Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.5 LAccepted-Finance | ₹3.5 L | L-1 | Accepted-Finance Accept |
| 2 | L-2₹3.8 LRejected-Finance | ₹3.8 L | L-2 | Rejected-Finance Reject |
| 3 | L-3₹3.8 LRejected-Finance VILL PO SAPOURI TEHSIL AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹3.8 L | L-3 | Rejected-Finance Reject |
Tender Value
₹3.6 L
EMD Value
₹7,300
Closing Date
20 Mar 2026, 10:00 amClosed
Executive Engineer
Division HPPWD Bharwain
Dismantling and disposal of old shop structures/buildings at Mata Chintpurni Temple Tehsil Amb District Una HP
2026_PWD_131278_1
Dismantling and disposal at Chintpurni temple Under Bharwain Divn
Open Tender
Civil Works
15 days
Bharwain
A per tender documents
2 documents required · 2 mandatory
₹350
₹7,300
24 Mar 2026
12 Mar 2026
20 Mar 2026
12 Mar 2026
20 Mar 2026
12 Mar 2026
Dismantling by mechanical/manual mean of existing brick masonry/stone masonry/plain cement concrete/ Reinforced cement concrete/ Steel/ Wood or any other component/material of buildings/structures etcetera and the like, including T&P (Tools & Plant) and scaffolding wherever necessary, sorting/lifting the dismantled useful material, lifting/disposal of unserviceable material upto all lead, lifts through all modes of transportation including head load or animal transport or by mechanical means as per CPWD Specifications and as per the direction and entire satisfaction of the Engineer-in-Charge including carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him to the extent of damage occurred in all cases. The rate is inclusive of useful material obtained from dismantling and all taxes including Good Sales Tax imposed by the Government. The useful material will be the property of dismantling Contractor and the site should be cleared in all respect after the dismantling of building.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_194093.xls
BOQ • 0.27 MB
SBDDismentling.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid