Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹4.4 L+₹23,279 (5.65%)Rejected-Finance | 2 | Rejected-Finance 2 |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
1 Mar 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
U.M.B.D.G.C.KHURJA
Construction of V.R.B.
2021_UPIDC_545204_52
05/EE/2020-21
Open Tender
Civil Works - Canal
Item Wise
60 days
U.M.B.D.G.C.KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹177
₹9,000
1 Apr 2021
23 Feb 2021
1 Mar 2021
23 Feb 2021
1 Mar 2021
23 Feb 2021
90 days
Amount
Earth Work in Excavation of Foundation in dry ordinary soil including lift upto 1.5 M and Lead upto 30 M and including filling, watering and ramming excavated earth into the trenched or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth.including all cost of material, labour & T&P etc.
Cement Concrete 1:4:8 with Cement, Course Sand, Stone Grit with all cost of material, labour & T&P etc.
Brick Work M-150 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc.
R.C.C. 1:1.5:3 with cement, coarse sand, Crushed stone grit including sost of all material labour and T&P.
C.C. 1:2:4 with cement, coarse sand, Crushed stone grit including cost of all material labour and T&P.
Centering& Shuttering of RCC work including all cost of material, labour & T&P etc.
Steel Reinforcement work i/c cutting, bending, binding placing in position i/c cost of binding wire & steel i/c all cost of material, labour & T&P etc.
12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc.
Earth work in making bundha in U/s and D/s
Earth Work in Filling including lead upto 700 M & lift upto 1.5 M including dressing, ramming by Manual Labour or Machine including all cost of material, labour & T&P etc.
Laying Brick on edge soiling laid dry filling joints including preparation of base to proper slope and its ramming including all labour, T&P ect. required for proper completion of work complete.
M/s VIJAY ASSOCIATE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .