Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | ₹11.5 L | L1 | Accepted-AOC Lowest I |
| 2 | L2₹11.6 LRejected-Finance VILLAGE NAWADA SAIDPUR JALAL POST BHOOTPURI DISTRICT BIJNOR UTTAR PRADESH | BIJNOR | BIJNOR | UTTAR PRADESH | ₹11.6 L | L2 | Rejected-Finance Lowest II |
| 3 | L3₹12.0 LRejected-Finance | ₹12.0 L | L3 | Rejected-Finance Lowest III |
| 4 | L4₹12.3 LRejected-Finance 11A NAURANGABAD ETWAH | ETAWAH | UTTAR PRADESH | 206001 | ₹12.3 L | L4 | Rejected-Finance Lowest IV |
| 5 | Rejected-Technical | - | - | Rejected-Technical Due to incomplete document as per tender condiction |
| Sl No | Description | Qty | Unit | M/S SHAKTI ASSOCIATES L2 | M/S AJAYPAL SINGH CONTRACTOR L1 | M/S HARENDRA SINGH CONTRACTOR L3 | NAWAB ALI L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in ordinary soil including lift upto1.50M & lead upto 30 M & including Back filling, Watering, Ramming of excavated earth, T&P etc. complete. | 220 | Cum | 40 ₹8,800 | 65 ₹14,300 | 40 ₹8,800 | 55 ₹12,100 |
| 2.00 | Laying C.C 1:3:6 in foundation using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 50 | Cum | 3,800 ₹1.9 L | 3,500 ₹1.8 L | 3,500 ₹1.8 L | 4,200 ₹2.1 L |
| 3.00 | Supplying and Laying C.C 1:2:4 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 7 | Cum | 4,800 ₹33,600 | 5,300 ₹37,100 | 4,196.48 ₹29,375.36 | 4,800 ₹33,600 |
| 4.00 | Brick work (M-105 and Above) in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum) | 100 | Cum | 4,600 ₹4.6 L | 3,750 ₹3.8 L | 4,700 ₹4.7 L | 4,300 ₹4.3 L |
| 5.00 | Ordinary Centering & shuttering of Plywood or steel for RCC Work | 200 | Sqm | 200 ₹40,000 | 600 ₹1.2 L | 350 ₹70,000 | 500 ₹1 L |
| 6.00 | Laying C.C 1:1:2 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 7 | Cum | 5,400 ₹37,800 | 7,000 ₹49,000 | 5,865.2 ₹41,056.40 | 6,900 ₹48,300 |
| 7.00 | Laying C.C 1:1.5:3 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 42 | Cum | 5,200 ₹2.2 L | 4,500 ₹1.9 L | 5,255.55 ₹2.2 L | 5,000 ₹2.1 L |
| 8.00 | Supply & Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 2.4 | MT | 54,000 ₹1.3 L | 62,900 ₹1.5 L | 63,125 ₹1.5 L | 62,000 ₹1.5 L |
| 9.00 | Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM) | 120 | Sqm | 70 ₹8,400 | 99 ₹11,880 | 99.83 ₹11,979.60 | 80 ₹9,600 |
| 10.00 | S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 4 | Nos. | 200 ₹800 | 150 ₹600 | 150 ₹600 | 110 ₹440 |
Tender Value
₹14.3 L
EMD Value
₹29,000
Closing Date
25 Feb 2026, 12:00 pmClosed
Executive Engineer
EGCCD6 Najibabad
Construction of Drainage Crossing/V.R.B. at Km. 0.750, Km. 1.025 and Km. 2.120 of Kashmabad Minor.
2026_UPIDC_1117767_9
07/EE/2025-26
Open Tender
Civil Works - Canal
30 days
Najibabad
Please refer tender documents
2 documents required · 2 mandatory
₹266
₹29,000
9 Mar 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
19 Feb 2026 - 25 Feb 2026
Earthwork in excavation in ordinary soil including lift upto1.50M & lead upto 30 M & including Back filling, Watering, Ramming of excavated earth, T&P etc. complete.
Laying C.C 1:3:6 in foundation using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Supplying and Laying C.C 1:2:4 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Brick work (M-105 and Above) in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum)
Ordinary Centering & shuttering of Plywood or steel for RCC Work
Laying C.C 1:1:2 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Laying C.C 1:1.5:3 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Supply & Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM)
S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
Earth work in fiiling for Making ramp including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge.
Earthwork in filling for Making road diversion including all costs of T&P material required for proper completion of work as directed Engineer-in -charge.
Finishing wall with two coat of water proof cement paint Weather coat of approved quality on new surface with this paint to give an even shade including supply of all marerials, labour, Tools & plant etc. required for proper completion of the work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.36 MB
tn7lot9.pdf
Tender Documents • 1.40 MB
BOQ_2077275.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid