| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.2 LAdmitted-Finance 4 155 28 2 SHOP NO C 24 GROUND FLOOR BUILDING C RAJ KRISHNA TOWERS DURGABHAT PONDA GOA | PONDA | GOA | -10.00% | ₹10.2 L | L1 | Admitted-Finance |
| 2 | L2₹10.8 L+₹66,737.90 (6.56%)Admitted-Finance | -4.10% | ₹10.8 L+₹66,737.90 (6.56%) | L2 | Admitted-Finance |
Tender Value
₹11.3 L
EMD Value
₹22,623
Closing Date
22 Jul 2026, 1:00 pmClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER, CIVIL DIV-XV(N), ELECTRICITY DEPARTMENT, GIDC BUILDING, VI FLOOR, PATTO - PLAZA, PANAJI - GOA
Repairs and renovations to the B7 and B8 quarters at Bicholim Electricity Department residential colony.
2026_ED_30286_1
EE/DIV-XV/ED/NOTICE- 14(26-27)/478 Date 10/07/2026
Open Tender
Civil Works
Percentage
90 days
Bicholim Goa
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
₹22,623
17 Aug 2026
14 Jul 2026
23 Jul 2026
14 Jul 2026
22 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairs to plaster in patches of 2.5 sq.m. and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50m lead. | |||||
| 1.01 | With cement mortar 1:4 (1 cement : 4 fine sand) | 29.76 | sq.m | 314 | ₹9,344.64 |
| 2Dismantling doors, windows and clearestory windows (steel or wood) shutters including chowkhats architrave holdfast etc. complete and staking within 50 mt. Lead | |||||
| 2.01 | Of area 3 sq.m. and below | 40 | Each | 206 | ₹8,240 |
| 3 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 124.91 | sq.m | 330 | ₹41,220.3 |
| 4 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 0.63 | cu.m | 1,136 | ₹715.68 |
| 5Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 5.01 | Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth | 2.18 | sq.m | 412 | ₹898.16 |
| 6 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 17.23 | kg | 105 | ₹1,809.15 |
| 7Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.76 MB
Tendernotice_2.pdf
PDF • 30.62 MB
BOQ_30699.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .