Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | +4.98% | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 CrAdmitted-Finance NA | PALWAL | HARYANA | 121004 | +5.05% | ₹2.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.2 CrAdmitted-Finance NA | NA | NA | 121004 | +6.10% | ₹2.2 Cr | L3 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹1.5 L
Closing Date
2 Mar 2026, 5:30 pmClosed
Assistant Director, Dept. of Archaeology Nagpur
Assistant Director, Department of Archaeology, Opposite Govt. Press, Zero Miles, Civil Lines, Nagpur - 440 001
RESTORATION AND CONSERVATION WORK FOR DARWA VESH, KARANJA LAD, TAL. KARANJA, DIST. WASHIM.
2026_TCADM_1274712_1
ADA-03/2025-26
Open Tender
Civil Works - Others
Percentage
KARANJA LAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Yes
₹1.5 L
Yes
Assistant Director,Department of Archaeology nagpu
9 Jun 2026
5 Feb 2026
4 Mar 2026
5 Feb 2026
2 Mar 2026
5 Feb 2026
13 Feb 2026
RESTORATION AND CONSERVATION WORK FOR DARWA VESH, KARANJA LAD, TAL. KARANJA, DIST. WASHIM
Clearing grass and removal of rubbish up to a distance of 50 metres out side the periphery of the area.
Cutting down trees including trunks and branches and stacking the materials neatly with a lead of 50m. as directed with girths above 30cm to 60cm.
Providing Soil Bag Support to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete.
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building / structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
Numbering the monument elements in proper order before lowering down with approved colour and shade as directed by Engineer in-charge, including ladder, scaffolding etc. complete.
Lowering down carefully existing brick masonry of the monument manually in proper order including shifting the bricks up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete.
Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete.
Dismantling Brick masonry in lime or cement including stacking the materials as directed with all leads, lifts, complete. Additional Item Spec. No. : As directed by Engineer in charge.
Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete.
Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete.
Lowering down the debris obtained from breaking and removing the cement plaster / burnt brick / stone masonry by any means without causing dust nuisance and damage to structure, stacking the same as and where directed including cleaning the site complete.
Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 0.00m to 1.5 m.)
Providing soiling using 80 mm size trap metal in 15cm. Layer including filling voids with sand/ grit ramming, watering complete.
Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete.
Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete.
Re-setting Un-coursed Rubble Masonry of reuse-stones in lime mortar 1:1½, in superstructure as per detailed specifications and drawings or as directed including the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in superstructure as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing/Re-setting Ashlar Rough-tooled Masonry of reuse-stones in lime mortar 1:1½ in plinth as per detailed specifications and drawings or as directed including all beds or joints, which shall not exceed 6 mm. (¼″), the stones shall be set in mortar, the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, bailing out water, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete..
Providing Ashlar Rough-tooled Masonry of trap / granite stones in lime mortar 1:1½ with size of stone 60 cm. x 45 cm. x 30 cm. in superstructure as per detailed specifications and drawings or as including the stones be of approved quality, colour, hard and free from defect of any kind, the faces exposed to view shall have fine dressed chisel draft, 25 mm. (1″) wide all around the edges and rough tooled between the drafts, and on all beds or joints, which shall not exceed 6 mm. (¼″), the stones shall be set in mortar, the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing Block In Course Stone Steps of trap / granite stones in lime mortar 1:1½ with size of stone 60 cm. x 45 cm. x 20 cm. as per detailed specifications and drawings or as directed the stones be of approved quality, colour, hard and free from defect of any kind, the stones shall be of exact size and shape, the shall be rough-tooled on exposed surface, holes for balusters should be cut in the steps before they are laid, each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Carving ornamental work including moulding, grove, clhisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. A) The charges for chiselling & dressing on stone surface for govering at the stone surface after chisling as per market rate
Re-setting Coursed Rubble Masonry Second Sort of reuse-stones in lime mortar 1:1½, in superstructure as per detailed specifications and drawings or as directed including all stones to be set full in mortar, all side joints shall be vertical and beds horizontal and not joints shall be more than 12.5 mm. (½″), the through stones shall be inserted 5 and 6 feet apart in every course, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing Coursed Rubble Masonry Second Sort of trap / granite stones in lime mortar 1:1½, size of stone 45 cm. x 30 cm. x 20 cm. in superstructure as per detailed specifications and drawings or as directed including the stones shall be laid in horizontal course, the face of the stones to be hammered and bushing not to be project more than 3.8 cm. (1½″), all stones to be set full in mortar, all side joints shall be vertical and beds horizontal and not joints shall be more than 12.5 mm. (½″), the through stones shall be inserted 5 C30:C31and 6 feet apart in every course, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing Rubble Arching of trap / granite stones in lime mortar 1:1½, with size of stone 40 cm. x 30 cm. x 20 cm. as per detailed specifications and drawings or as directed including the arch stones be of approved quality, it shall consists of flat bedded slab laid solidly and flush in mortar with their beds radial to the curve of the arch, the face joints of the stones shall be dressed truly radiating and the bed joints shall be properly summered; the ends of the face stone shall also be dressed, preparing the lime mortar in lime miller, cantering/scaffolding, watering and all arch work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing Brick Arching First Class with first class bricks in lime mortar 1:1½, as per detailed specifications and drawings or as directed including the bricks to be of uniform size, thoroughly well burnt and sound, ringing clearly when stuck with trowel, the bricks to be soaked in water for 12 hours before used, the bricks to be laid in concentric half-brick ring, the joints are to be properly summered and not to exceed 17 mm. (⅔″) in thickness, the joints to be truly radial to the curve at all points, great care to be taken that the rings are bonded together properly, whenever the joints of any of the rings come to a summering or plane face, all arches to be turned on centrings, preparing the lime mortar in lime miller, cantering/scaffolding, watering and all arch work when handed over to be perfectly clean and free from all mortar stains etc. complete.For arches & vaulted roofs.
Providing Brick Arching First Class with first class bricks in lime mortar 1:1½, as per detailed specifications and drawings or as directed including the bricks to be of uniform size, thoroughly well burnt and sound, ringing clearly when stuck with trowel, the bricks to be soaked in water for 12 hours before used, the bricks to be laid in concentric half-brick ring, the joints are to be properly summered and not to exceed 17 mm. (⅔″) in thickness, the joints to be truly radial to the curve at all points, great care to be taken that the rings are bonded together properly, whenever the joints of any of the rings come to a summering or plane face, all arches to be turned on centrings, preparing the lime mortar in lime miller, cantering/scaffolding, watering and all arch work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Corbel arches
Designing and arranging the bricks in such way to obtain required design as per original on Both gates of Vesh this includes the proper arrangement of the bricks to obtain the required design as per original present at the site. As directed by ADA / Engineer In charge
Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary
Providing 12 mm. thick Rough Cast Lime Plaster in single coat in lime mortar 1½:1 in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing ornamental / artwork plaster 12 to 18 mm thick Lime Plaster in single coat in lime mortar 1½:1 in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Art Work Plaster
Providing Fine Coat Of Lime over rough cast plaster in superstructure, as per detailed specifications and drawings or as directed including the finishing coat is to be applied over rough cast plaster and well-polished with trowel, preparing the lime mortar, scaffolding and watering complete.
Providing Lime Pointing to stone work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete
Providing Lime Pointing to brick work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing and fixing Stone Paving, Second Sort in lime mortar 1:1½, with size of stone 60 cm. x 45 cm. x 15 cm., as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1″), the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing and fixing 90 cm x 60 cm Granite plate engraving 10cm. Heightletter, figures including painting the lefters/figures with approved colour and shade complete.
Providing and erecting chain link fencing 1.6 M. height with G.I. chain link of size 50 x 50 mm, 8 gauge thick and fixed 75 mm above ground level on vertical M.S. Angles of 40 x 40 x 6 mm size, includind excavating pits for foundation and embedded in C.C. block of 1:4:8 mix of size 450 x 450 x 670 mm. at 1.75 M. c/c with iron bar 16mm dia as hold fast including welding link with angle frame at 30 cm c/c with nuts and bolts and horizontal M.S. Angles at top and bottom of 25 x 25 x 5 mm size and vertical M.S. flat 35 x 5 mm and 25 x 5 mm horizontal including cross support of 40 x 40 x 6 mm angles both side at every corner or bend embedded in concrete blocks of 1:4:8 of size 450 x 450 x 670 mm including 3 coats of oil painting etc. complete.C46:C47
Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm with iron bars at 150mm C/C and diagonal flats as per the detailed drawing including hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kilogram/Smt.
Disposing off / conveying the dismantelled materials of stone masonry / brick masonry/ concrete/ debris/ excavated material / soil murrum / rubbish material or vegetation / grass / shrubs etc. from site to 5 Km as directed by Engineer incharge
Providing and fixing of retro-reflectorised informatory sign board rectangular / Square in shape having area less than 0.9 square meter made out of 2 mm aluminum sheet bonded with white retroreflective sheeting of Class (Type IV High intensity micro-prismatic grade sheeting-HIP) having pressure sensitive /heat activated adhesive retoreflective specified background, border and back side retoreflctive symbols, letters, numerals, arrow as per IRC:67-2012 Table No 8.3, supported with back support frame 25 mm x 25 mm x 3 mm duly painted on back side with two coats of grey stove enamel paint and supported on one Number mild steel angle iron post 75 mm x 75 mm x 6 mm, 3.5 mt long firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing The angle iron post shall be duly painted with one coat of epoxy primer and two coats of epoxy finish paint having alternate black and white bands of 25 cm width including GI fixures and transportation etc. complete. The nutbolts of board with angle iron post / supporting structure after fixing at site has to be electrically welded. Class B (Type IV High intensity micro-prismatic grade sheeting-HIP) sheeting shall have 7 years written warranty from the manufacturer and authorised distributor / convert or issued for field performance including the screen printed areas and cut-out sheeting and cut-out durable transparent overlay film and this warranty.
Providing and fixing jungle wood ballies of approved species 85 mm average dia. for common rafters, purlins, ridges, hip and valley rafters, jack rafters, wall plates, post plates, posts etc. including all iron work scaffolding if necessary and oiling in one coat etc. complete.
Providing and fixing 22 B.W.G. plain galvanised iron sheets on top of weather shed, including scaffolding, fixing by means of nut and bolts or as directed etc. complete. (Brackets of 70 x 45 mm to be paid separately)
Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5" X 7" Size outdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shooting, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete
Book Designing, Publishing and Printing: The work involves printing of a book / guidebook on the fort / monuments and its various aspects, which would provide authentic and precise tourism oriented information. This work involves important photographs of the site, art objects, antiquities, inscriptions etc., which would be useful for educating the masses of the rich cultural heritage of the site, region and state. providing 100 pages coloured books as directed by engineer in charge / ADA
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
SCB.pdf
Other Document • 0.18 MB
TD.pdf
Tender Documents • 4.58 MB
BOQ_2194098.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].