Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.8 L+₹70,629.77 (7.73%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹11.0 L+₹1.9 L (20.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.7 L
EMD Value
₹14,700
Closing Date
16 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer UI Right Canal Division No-I Mukhiguda dist. Kalahandi
Construction of RCC trough wall lining for improvement of the existing canal, including strengthening of canal banks, within RD 400 m to RD 800 m of Paderpada S/M-I.
2026_CEUIP_144829_7
SE, UIRCD-I-07 (01-13)/ 2026-27
Open Tender
Civil Works - Canal
Percentage
180 days
Mukhiguda
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,700
Yes
17 Nov 2026
2 Nov 2026
17 Nov 2026
2 Nov 2026
16 Nov 2026
2 Nov 2026
2 Nov 2026 - 9 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubish upto a distance of 50m out side the perifery of the area, T & P required for the work including labour welfare cess with all leads, lifts, delifts, etc. Charge complete in all respect as per direction of the Engineer-in-charge | 336 | Sqm | 2.9 | ₹974.4 |
| 2 | Excavation of foundation in all kinds soil within 50m Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceding 0.3m in depth etc complete as per direction of the Engineer in charge. | 92.89 | Cum | 210.52 | ₹19,555.62 |
| 3 | Filling of foundation and plinth with sand well watered and rammed in foundation trenches including cost, carriage and royality of all materials etc. Complete and as directed by the Engineer-in-Charge. | 29.28 | Cum | 614.26 | ₹17,985.53 |
| 4 | Cement concrete work of M15 using 20mm and down graded size CBHG chips including mixing with concrete mixture with cost, conveyance, royalty of all materials etc. complete & as per the direction of the Enginner-in-Charge. | 21.96 | Cum | 6,019.56 | ₹1,32,189.54 |
| 5 | Reinforced Cement Concrete work of M20 grade with 20 mm and down grade black hard granite (Crusher broken) stone chips including hoisting and laying as per direction of Engineer in Charge. | 48.07 | Cum | 6,443.02 | ₹3,09,728.86 |
| 6 | Supplying, fitting & placing uncoated M.S. bars reinforcement complete as per drawing & technical specifications etc as per direction of the Engineer-in-charge. | 62.28 | Qntl | 9,477.45 | ₹5,90,255.59 |
| 7 | Providing formwork for concrete with F1 finish for C.C. wall, guard wall etc. with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials and T&P etc complete as directed by the Engineer-in-Charge. | 408.96 | Sqm | 817.59 | ₹3,34,361.61 |
| 8 | Providing weep holes in abutment and wing wall with 2" size PVC including metal spall backing in rear and centrering and shuttering etc. complete as directed by Engineering-In-Charge. | 36 | Mtr | 338.8 | ₹12,196.8 |
| 9 | Filling F&P with excavated earth laying in layers, watering, ramming etc. complete as directed by the Engineer-in-Charge. | 30.96 | Cum | 116.95 | ₹3,621.24 |
| 10 | Earth work in Hard soil with 50 m initial lead and 1.5m initial lift including rough dressing and breaking clods max 5cm to 7cm in size and laying in layers not exceedin 0.3m in depth and as per direction of the Enginer-in-charge. | 201.6 | Cum | 235.74 | ₹47,525.18 |
stage.html
html • 0.02 MB
finance_617283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.66 MB
DTCNWORK07PaderpadaSMI.pdf
Tender Documents • 4.77 MB
BOQ_617283.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .