Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | ₹12.5 L | L1 | Admitted-Finance |
| 2 | L2₹12.8 LAdmitted-Finance GHAZIABAD 201206 U P INDIA MURADNAGAR GHAZIABAD UTTAR PRADESH 201206 UDYAM UP 29 0018296 09ATCPK8932G1ZH R M | GHAZIABAD | UTTAR PRADESH | 201206 | ₹12.8 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | AGNI AUTOMATION AND SECURITY L2 | K.L Enterprises L1 |
|---|---|---|---|---|---|
| 1.01 | Making of all safety arrangements at site before start of work. | 1 | Job | 12,000 ₹14,160 | 13,690 ₹16,154.20 |
| 1.02 | Dismantling of old liquid rotor starter by opening its incoming and outgoing connection of the motor and opening/cutting the grouted angles nut/bolts etc. | 1 | Job | 44,500 ₹52,510 | 44,580 ₹52,604.40 |
| 1.03 | Shifting of the LRS from the installed location to outside the pump house using Hydra/crane as per requirement & instructions of the engineer in charge. | 1 | Job | 24,750 ₹29,205 | 24,550 ₹28,969 |
| 1.04 | Supply of the FCMA based Rotor controller fixed in enclosure with Start/Stop/Run indication and required contactors for operation, having motor protection relay, suitable for 3 Phase 3.3 KV supply, motor rating 275 KW Motor using Crane/Hydra as per site requirement and as per instructions of engineer in charge. Make Innovative/ Jayshree/L&T/Schneider Electric/DJB approved | 1 | Job | 8,20,000 ₹9.7 L | 7,99,200 ₹9.4 L |
| 1.05 | Work of installation of FCMA based Rotor controller fixed in enclosure with Start/Stop/Run indication and required contactors for operation, having motor protection relay, suitable for 3 Phase 415 Volt supply, motor rating 275 KW /3.3 KV Motor using Crane/Hydra as per site requirement and as per instructions of engineer in charge. Make Innovative | 1 | Job | 1,42,500 ₹1.7 L | 1,24,590 ₹1.5 L |
| 1.06 | Work of connection of the feedback from the main incoming panel and connection of feedback of ACB/MCCB the FCMA panel & Connection of the FCMA rotor controller with required lugs/thimbles /tape etc to complete the work. | 1 | Job | 20,000 ₹23,600 | 24,700 ₹29,146 |
| 1.07 | Complete testing of the Panel after installation. | 1 | Job | 24,500 ₹28,910 | 24,700 ₹29,146 |
Tender Value
Refer Docs
EMD Value
₹26,000
Closing Date
27 Mar 2026, 2:45 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER (SDW)-VIII
OFFICE OF THE EXECUTIVE ENGINEER (SDW)-VIII
Replacement of existing LRS with Soft starters at Dwarka Sector 7 SPS
2026_DJB_288972_6
NIT NO.17 (2025-2026)EE(SDW)VIII
Open Tender
Miscellaneous Works
60 days
OFFICE OF THE EXECUTIVE ENGINEER (SDW)-VIII
as per NIT conditions
2 documents required · 2 mandatory
₹500
services.sabpaisa.in
₹26,000
2 May 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Making of all safety arrangements at site before start of work. | - | Job | - | - | item1 |
| 1.02 | Dismantling of old liquid rotor starter by opening its incoming and outgoing connection of the motor and opening/cutting the grouted angles nut/bolts etc. | - | Job | - | - | item2 |
| 1.03 | Shifting of the LRS from the installed location to outside the pump house using Hydra/crane as per requirement & instructions of the engineer in charge. | - | Job | - | - | item3 |
| 1.04 | Supply of the FCMA based Rotor controller fixed in enclosure with Start/Stop/Run indication and required contactors for operation, having motor protection relay, suitable for 3 Phase 3.3 KV supply, motor rating 275 KW Motor using Crane/Hydra as per site requirement and as per instructions of engineer in charge. Make Innovative/ Jayshree/L&T/Schneider Electric/DJB approved | - | Job | - | - | item4 |
| 1.05 | Work of installation of FCMA based Rotor controller fixed in enclosure with Start/Stop/Run indication and required contactors for operation, having motor protection relay, suitable for 3 Phase 415 Volt supply, motor rating 275 KW /3.3 KV Motor using Crane/Hydra as per site requirement and as per instructions of engineer in charge. Make Innovative | - | Job | - | - | item5 |
| 1.06 | Work of connection of the feedback from the main incoming panel and connection of feedback of ACB/MCCB the FCMA panel & Connection of the FCMA rotor controller with required lugs/thimbles /tape etc to complete the work. | - | Job | - | - | item6 |
| 1.07 | Complete testing of the Panel after installation. | - | Job | - | - | item7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_383703.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid