| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 CrAccepted-AOC 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | ₹24.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹24.2 Cr+₹8.4 L (0.35%)Rejected-Finance | ₹24.2 Cr+₹8.4 L (0.35%) | L2 | Rejected-Finance L2 |
| 3 | L3₹24.2 Cr+₹8.4 L (0.35%)Rejected-Finance 129 5 MALVIYA ROAD GEORGE TOWN PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹24.2 Cr+₹8.4 L (0.35%) | L3 | Rejected-Finance L3 |
| 4 | L4₹25.6 Cr+₹1.4 Cr (5.90%)Rejected-Finance | ₹25.6 Cr+₹1.4 Cr (5.90%) | L4 | Rejected-Finance L4 |
| 5 | L5₹25.8 Cr+₹1.7 Cr (6.84%)Rejected-Finance 276 89 19 MYOUR ROAD PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹25.8 Cr+₹1.7 Cr (6.84%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S SHREE RAM CONSTRUCTION L6 | M/s S.S. ASSOCIATES L3 | M/S YATINDRA KUMAR TRIPATHI L2 | M/S G S COATINGS L1 | NBTC INFRACON LLP L5 | M/s Hari Construction L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 17,748 | Sqm | 15 ₹2,66,220 | 4.36 ₹77,381.28 Lowest | 10 ₹1,77,480 | 6.39 ₹1,13,445.22 | 8 ₹1,41,984 | 6.84 ₹1,21,449.56 |
| 2.00 | Excavation for road work in soil with hydraulic excavator of 0-90cum bucket capacity including cutting and loading in tippers trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location within all lifts and lead upto 1000m.As per MORTH specifications No.-301 | 11,993.28 | cum | 40 ₹4,79,731.2 | 30 ₹3,59,798.4 | 20 ₹2,39,865.6 Lowest | 38.43 ₹4,60,925.74 | 70 ₹8,39,529.6 | 41.14 ₹4,93,451.51 |
| 3.00 | Construction of embankment with approved material deposited at site from road way cutting and excavation from drain and foundation of other structure graded and compacted to meet requirement of table 300.2. As per MORTH No-305 | 11,993.28 | cum | 80 ₹9,59,462.4 | 20 ₹2,39,865.6 Lowest | 50 ₹5,99,664 | 52.73 ₹6,32,453.63 | 90 ₹10,79,395.2 | 56.45 ₹6,77,020.66 |
| 4.00 | Construction of Embankment with approved material obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacting to meet aggregement of table 300-2 (Cartage 5 Km.) | 62,305.2 | cum | 80 ₹49,84,416 | 40 ₹24,92,208 | 30 ₹18,69,156 Lowest | 186.41 ₹1,16,14,125.42 | 100 ₹62,30,520 | 190 ₹1,18,37,988 |
| 5.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 21,706.5 | cum | 2,300 ₹4,99,24,950 | 2,500 ₹5,42,66,250 | 2,281.16 ₹4,95,15,999.54 | 2,334.74 ₹5,06,79,077.22 | 2,200 ₹4,77,54,300 Lowest | 2,470 ₹5,36,15,055 |
| 6.00 | Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification inlcuding premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with machanical paver in sub-base/base course on wall prepared surface and compacting with vibratory roller to achieve the desired density. As per MOR&TH specification No. 406 | 12,887.8 | cum | 2,600 ₹3,35,08,280 | 2,600 ₹3,35,08,280 | 2,400 ₹3,09,30,720 | 2,474.04 ₹3,18,84,932.71 | 2,300 ₹2,96,41,940 Lowest | 2,630 ₹3,38,94,914 |
| 7.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | 80,548.75 | Sqm | 34 ₹27,38,657.5 | 30 ₹24,16,462.5 Lowest | 35 ₹28,19,206.25 | 33.56 ₹27,03,054.95 | 30 ₹24,16,462.5 Lowest | 35.92 ₹28,93,311.1 |
| 8.00 | Providing and laying dense graded bituminous macadam Gr-1 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.00 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 (A) complete in all respects. | 7,249.39 | cum | 13,000 ₹9,42,42,070 | 8,600 ₹6,23,44,754 | 9,400 ₹6,81,44,266 | 7,234.63 ₹5,24,46,618.13 Lowest | 10,000 ₹7,24,93,900 | 7,844 ₹5,68,64,215.16 |
| 9.00 | Providing and applying tack coat with VG-10 using bitumen pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H Clause 503 | 80,548.75 | sqm | 12 ₹9,66,585 | 11 ₹8,86,036.25 | 18 ₹14,49,877.5 | 9.84 ₹7,92,196.96 Lowest | 11 ₹8,86,036.25 | 10.52 ₹8,47,372.85 |
| 10.00 | Providing and laying bituminous concreate Gr-IIwith batch type hot mix plant producing an average outpur of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as Morth Specification clause 509 complete in all respects. | 2,416.47 | cum | 14,000 ₹3,38,30,580 | 9,500 ₹2,29,56,465 | 10,300 ₹2,48,89,641 | 9,118.83 ₹2,20,35,371.88 Lowest | 11,000 ₹2,65,81,170 | 10,925 ₹2,63,99,934.75 |
Tender Value
₹28.5 Cr
EMD Value
₹42.8 L
Closing Date
29 May 2026, 12:00 pmClosed
SE Banda Circle P.W.D. Banda
SE Banda Circle P.W.D. Banda
widening and strengthening of Tindwari Bagiya Piprahri Amlor Road (ODR) From km-1 to 17(160) including 5 years Maintenance
2026_CEBAN_1147736_1
2283/35C-Banda Circle/2025-26 Dt. 12-05-2026
Open Tender
Civil Works
Item Rate
450 days
Banda
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,260
₹42.8 L
Banda
17 Sept 2026
22 May 2026
29 May 2026
22 May 2026
29 May 2026
22 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | - | Sqm | - | - |
| - | Excavation for road work in soil with hydraulic excavator of 0-90cum bucket capacity including cutting and loading in tippers trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location within all lifts and lead upto 1000m.As per MORTH specifications No.-301 | - | cum | - | - |
| - | Construction of embankment with approved material deposited at site from road way cutting and excavation from drain and foundation of other structure graded and compacted to meet requirement of table 300.2. As per MORTH No-305 | - | cum | - | - |
| - | Construction of Embankment with approved material obtained from borrow pits with all lift and leads, transporting to site, spreading, grading to required slope and compacting to meet aggregement of table 300-2 (Cartage 5 Km.) | 1 | cum | - | - |
| - | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | - | cum | - | - |
| - | Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification inlcuding premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with machanical paver in sub-base/base course on wall prepared surface and compacting with vibratory roller to achieve the desired density. As per MOR&TH specification No. 406 | 1 | cum | - | - |
| - | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | - | Sqm | - | - |
| - | Providing and laying dense graded bituminous macadam Gr-1 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.00 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 (A) complete in all respects. | - | cum | - | - |
| - | Providing and applying tack coat with VG-10 using bitumen pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H Clause 503 | - | sqm | - | - |
| - | Providing and laying bituminous concreate Gr-IIwith batch type hot mix plant producing an average outpur of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as Morth Specification clause 509 complete in all respects. | 1 | cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tendernotice_2.pdf
PDF • 1.92 MB
Tendernotice_3.pdf
PDF • 0.25 MB
Format.pdf
Additional Documents • 0.24 MB
BOQ_2151560.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .