Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹1.5 Cr | 1 | Accepted-AOC L-1 BIDDER |
| 2 | 2Rejected-AOC SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | - | 2 | Rejected-AOC L-2 BIDDER |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non responsive |
Tender Value
₹1.5 Cr
EMD Value
₹2.5 L
Closing Date
3 Mar 2020, 3:00 pmClosed
CE (GEN) ATPS
CE (GEN) ATPS
Work contract for AOH of pressure parts including breakdown maintenance for two years of Pressure Parts of 1X 210 MW unit ATPS, MPPGCL, Chachai.
2020_MPPGC_73872_1
2544/MM-III
Open Tender
Miscellaneous Works
Item Rate
30 days
ATPS Chachai
As per NIT
13 documents required · 13 mandatory
₹5,000
Payable To
₹2.5 L
Yes
12 Mar 2022
30 Jan 2020
6 Mar 2020
30 Jan 2020
3 Mar 2020
30 Jan 2020
Part - I Annual Overhaul of Pressure Parts of 210 MW unit no. 5 ATPS MPPGCL Chachai. Cleaning of Boiler & Ducts
Inside cleaning of Furnace & inspection of W/W, PTSH, RH, SCREEN, Final Super Heater with the help of sky climber and assistance in thickness measurement of tubes. OR item Sl. No. 1.02
Erection & dismentling of cup lock Scaffolding in furnace up to roof tubes, Re-heater, Platen Super Heater, Final Super Heater and assistance in thickness measurement of tubes(D-metering).
Cleaning and inspection of LTSH, Economiser, steam cooled wall, supply tube, inspection & assistance in thickness measurement of tubes of above area. Necessary scaffolding in above area will be in the firms scope.
Inside cleaning of pent house,cat house and dead chamber
Repairing of pent house,cat house and dead chamber.
Out side cleaning of Boiler.
Out side cleaning of Pent house & roof
Repair/complete servicing of Boiler manholes
Repair/complete servicing of Boiler peepholes
Removing damaged/defective protion of boiler tubes/bends replacement & TIG/HP welding joint in the following areas.
Water walls/screen tube.
Pt.Sup.Heater/Final super heater.
Roof tubes/ Spacer tubes.
Reheater
Economiser
L.T.S.H. & associated steam cooled walls.
Drain lines of SH/RH spray/Drum root valve lines / other location.
Fin welding alongwith fabrication and fitting in WW, Extd ww, Steam cool wall.
Metal buildup on eroded H.P.tube Size - 2"x 2"
Strenthing/Rewelding (Reinforcement) of old eroded H.P.Joints
Repairing/ Replacement of economiser coils
Fitting of scalopad bar in all 4 ash panel corners.
Checking,cleaning & rectification of buckstay corner joints including stirrup.
Removal & replacement of hand hole plugs which includes repairing of plug, rewelding, preheating & stress relieving.
Fixing of readymade protection sleeve on screen/ water wall/ PSH/Reheater/ LTSH/ Ecnomiser Tubes.
Repairing/Repalcement and realignment of cassette baffle of economiser top and bottom coils.
Repairing/Replacement and realignment of cassette baffles of LTSH coils.
SERVICING OF VALVES:-
Servicing of Safety valve
Main steam stop valve size 350 NB.
Feed line valve, economiser inlet,Eco.NRV etc.heavy duty valves size 300Nb.
Size 150mm Nb.
Size 65mm Nb.
Size 40mm Nb.
Size 25mm Nb & below.
Replacement of H.P. root valve of impulse line.
Replacement of H.P.Line thermowell instruments.
Replacement of glands of H.P.Valves Size :- Upto 65 Nb
Replacement of glands of H.P.Valves Size :- Above 65 Nb
REPLACEMENT OF VALVES
Replacement of HP Valve size 65 Nb .
Replacement of HP Valve size 40 Nb .
Replacement of HP Valve size 25 Nb & below.
Servicing & repairing of oil heating unit.
Complete overhauling of Boiler fill pump.
HP Joints of tracing line.
Servicing of critical piping hangers.
REFRACTORY:-
Castable refractory removal & reapplication.
INSULATION
Removal and reapplication of insulation in the following areas:- a) Critical piping.b) boiler furnace c) Ducts.
G.I./Corugated or Plain Aluminium Sheeting work over insulation at above areas of boiler.
Servicing of LRSB
Servicing of WW SB.
Inspection of Boiler Drum
Fabrication of Pressure part bends.
Fabrication/ Repairing of Box in wind box water wall tubes.
Work of Hydralic Test/ Steaming test (online inspection) of Boiler for FY- 2020-21
Assistance in RLA
DPT Test kit and Testing
Part -II Breakdown Miantenance of Pressure parts & its. Auxilliaries., After AOH after (from 2020 to 2022)
Initial mobilization and scaffolding, including cleaning of inside boiler including Super - Heater & Re - Heater zone.
Replacement of damaged H.P. tubes by new one & welding of H.P. joints
Water walls Tubes (size 63.5 x 5.6 mm) and Screen Tubes (size 76.1 x 7.1 mm)
Super Heater Tubes ( Platen , Roof ,Final ,Low Temperature, Steam Cool Wall etc of sizes 44.5 mm to 50 mm)
Re-Heater Tubes (Size 54 mm)
Economiser Tubes (Size 44.5 X 4.5 mm)
High Pressure Drain Lines (CBD, IBD SH drains etc)
Fin welding of H.P. tubes in W.W & S.C.W.
Metal build up on eroded H.P. tubes size 2” X 2”
HP Joint of Tracing lines
Replacement of HP Valves
65 NB & above
25NB & Below size
REPAIRING/REPLACEMENT OF COAL BURNER
Replacement of coal nozzle assembly & adjustment
Replacement of Wind Box corner door cover plate bolts
Work of Hydralic Test/ Steaming test (online inspection) of Boiler for FY- 2021-22
K K POWER CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .