Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 4 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 5 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹6,818
Closing Date
1 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
NNM
Construction work of drain from Nandan Singhs house to Bharti Store in Pandav Nagar J Block in Ward No. 46.
2026_NNMEE_1149594_5
241/SNV-106 L1/2026
Open Tender
Civil Works
Fixed-rate
30 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹236
NAGAR AYUKT NAGAR NIGAM
₹6,818
19 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinery soil (loam,caly or sand) i/c lift upto 1.5 m and lead upto 30 m and i/c filling watering and ramming of excavated earth | 70.88 | Cum | 112.5 | ₹7,973.44 |
| 2 | Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work. | 3.8 | Cum | 2,930 | ₹11,134 |
| 3 | M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work. | 16.81 | Cum | 4,600 | ₹77,303 |
| 4 | 12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. | 81 | Sqm | 160 | ₹12,960 |
| 5 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 3.86 | Cum | 5,650 | ₹21,809 |
| 6 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. | 0.18 | Cum | 7,300 | ₹1,314 |
| 7 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | 0.1 | Qtl | 8,728 | ₹863.29 |
| 8 | S/ fixing shine board at site +all comp of work | 1 | Nos | 3,000 | ₹3,000 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
NNMT1.pdf
Tender Documents • 6.29 MB
5.pdf
Additional Documents • 0.17 MB
BOQ_2152167.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .