Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC 5 8 DAKSHINPARA ROAD KOLKATA KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹9.2 L+₹39,699.59 (4.50%)Rejected-Finance 12B NS RD 1ST FLOOR CAL 1 700001 | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹9.6 L+₹82,381.22 (9.34%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
25 Apr 2022, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.CE(E)/WS
5,S,N.Banerjee Road, Kolkata-700013
REPAIRING OF PUMP NO-3 AT STATION-2 UNDER TPS
2022_KMC_374372_1
KMC/WS/TPS/06/2021-2022
Open Tender
MECHANICAL
Item Wise
90 days
Tallah Pumping Station
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
19 Oct 2022
1 Apr 2022
27 Apr 2022
2 Apr 2022
25 Apr 2022
3 Apr 2022
180 days
Amount
DE-COUPLING THE HT PUMP FROM MOTOR,REMOVAL OF HORIZONTAL / VERTICAL SPLIT TOP VOLUTE AFTER LOOSENING THE NUTS AND BOLTS, REMOVAL OF SHAFT IMPELLER ASSEMBLY FROM THE BOTTOM VOLUTE OF THE PUMP WITH UTMOST CARE BY USING DEPARTMENTAL OVERHEAD CRANE TO BE KEPT AT THE WORKING FLOOR AND PLACING THE TOP VOLUTE AGAIN ON THE BOTTOM VOLUTE TO PREVENT SUCKING OF AIR, ETC. COMPLETE AS PER DIRECTION OF EIC (MODE OF MEASUREMENT - WEIGHT OF TOP VOLUTE AND ROTATING ASSEMBLY
SUPPLY FITTING AND FIXING OF APPROPRIATE SIZE GLANDPACKING TO THE PUMPS AND VALVES AFTER TAKING OUTTHE OLD ONE AS PER T.S. AND DIRECTION OF EIC.
TO AND FRO TRANSPORTATION OF COMPLETE SHAFT -IMPELLER ASSEMBLY FROM T.P.S. WORK SITE TO THECONTRACTOR'S WORKSHOP AND VICEVERSA INCLUDINGLOADING AND UNLOADING WITH PROPER CARE AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT - WEIGHT OFTHE ROTATING ASSEMBLY.)
REMOVAL OF HALF COUPLING USING THE HYDRAULIC PULLERAND FIXTURES ETC. VERY CAUTIOUSLY FROM THE SHAFT &COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT - WEIGHT OF THE HALF COUPLING)
PREPERATION OF SURFACE FOR METAL DEPOSITION ON THEPITTED / WORN OUT PORTION OF THE IMPELLER BY SUITABLE METHOD ETC. COMPLETE IN ALL RESPECT AS PER DIRECTIONOF EIC (MODE OF MEASUREMENT - DIAMETER OF THEIMPELLER X DISTANCE BETWEEN THE IMPELLER EYE X NO. OFVANES, TO BE CONSIDERED)
SURFACE DEVELOPMENT BY METAL (MOC-GM) DEPOSITIONON THE PITTEDPORTION OF THE CONVEX SIDE AND LEADINGEDGES OF ALL VANES OF IMPELLER SURFACE (SAMEMATERIAL TO BE USED FOR METAL DEPOSITION AS PER EXISTING IMPELLER) WITH COMPLETE IN ALLRESPECT ASPER DIRECTION OF E-I-C. (MODE OFMEASUREMENT=DIAMETER OF THE IMPELLER X DISTANCEBETWEEN THE IMPELLER EYE X NOS. OF VANES TO BECONSIDERED).
TRUENESS AND ECCENTRICITY CHECKING OF THE SHAFTIMPELLER ASSEMBLY, TRUENESS CHECKING OF THECOUPLING AND DYNAMIC BALANCING THE COMPLETEASSEMBLY BY ADDING OR REMOVING THE UNBLANCE MASS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.THE BALANCING CERTIFICATE MUST BE FURNISHED TO THEDEPARTMENT. ( MODE OF MEASUREMENT - WEIGHTROTATING ASSEMBLY)"
FITTING FIXING OF THE SLEEVE, JAM NUTS, STUFFING BOXBUSH, WEARING RING BY HYDRAULIC JACKS AND SPECILIZEDFIXTURES ETC. AND COMPLETE IN ALL ERSPECT AS PER DIRECTION OF EIC. ( MODE OF MEASUREMENT - WEIGHT OFTHE SLEEVES / JAM NUTS/ STUFFING BOX BUSH/ WAERINGRING)
FITTING FIXING OF THE HALF COUPLING BY HYDRAULIC JACKAND SPECILIZED FIXTURES ETC. AND COMPLETE IN ALLRESPECT AS PER DIRECTION OF EIC. (MODE OFMEASUREMENT - WEIGHT OF THE HALF COUPLING)
REMOVAL OF THE VOLUTE AND POSITIONING, FITTING ANDFIXING THE COMPLETE ROTATING ASSEMBLY ON THE PUMPBOTTOM VOLUTE WITH UTMOST CARE AND POSITIONING THE TOP VOLUTE WITH NECESSARY HYDRAULIC PAPER , BOLTEDUP AND COMPLETE IN ALL RESPECT AS PER DIRECTION OFEIC. ( MODE OF MEASUREMENT - WEIGHT OF TOP VOLUTE AND ROTATING ASSEMBLY)
REMOVAL OF SLEEVE BUSHES, STUFFING BOX BUSH, JAMNUT ETC. FROM THE SHAFT WITH REQUIRED ARRANGMENTETC. COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC ( MODE OF MEASUREMENT- WEIGHT OF SLEEVES, JAM NUTSAND STUFFING BOX BUSH. )
REMOVAL OF IMPELLER USING REQUIRED HYDRAULICPULLER AND FTXTURES ETC. VETY CAUTIOUSLY WITHOUTANY DAMAGE EITHER TO THE SHAFT SURFACE OR TO THEKEY ETC. WITH REQUIRED ARRANGEMENT ETC. COMPLLETE IN ALL RESPECT AS PER DIRECTION OF EIC ( MODE OFMEASUREMENT - DIAMETRE OF THE IMPELLER IN METERMULTIPLIED BY DISTANCE BETWEEN THE IMPELLER EYE IN METER TO COSIDERED.)
ULTRA-SONO-GRAPHY/ DIE- PENETRATION ( USG AND DPTEST ) TEST TO CHECK THE DEFECT/CRACK OF THE SHAFTMATERIAL AND TEST CERTIFICATE TO BE FURNISHED OBTAINED FROM THE COMPETENT AUTHORITY ANDCOMPLETE IN ALL RESOECT WITH PROPER CARE ANDCAUTION AS PER DIRECTION OF EIC.
FITTING AND FIXING OF THE IMPELLER BY HYDRAULIC JACKAND SPECILIZED FIXTURES ETC. AND COMPLETE IN ALLRESPECT AS PER DIRECTION OF EIC. ( MODE OFMEASUREMENT - WEIGHT OF THE IMPELLER)
MAKING ALIGNMENT OF THE SHAFTS OF PUMP AND MOTORBY USING DIAL GAUGE ETC. INCLUDING INSERTION OFREQUISITE DIMENTIONED BRASS SHEETS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
CLEANING OF THE BEARING HOUSING AND FITTING AND FIXING OF THE OIL RINGS BY PROVIDING MATCHING SCREW AND PINS ETC. AND POURING THE NEW LUBRICANTING OILS AND COMPLETE IN ALL RESOECT AS PER DIRECTION OF EIC.
MANUFACTURING, SUPPLYING, DELIVERY & FITTING & FIXING OF SLEEVE BUSH (MOC-SS-304), AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
RE-METALLIZATION OF SPLIT TYPE BUSH BEARINGS PER SET OF PUMP BY PROVIDING ADDITIONAL REQUIRED BABBIT WHITE METAL ( TANDEM DE-90 HAVING COMPOSITION ( SN- 85%, SB- 10% AND CU-85%) SAND BLASTING MACHINING AND FINISHING ETC COMPLETE AS PER DIRECTION OF ETC.AFTER REMOVING THE OLD WHITE METALS ( WHICH WILL BE RE USED FOR RE-METALLIZATION WORKS) BY NECESSARY SUITABLE METHODS AND COMPLETE IN ALL RESPECT WITH PROPER CARE AND CAUTION AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT- SURFACE AREA OF THE BEARING REMAINS CONTACT WITH THE SHAFT )
SUPPLY AND DELIVERY OF THE SHAFT WITH KEY (PIN-84,54 &49) MOC-EN 19 FOR THE PUMP (MODEL-36/36 DV LONO VANE,MAKE- MATHER & PLATT) HAVING CAPACITY 1.75 MGH WITH THE HEAD OF 38 M OF WC.
MANUFACTURING , SUPPLY, DELIVERY, FITTING & FIXING OFCOUPLING PIN (MOC-EN-24) WITH BOLT AND COMPLETE IN ALL RESPECTAS PER DIRECTION OF EIC
MANUFACTURING , SUPPLY, DELIVERY, FITTING & FIXING OF OIL RINGS (MOC-GUN-METAL-CU 85%,ZN 4-6%, PB 4-6%,SN 4-6%) AND COMPLETE IN ALL RESPECTAS PER DIRECTION OF EIC
INTER CONTINENTAL AGENCY
ALOKE DAS AND CO.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .