Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹54.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹60.4 L+₹6.2 L (11.4%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹81.9 L
EMD Value
₹1.6 L
Closing Date
10 Aug 2026, 4:00 pmClosed
office of the ExEn Div Vailoo
office of the ExEn Div Vailoo
Reconstruction of Devi Temple at Chittergul Anantnag
2026_PWDJK_318277_4
ENIT29DivisionVailoo26-27
Open Tender
Civil Works
Percentage
180 days
Vailoo
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Centralized Designated pooling Account
₹1.6 L
12 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A:- Earth work in bulk excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and , including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. (in all kinds of soils) | - | Cum | 0.8 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m in plinth trenches and front courtyard. | - | Cum | 0.8 | - |
| 3 | P/L Stone solling of Specified size duely hand packed incl. all carriages and loading/unloading. | - | Cum | 0.2 | - |
| 4 | P/L in position cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded crushed stone aggregate,40mm nominal size) excluding the cost of centering and shuttering complete job. | - | Cum | 0.4 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm | 1 | Cum | 0.4 | ₹0.4 |
| 6 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level in 1:2:4 mix. | - | Cum | 0.8 | - |
| 7 | Reinforcement for RCC work incld straightning, cutting, bending, placing in position & binding all complete (Thermo-mechanically treated bars) | - | Kg | 0.2 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of the same for foundatons above plinth level | - | Sqm | 0.8 | - |
| 9 | Brick work with FPS bricks 75 in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand) with Extra for brickwork in super structure above plinth upto floor V level
Qty vide item no. 1 including all costs and carriages | 1 | Cum | 0.8 | ₹0.8 |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Imported Wood | 1 | Cum | 0.6 | ₹0.6 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_1047936.xls
BOQ • 0.71 MB
Cor29.pdf
PDF • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .