Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.9 LAccepted-AOC | ₹95.9 L Quoted ₹81.2 L | L1 | Accepted-AOC Work order issued |
| 2 | L2₹81.3 L+₹2,708.75 (0.03%)Rejected-Finance | ₹81.3 L+₹2,708.75 (0.03%) | L2 | Rejected-Finance L2 |
| 3 | L3₹81.3 L+₹3,611.67 (0.04%)Rejected-Finance | ₹81.3 L+₹3,611.67 (0.04%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
29 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward number 36 Lohiya Nagar mein Ashok nath ke Makan se Manoj Mishra ke Makan Tak site patari intala ki RCC nali AVN Jagpal Yadav se Surendra Singh ke Makan hote hue Shankar aur Sadar Tak RCC nali ka karya
2026_DOLBU_1134518_3
Jal Nikasi Sr 43 Ward 36
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Nagar Nigam Gorakhpur
₹1.8 L
24 Aug 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantling of old brick work in lime or cement mortar including stacking with in 60m. | 137.97 | Cum | 400 | ₹55,188 |
| 1.02 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete . | 600.3 | Cum | 120 | ₹72,036 |
| 1.03 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 146.16 | Cum | 4,007 | ₹5,85,663.12 |
| 1.04 | RCC Work with cement concrete (1:1.5:3) including all completion of work. | 525.48 | Cum | 9,082 | ₹47,72,409.36 |
| 1.05 | M.S or iron work in renforcement cutting bending , binding ,and placeing incl. etc. all. | 349.67 | qtl | 7,690 | ₹26,88,962.3 |
| 1.06 | Diversion of water | 480 | Cum | 105 | ₹50,400 |
| 1.07 | Disposal of malwa etc. | 480.24 | Cum | 215.5 | ₹1,03,491.72 |
| 1.08 | S/Laying of GSB 53.-9.5 mm thick S/B upto 10Cm loose Layer including etc. all complete of work. | 80 | Cum | 3,134 | ₹2,50,720 |
| 1.09 | Consolidation of GSB upto 10 cm thick loose layer by Road Roller including etc. all.complete. | 80 | Cum | 210 | ₹16,800 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
d.pdf
Tender Documents • 2.53 MB
BOQ_2180632.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .