Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | -28.00% | ₹4.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.4 CrAdmitted-Finance | -26.27% | ₹4.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹4.7 CrAdmitted-Finance | -21.25% | ₹4.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹4.7 CrAdmitted-Finance F 8 35 RAMPUR GARDEN BAREILLY UTTAR PRADESH 243005 | BAREILLY | BAREILLY | UTTAR PRADESH | 243005 | -21.00% | ₹4.7 Cr | L4 | Admitted-Finance |
Tender Value
₹5.9 Cr
EMD Value
₹11.8 L
Closing Date
22 Jun 2026, 10:30 amClosed
Superintending Engineer Electrical Circle, UPAVP.
Superintending Engineer, Electrical Circle, UPAVP, Vrindavan Yojna, Lucknow
External Electrification of 04nos. of 11 KV Feeders (Underground system) from 33/11 KV Sub -Station located at kuti Krishna vihar of UPPCL for 603 nos. EWS flats of PMAY (Urban), other residential and commercial plots in Ajantapuram Yojna, Ghaziabad.
2026_UPHDB_1151394_1
438/M6-ED-2/38 Date 18.05.2026
Open Tender
Electrical Works
Percentage
270 days
Ajantapuram Yojna
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
Executive Engineer, E.D.-II, UPAVP, Ghaziabad
₹11.8 L
Yes
7 Jul 2026
21 May 2026
22 Jun 2026
21 May 2026
22 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | S/F of 11 KV section dead and double pole structure (RISER) made of following types of supports duly grouted plinthed plastered, painted and numbered in the same manner as already specified for supports as per design incluidng channels, clamps, S.T. pole grouted with 1:4:8 cement concrete (1-cement , 4fine sand and 8-OBB of 40mm. nominal size) including plinthing with 20 mm. nominal size stone grit 10 Cm. Below the G.L. and 30Cm. Above the G.L. and plastering with 1:4 cement mortar painting and numbering of pole and making strip with enamel paint complete with all material and T&P etc. required for proper completion of work.
S.T. GI BOTTOM Pole SP-55, 11.00 Mtrs. Long
page no....... | 16 | No. | 51,722 | ₹8,27,552 |
| 2 | Supply delivery, testing and commissioning of 11KV (E) XLPE cable having compacted circular stranded aluminium conductor, conductor screening of extruded semi conducting compound. Cross linked polythylance (XLPE) insulation screening of the extruded semi conducting compound followed by copper tape, cores laid up, taped PVC inner sheath, single layer of steel strip armouring, overall PVC outer sheath conforming to IS: 7098/Part-II/ with latest ammendment for following mentioned sizes.It should be operational at 11KV, 50 Hz AC system. Complete in all respects.
300 sq mm 3 core H.T. Cable
page no....... | 11,748 | Rm. | 3,671 | ₹4,31,26,908 |
| 3 | Drilling of road parallely and road crossing at depth 2/3 mtr as required and laying charges of cable and 160 mm dia HDPE pipe. complete with all material, labour, drilling machien and T&P etc. required for proper completion of work.
page no....... | 10,500 | Mtr | 670 | ₹70,35,000 |
| 4 | Supply of HDPE pipes (upto PN 6 Kg Pressure Rating material Grade PE 80, Pressure Rating PN 6.0, Nominal Dia (MM):160) as per relevants IS suitable for HT XLPE cable & as Required and as per relevant tecnnical specification.
160 mm dia HDPE Pipe
page no....... | 10,500 | Mtr | 619 | ₹64,99,500 |
| 5 | S/F of G.I. Pipe of following sizes for cable duly clamped with supports by 2 No. with clamps of 50 x 6 mm M.S. flats bolts, nuts and washer required for proper completion of work. (M.R.)
100mm dia
page no....... | 192 | Rm. | 1,191 | ₹2,28,672 |
| 6 | S/Making of suitable Earth of O/H line pole with 2.5 Mtr. Long 20 mm dia M.S. rod complete with 7/16 SWG G.S. wire in 2.00 Mtr. Long 15 mm dia G.I. Pipe (0.96 Kg/Mtr.) duly clamped on pole with 3 Nos. 20 x 3 mm M.S. flate clamp with bolts nuts and washers complete with all material labour and T&P etc. rerquired for proper completion of work.
page no....... | 32 | No. | 1,086 | ₹34,752 |
| 7Supply and jointing of In-door/Out-door type 11 KV Jointing Kit (HEAT SINK) for XLPE cable including cost of all material labour T&P etc. as per proper completion of work. (make:- Raychem/ Dension/ 3M). | |||||
| 7.1 | Outdoor type DSR-2022, 10.5.4
(i) 300 sq mm outdoor type Jointing Kit | 64 | No. | 18,149 | ₹11,61,536 |
| 8Supply, Delivery Installation, Testing & Commissioning of 11 KV Straight through cable jointing kit of 3 core cable jointing Complete in all respects as required for proper completion of work.(make:- Raychem/ Dension/ 3M) As per DSR-2022, 10.6.4 | |||||
| 8.1 | (i) 3CX240/300 sq.mm. | 6 | No. | 33,353 | ₹2,00,118 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
Financial.pdf
Tender Documents • 0.45 MB
Technicaldoc.pdf
Tender Documents • 11.28 MB
BOQ_2156685.xls
BOQ • 0.53 MB
438.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].