Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.5 L
EMD Value
₹7,060
Closing Date
17 Aug 2020, 4:00 pmClosed
Er.Rajesh Kumar Sumbria
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2020_PWDJK_100216_2
e-NIT No.16 of 2020-21 dated 10-07-2020.
Open Tender
Civil Works
Item Rate
30 days
Basohli
Please refer in SBD
5 documents required · 5 mandatory
₹600
Yes
e-NIT No. name of contr. on Try Challan
₹7,060
Yes
Executive Engineer PWD R and B Division Basohli
27 Aug 2020
11 Jul 2020
18 Aug 2020
12 Jul 2020
17 Aug 2020
14 Jul 2020
13 Jul 2020
Amount
Earthwork in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50m, disposed earth to be leveled and neatly dressed. a) All Kind of soil.
Earthwork in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains pipes and cables etc. over areas (Not exceeding 1.5 mtr. in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.50m including getting out excavated soil and disposal of surplus soil as directed within a lead of 50 mtr. a) All Kind of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level. (including all leads & lifts carriages of material by MT/H.L)
a) 1 : 5 : 10 (1 cement : 5 fine sand : 10 graded nallah stone aggregate 40mm nominal size).
b) 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded crusher stone aggregate 20mm nominal size).
Random Rubble Masonary with hard stone from nallah in foundation and plinth including leveling up with cement concrete 1:612 (1 cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 cement: 6 coarse sand) (including all leads & lifts carriages of material by MT/H.L)
Dry random rubble masonry in foundation and plinth using nallah stone with bond stone (including all leads & lifts carriages of material by MT/H.L)
Providing and laying Damp Proof Course 50mm thick with cement concrete 1: 2 : 4 (1 Cement : 2 coarse sand : 4 graded crushed stone aggregate 12.5mm nominal size) (including all leads & lifts carriages of material by MT/H.L)
Centering and shuttering including strutting, propping etc. and removal of form work for:- a) Foundations, footing, bases of columns etc for mass concrete.
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand). a) Flush Pointing (including all leads & lifts carriages of material by MT/H.L)
Hand packing stones in wire crates of B.A. wire 4mm & mesh of size 10cm x 10 cm including cost of stones, wire crates, including all leads & lift (complete job). The wire crates length should not exceed 6.00 mtr (including all leads & lifts carriages of material by MT/H.L)
Carriage of the following materials by Mechanical Transport from source to site of work incl. loading, unloading and stacking complete :- a) Sand from Kathua for an average lead of 81.00 Km. by M.T. b) Stone aggregate 40mm nominal size & above from Lohai nallah for an average lead of 16.00 Km. by M.T. c) Stone aggregate (Crusher Bajree) below 20mm nominal size for an average lead of 81.00 Km by M.T. from Kathua. d) Stones / boulders from Lohai nallah for an average lead of 16.00 Km. Km. by M.T.
Romesh Lal
Sardar Singh
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .