per specification
Erection of Galvanized Steel Supporting Structures alongwith clamps, connectors, nut-bolts, washers, foundation bolts etc. for outdoor 132 kV cable termination (a composite structure to mount link boxes and the cable and termination) for each phase
Installation of solid bonding Link box with Link plates, bonding & grounding cable complete with other associated acessories for 1-phase.
Cross bonding Link box, Co-axial bonding cable, Sheath Voltage Limiters (SVL) complete with other associated accessories for each (2-phase+1 Spare) circuit
Installation of Earthing Material including cast iron pipes with suitable clamps, charcol, common salt etc. (2 core +1 Spare)
Terminal connector suitable for ACSR Panther on the outdoor cable termination for connecting to 132 kV Bays at terminal substations.
Retrofitting of protection relays (Line differantial cum distance - Numerical relay with associated accessories)
Erection of Underground Optical Fiber Cable and associated accessories/items as per specification including FODP, patch cords etc.
OLTE equipments consisting of Fully Wired Cabinet with base 19" equipment rack with Control, Synchronisation, Alarm & Power supply cables- 1 No.;Central Processing Card - CPU- 2 Nos.;Power supply unit -48VDC- 2 Nos.;OLTE - 4 Port STM-1(155 Mbps Card)- 1 No.;SFP Duplex LC Connector for OLTE Card- 4 Nos.;OFC Patch Cords - 20 m- 8 Nos.;8 Port 2w/4w E&M Interface Card- 1 No.;4 Port Data Interface Card- 1 No.;4 Port Ethernet Card- 1 No.;4 Command Integrated Teleprotection Card- 1 No.;Line Differential relay interface card (min 2 ports)- 1 No.;Engineering Order Wire Phone- 1 No.;Laptop (Core i3 processor family,3.1 GHz & above, 15.0" LED, 1TB HDD, 4 GB RAM, DVD R/W) with configuration Software for all OLTE Terminals/ Equipments with preloaded licensed Microsoft Windows 10 OS as offered- 1 No.
CIVIL WORKS
Cutting Black Bitumen surface upto any depth including all layers of crust for laying Power Cables etc, staking of useful material and disposal of surplus debries including all leads including barricading, providing danger board/diversion board, lighting, reflectors etc.
Earth work in excavation for burried cable trenches/foundations including dressing of sides and ramming of bottoms, lift upto 2.5 mtr. including taking out the excavated soil & backfilling of jhiri with watering & ramming ,timbering & shoring ( wherever required ) disposal of surplus excavated soil as directed with all lead and lift including barricading, providing danger board/diversion board, lighting, reflectors etc.
Horizontal Direct Drilling (Trenchless Digging) method (with 250 mm HDPE pipe of minimum 6PN and strength complying to relevant ISS) wherever open cut method cannot be adopted (For 3-Ph single Circuit formation) (If required)
Poviding and laying of Cement concrete including curing, etc using stone aggregate 40 mm nominal size (crusher broken) in foundation plinth, excluding the cost of shuttering using 1 cement: 4 sand: 8 stone aggregate (For equipment foundation, junction box etc.)
P&L cement concrete in R.C.C. work in foundation,rafts,footings,strap beams, bases of columns etc.,'including curing ,compaction,finishing with rendering in cement sand mortar 1:3 (1cement :3 sand) and making good the joints, excl., the cost of centering and shuttering and reinforcement :M-20 grade mix 1:1.5:3 (1cement:1.5coarse sand : 3 graded stone aggregate 20 mm nominal size (For equipment foundation, junction box , culvert etc.)
Brick wall works, if required
Providing and fabricating steel reinforcement for R.C.C. work bending ,placing in position and binding complete including cost of binding wire in foundation ,raft footing ,strap beams base of column etc., up to plinth level hot rolled deformed (I.S.1139) cold twisted (I.S.1786)bars (For equipment foundation, junction box \ etc.)
Centering and shuttering with plywood or steel plates including strutting, propping bracing both ways with wooden members and removal of formwork for superstructure up to 4.5m height above plinth level for (For equipment foundation, junction box etc.)
Providing & Fixing of steel febrication made of angles, tees, square bars or other flats black pipe with hold fast and fittings complete as per design @ drawing including cutting welding & fabrication with priming coat of redoxide.
Providing,Laying & Jointing RCC class NP-2 Non Pressure pipes (IS:458 Mark) of approved make with collars, jointed with CM 1:2 or having Spigot & socket ends with flexible rubber rings joint including testing of joints etc. complete: 450 mm D.
Providing & Fixing of Reinforced Ferro Cement Cable Trench Covers designed for 'A' & 'AA' loading duly marked on cover with adequate reinforcement having thickness 75mm to 100 mm anti corrosive bitumen pained MS plate Rim & MS lifting hooks admixtures like plasticizer bond -improving compound, shrinkage resistance compound, abrasion resistant complete as per approved design ( For cable joint box) (For any span)
Providing & Laying HDPE pipe heavy duty of approved make jointed with solvent cement
(i) 250 mm dia. (for 2 phase+1 Spare formation)
(ii) HDPE PLB Duct for Optical Fiber Cable
Supply and laying inter locking RCC cable covers as per approved drawing
Supply, spreading of clean river sand in the cable trench and cable joint pit as per specification.
Providing & Fixing Cable Route Marker along the route of cable at the spacing of 50 meter etc. as per drawing and site requirement.
RR Stone masonary in F/P CSM 1:4
Plastering 20 mm thickness CSM 1:6
Providing & laying plane cement concrete M20 Grade
Add: Any other item bidder may require to complete the installation work as per specification requirements
Maintenance Service [ these charges shall be applicable after the completion of garaunteed performance period of cable system for 4 years excluding of item/ material/ equipment already covered for performance garauntee of 5 years. The charges shall be paybale on actuals
Maintenance services per visit towards any breakdown of cable system which includes services of expert engineers, technicians alongwith necssary tools/ tackles, testing equipments, fault locating equipments to detect the faults and its subsequent ractification, re-testing and restoring the electric supply through cable system
Description of Work / Item(s)
Total Schedule No. BOQB1
SUPPLY PART
Total Schedule No. BOQB2
SERVICE PART
FINOLEX J-POWER SYSTEMS PVT. LTD.
KEI Industries Limited
Rahul Cables Pvt Ltd
KEC INTERNATIONAL LTD
Universal Cables Limited
Rahul Cables Pvt Ltd
FINOLEX J-POWER SYSTEMS PVT. LTD.
KEC INTERNATIONAL LTD
KEI Industries Limited
FINOLEX J-POWER SYSTEMS PVT. LTD.
Rahul Cables Pvt Ltd
KEC INTERNATIONAL LTD
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .