| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance PATHARA ALIPUR ASKA | ASKA | GANJAM | ODISHA | +0.00% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance AT BANK COLONY PO CHATRAPUR P S CHATRAPUR GANJAM ODISHA | CHATRAPUR | GANJAM | ODISHA | +0.00% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.4 L
EMD Value
₹3,400
Closing Date
13 Aug 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO-II, BERHAMPUR
RI office cum Rest shed at Budhamba_building
2026_CERWI_137980_1
Online Tender/09/SERWD-II/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
30 days
Ganjam
2 documents required · 2 mandatory
₹2,000
₹3,400
Yes
28 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
5 Aug 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Finishing wall surface two coats with any approved weather shield cement paint over a coat of oil bound primerto outer wall surface after celaning surface including cost of paint and primer watering curing with cost conveyance andof all materials and labour with T&P and Cessrequired for the work etc, complete in all respect as per the direction of Engineer-in-Charge. | 61.37 | sqm | 161.88 | ₹9,934.58 |
| 2 | Earth work in excavation of foundation in all kinds of soil including hard moorum, stoney earth mixed with doublers (except sheet rock and boulders requiring blasting) with all leads & lifts including dressing & leveling the bed & depositing the excavated earth at places away from work site with all leads & lifts including Cess and cost of all labour T&P & dewatering if required for the work etc. complete and as per specification and direction of Engineer-In-Charge | 58.5 | cum | 282.89 | ₹16,549.07 |
| 3 | Supplying and filling in foundation & plinth with sand in 23.5 cm (9) thick layers including watering and ramming with all cost, conveyance, Royalty, DMF, EMF & Additional Charges of all materials, and labour with T&P required for the work including Cess etc complete. (Measurement will be taken on finished compacted section only) as per direction of Engineer-in-Charge. | 26.5 | cum | 688.7 | ₹18,250.55 |
| 4 | Providing cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2) size clean hard black hand broken granite stone metal of approved quality and from approved quarry including hoisting lowering and laying concrete in layers not exceeding 15cm (6) thick to the required level ramming, watering & Curing etc. complete including cost & conveyance of all materials with all Royalty, DMF, EMF & Additional Charges and all labour with T&P required for the work with Cess etc, complete including dewatering if required as per direction of Engineer In Charge. | 26.5 | cum | 5,751.28 | ₹1,52,408.92 |
| 4.01 | In Substructure | 8.04 | cum | 5,893.32 | ₹47,382.29 |
| 5 | RCCwork of gradeM-25 having a minimum compressivestrength in work text of 200Kg/cm2 in15cm cubesat 28daysafter mixing and tests conducted using 10mm to 20mm size (20mm not to exceed 25 percent) crusher black broken granite stone chips of approved quality and from approved quarry including hoisting,lowering and laying concrete by using vibrators watering and curing for four weeks centering and shuttering and finishing the exposed surface smooth to receive painting or white or clour wasing providing grooves or beads where neCessary including cost, conveyance and Royalty, DMF, EMF & Additional Charges of all materials and labour required for the worketc, complete with all T&P and Cessin all respect but execludingcost of reinforcement MS rods or tor steel and binding wires of 18 to 20 guage and labour charges etc, complete as per specification and direction of Engineer-in-charge. Foundation base | 1.18 | cum | 6,906.72 | ₹8,149.93 |
| 5.01 | Beams and column | 0.72 | cum | 16,257.06 | ₹11,705.08 |
| 6 | Providing and supplying of HYSD bars confirming toapproved grade including straightening cutting bending bindiing lapping , welding etc confirming to ISI specification) & jointing if neCessary by lapping & tying the grills &placing in position as required for RCC works as per the approved design placing the grills in position including cost & conveyance of tor steel & binding wires of 18 to 20 guage including Cess etc complete as per the specifiction and direction of Engineer-in- charge | 1.1 | qtl | 9,044.19 | ₹9,948.61 |
| 6.01 | Beams and column | 1.5 | qtl | 9,044.19 | ₹13,566.29 |
| 7 | Fly Ash brick masonary in Cement Mortar (1:6) in foundation/Superstructure using-fly ash-brick of 23cm X 11cm X 8cm size having a crushing strength in between 75kg to 100 kg per Sq.cm with dimensional tolerance ± 8% including splays cutting circular moulding chamfering & corbelling watering and curring for 7days after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials & labour required for the work with all Royalty, DMF, EMF & Additional Charges with all T&P & Cess etc, complete in all respect as per the direction of Engineer-in-charge. | 6.16 | cum | 5,823.32 | ₹35,871.65 |
stage.html
html • 0.04 MB
finance_604750.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.83 MB
Tendernotice_1.pdf
PDF • 3.91 MB
BOQ_604750.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .