Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC COIMBATORE CITY MUNICIPAL CORPORATION TAMIL NADU TN | ERODE | TAMIL NADU | 638459 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.4 L+₹11,138.30 (1.35%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | T VIJAY L1 | A.Radhakrishnan L2 |
|---|---|---|---|---|---|
| 1.00 | Providing pile foundation using 300mm dia aguar etc as per officers etc completed | 18 | m | 20 ₹360 Lowest | 30 ₹540 |
| 2.00 | Earth work Excavation in all soils with initial lead and lift etc., complete | 29 | M3 | 180 ₹5,220 | 90 ₹2,610 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 4 | M3 | 6,600 ₹26,400 Lowest | 6,610 ₹26,440 |
| 4.00 | Supply and fabrication of RTS rods of various dia including cutting and bending etc complete | 1.83 | Qtl | 11,650 ₹21,319.5 Lowest | 11,660 ₹21,337.8 |
| 5.00 | Supply and erecting shuttering including necessary supports for plane surfaces such as RCC column, footing, plinth beam, stair case etc., in all floors using mild steel sheets of 90cm X 60cm and 10 gauge stiffened with welded mild steel angle for boarding supported by casurina props at suitable intervals etc., completed complying with standard specification and as directed. Sl.No.122 | 72 | m2 | 1,650 ₹1,18,800 Lowest | 1,660 ₹1,19,520 |
| 6.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete | 7 | M3 | 11,900 ₹83,300 Lowest | 11,910 ₹83,370 |
| 7.00 | Fly ash Brick work in CM 1:5 (one cement & five sand) using size 9"X4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 23 | M3 | 7,900 ₹1,81,700 Lowest | 7,910 ₹1,81,930 |
| 8.00 | Plastering in Cement Mortar 1:5 mix 12mm thick | 141 | M2 | 495 ₹69,795 Lowest | 505 ₹71,205 |
| 9.00 | Supplying and fixing of design grill main gate including cost and conveyance of all labour and material charges ..etc. complete | 600 | kg | 165 ₹99,000 Lowest | 175 ₹1,05,000 |
| 10.00 | Painting with first quality emulsion paint two coats over a priming coat including through cleaning, scrapping, removal of dust and including necessary plaster of paris putty works wherever required etc., completed. | 195 | M2 | 400 ₹78,000 Lowest | 410 ₹79,950 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
12 Aug 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Construction of Compound wall at Bommanampalayam ICDS Centre in Ward no 38 of West Zone.
2025_MAWS_589766_14
E3/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
31 Mar 2026
7 Aug 2025
13 Aug 2025
7 Aug 2025
12 Aug 2025
7 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_704774.xls
BOQ • 0.33 MB
Building.pdf
Tender Documents • 0.67 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .