| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | L1 | Accepted-AOC After negotiation with PTC and L1 bidder.PTC finals the case and awarded this contract. | |
| 2 | L2₹9.6 L+₹1.6 L (19.4%)Rejected-Finance | L2 | Rejected-Finance Not accepted due to L2 bidder. | |
| 3 | L3₹8.7 L+₹72,678 (9.07%)Rejected-Finance GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L3 | Rejected-Finance Not accepted due to L3 bidder. | |
| 4 | Rejected-Technical | - | Rejected-Technical NOT SUBMITTED DOC AS PER PQC |
| Sl No | Description | Qty | Unit | M/S R L ENGINEERING L1 | M/S SHYAM ERECTORS L3 | M/S R.P. CONSTRUCTION CO. L2 |
|---|---|---|---|---|---|---|
| 1.00 | Routine up keeping of HT/LT power cables (Except Cable gallery at Zero mtr and ten mtr) and other miscellaneous work in 2X210 MW of BTPS. (One job consists of one month period). | 24 | job | 18,900 ₹4,53,600 Lowest | 22,000 ₹5,28,000 | 20,600 ₹4,94,400 |
| 2.00 | Routine cleaning of cable galleries floors (Size: 132Mx8.6M, cleaning of cable galleries roofs, all four sides of walls) at zero meter & ten-meter elevation, cleaning of cables in cable galleries and outside area of DG sets building in 2X210 MW of BTPS (One job consists of one week period). | 104 | job | 3,239 ₹3,36,856 Lowest | 4,000 ₹4,16,000 | 3,535 ₹3,67,640 |
| 3.00 | Salvaging/laying of LT Power cable per meter 1CX1000/800/630, 3C/3.5CX300/240/185/150 | 1 | mtr | 54 ₹54 Lowest | 70 ₹70 | 60 ₹60 |
| 4.00 | Salvaging/laying of LT Power cable per meter 1CX400/300/240/185/150 ,2CX120 &3C/3.5CX95/75/50 | 1 | mtr | 35 ₹35 Lowest | 45 ₹45 | 39 ₹39 |
| 5.00 | salvaging/laying of LT Power cable per meter below 50 sq.mm and all types of Control cables | 1 | mtr | 16 ₹16 Lowest | 22 ₹22 | 19 ₹19 |
| 6.00 | Straight through jointing of LT Power cable per set of 1CX1000/800/630, 3C/3.5CX300/240/185/150 | 1 | job | 2,186 ₹2,186 Lowest | 2,500 ₹2,500 | 2,385 ₹2,385 |
| 7.00 | Straight through jointing of LT Power cable per set of 1CX400/300/240/185/150 ,2CX120 &3C/3.5CX95/75/50 | 1 | job | 1,196 ₹1,196 Lowest | 1,500 ₹1,500 | 1,307 ₹1,307 |
| 8.00 | straight through jointing of LT Power cable below 50 sq.mm and all types of Control cables | 1 | job | 519 ₹519 Lowest | 700 ₹700 | 570 ₹570 |
| 9.00 | End termination of LT Power cable per set of 1CX1000/800/630, 3C/3.5CX300/240/185/150 | 1 | job | 1,446 ₹1,446 Lowest | 1,750 ₹1,750 | 1,600 ₹1,600 |
| 10.00 | End termination of LT Power cable per set of 1CX400/300/240/185/150 ,2CX120 &3C/3.5CX95/75/50 | 1 | job | 875 ₹875 Lowest | 1,100 ₹1,100 | 1,000 ₹1,000 |
Tender Value
₹17.7 L
EMD Value
₹20,000
Closing Date
29 Sept 2025, 11:00 amClosed
SE OMC-IV BTPS
O/o SE OMC-IV BTPS PTPP
Routine up keeping and electrical maintenance of LT power cables, cable galleries at zero meter 10-meter elevation with their racks at Boiler, Turbine and BOP area of 2x210 MW and Switchyard of 2x210 MW 2X110 MW BTPS PTPP, Parichha, Jhansi.
2025_RVUNL_1071275_1
N-PAR/B/OMC4/EMD2/6000009539
Open Tender
Electrical Works
Lump-sum
730 days
BTPS PTPP
AS PER PQC
2 documents required · 2 mandatory
₹1,180
Dy. CAO, CFA BO, PTPP, Parichha
₹20,000
15 Nov 2025
5 Sept 2025
29 Sept 2025
5 Sept 2025
29 Sept 2025
5 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .