Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79,000Accepted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-Finance lowest | |
| 2 | L2₹80,000+₹1,000 (1.27%)Rejected-Finance JAMMU AND KASHMIR | L2 | Rejected-Finance not lowest | |
| 3 | L3₹81,500+₹2,500 (3.16%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L3 | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS L1 | Shivam enterprises L3 | js electrical and machanical works L2 |
|---|---|---|---|---|---|---|
| 1.00Replacement of damaged parts of 100 KVA electric transformer along with allied works installed at LIS Harapeer. | ||||||
| 1.01 | Replacement of damaged parts of 100 KVA electric transformer installed at lift irrigation station Harapeer by way insolating of transformer from 11 KV HT supply, removing of HT cables and LT cables from the transformer. Lifting of transformer from installed position using crane and carriage of transformer using vehicle/ manual labour to road side approx. 1.5 to 2km from the lift irrigation station. Then Shifting of transformer to workshop for repairs . Completely dismantling the transformer after removing the top cover of transformer and extracting out the damaged LV and HV coils from the oil tank. Complete rewinding of HV coils and reconditioning of LV coils using superior quality insulating material. Providing and fitting of 3 no’s HV bushes, HV bush rod 3 no’s, gasket set and nuts and bolts. Repairs to the core of transformer by replacing the flashed core material. Heating of assembled coils in oven for proper hot air process and to get required meager value. Repair to oil tank by welding to make the oil tank leak proof and air tight. Lowering the assembled coils in oil tank. Filtering of existing transformer oil and topping up with 120 liters of fresh transformer oil. Back shifting of the transformer to LIS after complete repairs in the manner it was shifted to workshop. Complete job includes cost of material, crane charges, carriage charges, labour charges, cost of oil, and welding charges.
Note:- The Tenderers are requested to visit the site and quote the rate as per site conditions. The firm should offer rebate on old material. | 1 | Job | 79,000 ₹79,000 Lowest | 81,500 ₹81,500 | 80,000 ₹80,000 |
| 1.02 | Rebate on Old Parts | 1 | Job | -1,580 ₹-1,580 | -1,630 ₹-1,630 | -1,600 ₹-1,600 |
Tender Value
₹81,500
EMD Value
₹1,630
Closing Date
1 Sept 2025, 2:00 pmClosed
XEN MID JAMMU
MID JAMMU
Replacement of damaged parts of 100 KVA electric transformer along with allied works installed at LIS Harapeer.
2025_IFC_284632_1
MID/J/e-NIT/2025-26/47
Open Tender
Repair and Maintenance Works
Item Wise
7 days
Harpeer
as per tender notice and BOQ
8 documents required · 8 mandatory
₹200
Executive Engineer MID JAMMU
₹1,630
17 Nov 2025
20 Aug 2025
2 Sept 2025
20 Aug 2025
1 Sept 2025
20 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .