| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.5 LAccepted-AOC | ₹47.5 L | L1 | Accepted-AOC L1 1st Lowest Rate Quoted |
| 2 | L2₹47.8 LRejected-AOC MIG 77 ANANTA VIHAR PHASE II POKHARIPUT BBSR 2 | ₹47.8 L | L2 | Rejected-AOC L2 2nd Lowest Rate Quoted |
| Sl No | Description | Qty | Unit | M/s SHIVOM ELECTRICALS AND ENGINEERING L2 | DHIREN KUMAR MAHARANA L1 |
|---|---|---|---|---|---|
| 1.00COMPOUND WALL & SITE DEVELOPMENT | |||||
| 2.00 | Earth work in ordinary soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge. | 198.67 | Cum | 263.5 ₹52,349.55 | 253.25 ₹50,313.18 |
| 3.00 | Filling Foundation and plinth with sand including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. | 386.86 | Cum | 623.66 ₹2.4 L | 599.4 ₹2.3 L |
| 4.00 | Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. | 185.72 | Cum | 5,298.41 ₹9.8 L | 5,092.33 ₹9.5 L |
| 5.00 | Brick work withFly ash bricks 25 cm x 12 cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance +8 percent in cement mortar (1:6) in Superstructure including cost, conveyance, royality etc complete as direction by EIC. | 3.77 | Cum | 5,480.71 ₹20,662.28 | 5,267.54 ₹19,858.63 |
| 6.00R.C.C. work M-20 grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying with Centering & shuttering as direction of EIC. | |||||
| 6.01 | Footing (M20) | 0.42 | Cum | 9,120.67 ₹3,830.68 | 8,765.92 ₹3,681.69 |
| 6.02 | Column (M20) | 2.26 | Cum | 15,675.97 ₹35,427.69 | 15,066.26 ₹34,049.75 |
| 6.03 | Plinth Beam (M20) | 1.3 | Cum | 9,835.17 ₹12,785.72 | 9,452.63 ₹12,288.42 |
| 7.00 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge etc complete as direction by EIC.. | 3.33 | Qntl | 7,816 ₹26,027.28 | 7,512 ₹25,014.96 |
Tender Value
Refer Docs
EMD Value
₹48,910
Closing Date
29 Nov 2025, 5:00 pmClosed
Managing Director, SERIFED
Office of the Managing Director, SERIFED, Saheed Nagar, Bhubaneswar-751007
Construction of Pre Cast Compound Wall and Site Development at SPTUC Nuapatna Cuttack
2025_SERIF_121614_1
VI-09(09)/SERIFED/2025-26/2035
Open Tender
Civil Works - Others
90 days
SPTUC NUAPATNA CUTTACK
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
₹48,910
Yes
12 Dec 2025
21 Nov 2025
1 Dec 2025
21 Nov 2025
29 Nov 2025
21 Nov 2025
Amount
COMPOUND WALL & SITE DEVELOPMENT
Earth work in ordinary soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge.
Filling Foundation and plinth with sand including cost, conveyance, royality etc complete as directed by the Engineer-in-charge.
Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete as directed by the Engineer-in-charge.
Brick work withFly ash bricks 25 cm x 12 cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance +8 percent in cement mortar (1:6) in Superstructure including cost, conveyance, royality etc complete as direction by EIC.
R.C.C. work M-20 grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying with Centering & shuttering as direction of EIC.
Footing (M20)
Column (M20)
Plinth Beam (M20)
Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge etc complete as direction by EIC..
Pre Cast boundary wall with concrete pole (7 ft interval ,8 ft height) including cost, conveyance, royality of all materials etc complete as direction by EIC.
Supplying, fitting and fixing of M.S. grill in windows including screws as may be required etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect as direction by EIC.
MS Grill
Wall painting two coats with 100% Acrylic emulsion paint (1st quality) exterior grade(weather coat) over a coat of primer with all scaffolding and staging charges including cost, conveyance, taxes of all materials, cost of all labours, T & P, sundries etc. as required for the work complete.
Provision for outer street lights complete in all respect as direction by Enginner-in-charge.
Provision for SS letter with gate lights complete in all respect as direction by Enginner-in-charge.
Provision for earth filling in peripheri area complete in all respect as direction by Enginner-in-charge.
Provision for landscaping complete in all respect as direction by Enginner-in-charge.
Provision for front side laying of Kerb stone complete in all respect as direction by Enginner-in-charge.
Provision for front side laying of paver complete in all respect as direction by Enginner-in-charge.
M/s SHIVOM ELECTRICALS AND ENGINEERING (BID ID -3246769)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
DTCN.pdf
Tender Documents • 1.16 MB
BOQ_565683.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid