Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance SEUR AURAI BHADOHI SEUR AURAI BHADOHI SEUR AURAI BHADOHI BHADOHI UTTAR PRADESH 221301 | BHADOHI | UTTAR PRADESH | 221301 | Admitted-Finance |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
25 Sept 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER EDC Mirzapur
SUPERINTENDING ENGINEER EDC Mirzapur
Construction of line Aditional fund in B.P. 2023-24 under the Jurisdiction of EDD-CHUNAR, Mirzapur
2023_PVVNV_835874_1
53/EDC(M)/23-24
Open Tender
Construction Works
Lump-sum
90 days
SUPERINTENDING ENGINEER EDC Mirzapur
Please refer tender
2 documents required · 2 mandatory
₹3,540
Executive Engineer(A)
₹50,000
7 Oct 2023
8 Sept 2023
26 Sept 2023
8 Sept 2023
25 Sept 2023
8 Sept 2023
Amount
Supply of following Decentralized materials at the works site as per RESSPO norms
Stone pad 300x300x75 mm (Providing by Contractor)
X-arms holding clamps with bolts & nuts for PCC/STP (Providing by Contractor)
F-bracket with bolts & nuts for PCC/STP (Providing by Contractor)
Al. binding wire (Providing by Contractor)
M.S clamp for Top, T-off channel with bolts & nuts for PCC/STP (Providing by Contractor)
P.G clamps for weasel conductor (Providing by Contractor)
Danger board with clamp & bolts (Providing by Contractor)
L.T clamps with bolts & nut for PCC pole (Providing by Contractor)
Earth wire clamps for PCC Pole (Providing by Contractor)
L.T Shackle Insulators 100x115 mm (Providing by Contractor)
Copper L-Piece 50x225x10 mm (LS) (Providing by Contractor)
Copper L-Piece 62x225x12 mm (LS) (Providing by Contractor)
All lugs 240 mm2 (Providing by Contractor)
All lugs 120 mm2 (Providing by Contractor)
All lugs 70 mm2 (Providing by Contractor)
Dead end clamp for pole/bracket with nuts & bolts (Providing by Contractor)
I Hook ( for dead end Clamp) (Providing by Contractor)
Suspension clamp with nuts & bolts (Providing by Contractor)
I Hook ( for suspension Clam) (Providing by Contractor)
M.S clamp with nuts bolts painted with redoxide (Providing by Contractor)
L.T connector A type (Providing by Contractor)
L.T connector B type (Providing by Contractor)
L.T bare nuetral connector (Providing by Contractor)
Distribution boxes/Kiosk for LT pole/bracket with clamp & nut bolt (Providing by Contractor)
Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge
ST Poles 11 mtr long (Provided by Department)
PCC Poles 8.5 mtr long (Provided by Department)
Line materials with ACSR Weasel / Rabit Conductor (Provided by Department)
Arial Bunch Cable 3x120+1x95+1x16 mm2 (Provided by Department)
11 KV VCB O/G, 200/100/5A (Provided by Department)
11 KV VCB I/C, 600/300/5A (Provided by Department)
Transformer 250 KVA, (Provided by Department)
Transformer 100 KVA, (Provided by Department)
Transformer 63 KVA, (Provided by Department)
Transformer 25 KVA, (Provided by Department)
Erection
Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Arial Bunch Cable 3x120+1x95+1x16 mm2
Disconnection & Reconnection Charge
Earthing of Poles
Stringing & sagging of 3 phase HT/LT line upto proper sag including laying of ACSR Weasel / rabit Conductor, binding with insulators & jumpering.
Erection of Sectional Double Pole Structure of PCC pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works.
Erection of Sectional Double PCC Pole Structure with the help of one pole already erected including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works.
Construction of Transformer plinth for 250 KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials.
Well type earthing of 250 KVA Transformer by using B class G.I. pipe of 1.5 " dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor.
Fencing of T/F with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing
Mounting of 25 KVA Transformer as per RESSPO norms
Mounting of 63 KVA Transformer as per RESSPO norms
Mounting of 100 KVA Transformer as per RESSPO norms
Mounting of 250 KVA Transformer as per RESSPO norms
Dismantaling of Jarjar ACSR Weasel Conductor/G.I. wire
Cartage of Jarjar ACSR Weasel Conductor/G.I. wire from site to ESC, Mirzapur
Installation of 11 KV VCB pannel (O/G), 200/100/5A
Installation of 11 KV VCB pannel (I/C), 600/300/5A
Testing & commissioning of I/C/O/G 11 KV swichgear
Cartage of received back 10 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 25 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 63 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 100 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of Received Old & Damage AB Conductor
M/s Sharada Electricals
M/s Ayush Enterprises
M.K.S Enterprises
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .