Loading…
Loading…
Tender Value
₹4.6 Cr
EMD Value
₹13.8 L
Closing Date
1 Jul 2026, 12:00 pm3d left
Similar tender results from the same govt authority in the past 3 years.
Chief Engineer
LDA Gomti Nagar, lko
Naimish nagar yojna ke sector 10 me isthit road ka nirman karya. Part G
2026_LDAUP_1163504_1
48/E-Nivida/CE/2026-27/8
Open Tender
Civil Works
365 days
LDA Gomti Nagar, lko
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
Secretary LDA
₹13.8 L
24 Jun 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 9,360 | sqm | 24.63 | ₹2,30,536.8 |
| 2 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered)., Depth not exceeding 1.5 m. | 1,515 | Sqm | 110.55 | ₹1,67,483.25 |
| 3 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered)., Depth exceeding 1.5 m but not exceeding 3 m. | 435 | Sqm | 122.68 | ₹53,365.8 |
| 4 | Extra for planking, strutting and packing materials for cavities (in close timbering) if required to be left permanently in position. (Face area of timber permanently left to be measured). | 21.75 | Sqm | 1,336.96 | ₹29,078.88 |
| 5 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):, Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered): Depth not exceeding 1.5 m. | 900.01 | Sqm | 56.92 | ₹51,228.51 |
| 6 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):, Depth exceeding 1.5 m but not exceeding 3 m. | 810 | Sqm | 64.46 | ₹52,212.6 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 218.4 | Cum | 5,762.47 | ₹12,58,523.45 |
| 8 | STEEL FOR REINNFORCEMENT | 1,20,829.27 | KG | 71.5 | ₹86,39,292.59 |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required., In gratings , frames, guard bar , ladder, railings , brackets , gates and similar works | 7,800 | Kg | 136.35 | ₹10,63,530 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :, Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 7,332 | Sqm | 665.54 | ₹48,79,739.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
TD.pdf
Tender Documents • 5.78 MB
BOQ_2181203.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid