| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-Finance | 1 | Accepted-Finance L1 LOWEST BIDDER | |
| 2 | 2₹3.4 L+₹1,165 (0.34%)Rejected-Finance FLAT NO S 30 93 SHIVPUR SHIVPUR SHIVPUR VARANASI UTTAR PRADESH 221003 UDYAM UP 75 0007051 | VARANASI | UTTAR PRADESH | 221003 | 2 | Rejected-Finance RATES ARE ON HIGHER SIDE | |
| 3 | 3₹3.5 L+₹11,255 (3.33%)Rejected-Finance | 3 | Rejected-Finance RATES ARE ON HIGHER SIDE |
Tender Value
₹5.7 L
EMD Value
₹6,000
Closing Date
16 May 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC UPPTCL AZAMGARH
220KV S/S COLONY HAFIZPUR AZAMGARH
WORK OF REPLACEMENT OF GASKET OF 40MVA T/F-II BBL MAKE AT 132KV S/S MACHHALISHAHAR UNDER ETD, JAUNPUR
2022_UPTCL_697623_1
05/AETC/2022-23
Open Tender
Electrical Works
Item Wise
30 days
JAUNPUR
UTR SLIP OF EMD TENDER FEE PAN CARD GST CERTIFICATE WORK EXPERIENCE etc.
2 documents required · 2 mandatory
₹708
SE ETC UPPCL AZAMGARH
₹6,000
25 May 2022
9 May 2022
17 May 2022
9 May 2022
16 May 2022
9 May 2022
9 May 2022 - 16 May 2022
180 days
Amount
Following works to be carried out for replacement of gaskets including other associated work for 132/33 KV 40 MVA T/F-II (BBL Make) at 132 KV S/S Machlishehar under ETD-Jaunpur with all cost of man, material T&P as per technical specification for proper completion of the work with due safety and precautions as per direction of supervising engineer. Carriage of 20 Kl oil tnak 01 No. from 220 KV S/S Jaunpur to 132 KV S/S Machhalishahar hired by Private Vehicle (Approx. Distance 25 Km)
Opening of jumpers of HV/LV side bushing and removal of earthing strip from neutral bushing.
Dismantling of 40 MVA Transformer accessories including radiator, bushing, bucholz relay oil pipe line from conservator tank to main tank, oil pipe line to OLTC and surge relay conservator tank.
Complete drain out of old transformer oil from the existing 40 MVA Transformer into empty oil drums/ oil tanker and storage of oil drums at stores/ designated place to storage.
Replacement of all gaskets including the top cover gaskets of transformer by providing and fixing of new gaskets as per existing size made of rubberized cork sheet Kotika/Turboze/ NU Cork brand grade 07 after due fabrication.
Replacement of all gaskets including the Bottom cover gaskets of transformer by providing and fixing of new gaskets as per existing size made of rubberized cork sheet Kotika/Turboze/ NU Cork brand grade 07 after due fabrication.
Cleaning of core and winding by transformer oil and removal of sludge from bottom of main tank.
Applying vacuum to above transformer up to 760 mm of HG for 24 Hrs. with adequate capacity vacuum pumps after necessary blanking/ erection as per requirement.
Filling of dry nitrogen gas having DEW point (-60°c to (-) 65°c under vacuum from top value of transformer up to pressure of 3 PSI and maintaining the same by the same tank for 12 Hrs. including cost of nitrogen gas and nitrogen gas filling device.
Creating vacuum inside the main tank for period for 12 hrs. And filling of centrifuged transformer oil in main tank of required BDV after preparation in 20 KL oil tanker.
Complete erection of 40 MVA transformer accessories including radiator conservator tank, bushing with its turrets alongwith connecting of all oil pipe line , erection of cooling fans making control cables connection, Buchloz relay etc. topping up of transformer oil and final oil filling in the main tank, radiator , conservator tank and all other accessories
Centrifuging of transformer oil in transformer tank or oil tanker by connecting centrifuging pipes, circulating the transformer oil through centrifuging machine and taking BDV values of the oil periodically till the required value is achieved as per direction of supervising engineer and also measurement of PPM. All labor, T&P Centrifuging machine shall be provided by contractor at his own cost.
RISHAB OIL RECLAIMATION PRIVETE LIMITED
RAJ ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .