Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.5 LAccepted-AOC GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹2.5 L | L-1 | Accepted-AOC Award due to L-1 |
| 2 | L-2₹3.0 LRejected-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹3.0 L | L-2 | Rejected-Finance Reject due to L-2 |
| 3 | L-3₹3.1 LRejected-Finance | ₹3.1 L | L-3 | Rejected-Finance Reject due to L-2 |
Updated dates
Tender Value
₹2.8 L
EMD Value
₹2,802
Closing Date
5 Jan 2026, 3:00 pmClosed
Er. Parvesh Kumar
Sr. Executive Engineer ED HPSEBL Chamba
Tender for Providing restoration and repair of HV and LV lines / system which are anticipated to be damaged due to snowfalls in the winter season of FY 2025-26 in various electrical sections Bharmour 1st (u) ESD HPSEBL Bharmour. (CBA-E-20/2025-26)
2025_HPSEB_121402_1
CBA-E-20/2025-26
Open Tender
Electrical Works
180 days
Chamba
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹2,802
10 Feb 2026
22 Nov 2025
6 Jan 2026
22 Nov 2025
5 Jan 2026
22 Nov 2025
A. R/M estimate of Of HV Distribution system i.e 33 kV & 11 kV Lines (u) ESD Bharmour for the year 2025-26. T.S No. 02/2025-26, S.amount- Rs. 31,14,635/- only, Scheme-Revenue Expenditure
Supply Part:-
Providing ACSR conductor 6/1/3.35 by the contractor
Prov.Stay set complete in all respect (i/c Stay Clamp) (1No. / Single Pole , 4 No. / Double Pole Structures)
Prov.Stay Wire (7/3.15 mm) (9 kg Per Stay Set
Erection Part:-
Erection of New Steel Tubular Pole 9 mtr. Long including digging of pits, filling of pit and ramming, drilling of holes in X-arms/X- bracing set, fixing of X-arms, insulators, top clamp,and danger plate and other accessories complete in all respect by the contractor.Fittings already provided on the damaged pole shall be used in the erection of new pole.
Re-Erection of Double Pole structure with steel tubular double poles 9 Mtr. long including digging of pits, filling of pit and ramming, drilling of holes in X-arms, X- bracing set, fixing of X-arms, insulators, , top clamp,and danger plate and other accessories complete in all respect by the contractor.
Re-Erection of Single Pole structure with steel tubular poles 9 Mtr. long including digging of pits, filling of pit and ramming, drilling of holes in X-arms, knee bracing set, fixing of X-arms, insulators, , top clamp,and danger plate and other accessories complete in all respect by the contractor.
Laying, stringing, saging of conductor along with binding with insulator by the contractor
Re- Stringing, re-sagging and binding with insulator the ACSR conductor (ACSR/AAAC) by the contractor
Stringing and re-sagging the G.I wire by the contractor
Re-Erection of stay set, stay wire and stay clamp for 9 Mtr long ST Pole damaged due to snapping of stay wire or landslides etc. including ramming & fixing of stay rod, nozzeling and tightening of stay wire by the contractor, complete in all respect as per HPSEBL specification by the contractor.
R/M estimate of Of LV Distribution System i.e LT lines, services & Distribution system (u) ESD Bharmour for the year 2025-26. T.S No. 07/2025-26, S.amount- Rs.35,43,710/- only, Scheme-Revenue Expenditure
Supply Part:-
Providing ACSR conductor 6/1/2.59 by the contractor
Prov.LT Stay Set (i/c Stay clamp)
Prov.Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Supply Part:-
Erection of New Steel Tubular Pole 8 mtr. Long including digging of pits, filling of pit and ramming, drilling of holes , insulators,, fixing of barbed wires and danger plate and other accessories complete in all respect by the contractor.Fittings already provided on the damaged pole shall be used in the erection of new pole.
Re-Erection of Single Pole Structure with steel tubular poles 8 Mtr. long including digging of pits, filling of pit and ramming, drilling of holes , insulators,, fixing of barbed wires and danger plate and other accessories complete in all respect by the contractor.
Laying, stringing, saging of conductor along with binding with insulator by the contractor
Stringing and Re-sagging of ACSR conductor /AAAC conductor and binding the conductor with insulator by the contractor.
Stringing and Re-sagging of G.I wire by the contractor.
Re-Erection of stay set, stay wire and stay clamp for 8 Mtr long ST Pole damaged due to snapping of stay wire or landslides etc. including ramming & fixing of stay rod, nozzeling and tightening of stay wire by the contractor, complete in all respect as per HPSEBL specification by the contractor.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_177924.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
SBDPDFFinal.rar
Tender Documents • 2.19 MB
BOQ_177924.xls
BOQ • 0.30 MB
TenderMandatoryDocuments.pdf
Additional Documents • 0.18 MB
Download all tender documents and submit your bid