Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-Finance 63 SECTOR 4 R FARIDABAD HARYANA 121004 | FARIDABAD | FARIDABAD | HARYANA | 121004 | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹7.5 L+₹49,016 (7.03%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹8.2 L+₹1.3 L (18.4%)Rejected-Finance 107 265 BRAHAMA NAGAR KANPUR UP 208012 | KANPUR NAGAR | UTTAR PRADESH | 208012 | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹8.7 L+₹1.7 L (24.7%)Rejected-Finance | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹8.8 L+₹1.8 L (26.0%)Rejected-Finance PLOT NO 234 BBN ENERGY SYSTEMS PRIVATE LIMITED 234 SECTOR 37 PHASE VI UDYOG VIHAR GURGAON GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L5 | Rejected-Finance Not Being L1 |
Tender Value
₹9.9 L
EMD Value
₹19,790
Closing Date
22 Jul 2019, 4:30 pmClosed
DGM(CNS)
o/o Airport Director AAI, Goa International Airport
Supply, Installation and Testing and Commissioning of Earthing system with 3 Pits (3 Nos.) for CNS Equipment Room facilities at Goa International Airport
2019_AAI_28583_1
AAI/GOA/CNS/EARTH PITS/2019
Open Tender
Electrical Works
Works
30 days
Goa
As per Tender Doc
15 documents required · 15 mandatory
₹1,120
Yes
AIRPORTS AUTHORITY OF INDIA
₹19,790
Yes
7 Jul 2020
8 Jul 2019
26 Jul 2019
9 Jul 2019
22 Jul 2019
9 Jul 2019
9 Jul 2019 - 20 Jul 2019
Amount
Supply and Installation
Supply of Copperplate of 600mmX600mmX3.15mm. (Purity should not be less than 90%)
Supply of PVC pipe for Watering shall be 40mm diameter, Length 3meter (contain hole of 12mm diameter)
Supply of Salt for filling Earth pit amount 120 kg (As per Technical specification Diagram)
Supply Charcoal for filling Earth pit ,amount 120 kg(As per Technical specification Diagram)
Supply of Copper Strip of 3000mmX25mmX5mm with Sleeves for connecting Earthing plate to Inspection Chamber. (Purity should not be less than 90%.)
Laying of Copper strip of 25mmX5mm with Sleeves for connecting Inspection Chamber to Equipment. (Length 30 meter) including laying GI Pipe beneath the soil to carry Copper strip up to hut, drilling hole in hut and clamping/sadling copper strip on wall just before the equipment to be earthed
Brazing of all interconnection of copper strip.
Installation of Iron Signage Board (12inchX8inchX0.2inch) colored white paint with iron rod stands (length 30 inch) buried in ground near earth pit
Installation/Commissioning of Copper plate earthing system with provision of watering facility and inspection chamber (including freight charges, supply of cement, sand, bricks and other requirements.)
S K POWER SUPPORT
Awasthi Electric Works
Shantha ELectricals and Engineers Pvt Ltd
BBN ENERGY SYSTEMS PVT LTD
KUMAR ENGINEERING
Mahalaxmi Enterprieses
GROWTH ASSOCIATES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .