| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC 12 MANAULI HOUSE AMBALA CITY 134003 HRY | AMBALA CITY | AMBALA | HARYANA | 134003 | ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.5 Cr+₹4.4 L (3.09%)Rejected-Finance 186 GANDHI MARKET AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹1.5 Cr+₹4.4 L (3.09%) | L2 | Rejected-Finance Found in order but L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Your firm not enlisted in desired category as per NIT. |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
20 Mar 2025, 6:00 pmClosed
HQ CWE Meerut
29J The Mall Road Meerut Cantt Uttar Pradesh 250001
AUTOMATION OF MALL ROAD SN PARK AND CL ONE AND HALF HT FEEDER AT ROORKEE ROAD UNDER GE (U) E/M MEERUT CANTT
2024_MES_687427_2
94116/MRT/2024-25/E8
Open Tender
Civil Works
Item Rate
180 days
Meerut Cantt
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE (U) E/M Meerut
₹2.2 L
Yes
3 Jun 2025
12 Feb 2025
24 Mar 2025
12 Feb 2025
20 Mar 2025
6 Mar 2025
Amount
Supply, installation, testing and commissioning of LT switchgear panel board, IP-54 (outdoor Type), 415VAC, 50Hz, three phase & neutral (4 wire) having suiatable size & rated capacity busbar chamber with insulated Aluminum busbars, 4pole cubical type, factory made out of 3.15 mm thick CRCA sheet structure mounted on PCC platform of rigid mild steel angle iron frame of 50mmX50mmX5mm with 750mm long extended legs grouting in PCC platform in u shape in front of panel & platform bottom area bounded with single brick work & filled with sand from which cables entre into panel bottom, duly epoxy powder coated internally & externally with approved shade, rubber gasketed, hinged front & back openable doors & proper locking arrangements for dust & vermin proof incl the following parameter:- (a) Suitable for existing cap of the transformer with suitable capacity of 3 phase KVAR covering induction power loss with on /off Time ranges Adjustment range Start-up suppression time (3s to 3min),Tripping delay (1s to 40s), Input circuit supply voltage 230V AC terminals Tolerance 230V AC ±10% . Rated frequency (48 to 63Hz) with Limit the Inrush Current. (b) Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for existing Panels , Phase Missing, Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. also special zero crossing switching operation protection system digital display of line phase voltages and line current incl frequency Phase unbalance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting current 5A (Above 5A - external CT setting max.1000/5 in steps of 5, Setting Accuracy Current ± 5% of full scale ±1digit).(c) Trip time delay 1 to 250 secs settable for Unbalance, Overvoltage, Undervoltage ( Line to Line & Line to Neutral), Undercurrent & Overcurrent, Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., (d) Phase Reversal Auto tripping, Phase Unbalance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ), Recovery Time 2 sec Min Power On Delay10 sec Max., Service life 10 Lakh operations minimum protection system should be provided with each fault digital display. (e) Compensation of each phase, Measure power factor , total watts, total VAr, total KWH, Total KVArh, Programmable THD protection, Programmable Discharge Time Certified. Note :- The Entire work at site is to be executed only by OEM approved as directed by engineer in charge. The Contractor has to submit Original Purchase Vouchers, Test Certificates & Guarantee Certificate from OEM before installation at site. All type Test Certificates and Design varification with switch gears (ACB & MCCB) as per confirming to IS/ IEC: 61439/2011 The drawing of LT Panel with connected accesories should be submitted for verification of Engr-in-Charge before execution of work.
All as per Srl item No 1 above complete but for 100KVA ,160KVA & 200KVA transformer- MCCB 400A 4P 50KA MCCBs integrated with RS-485 meter. The system will also include an RTU for remote operations, metering with Auxiliary contact blocks, ROH & other accessories, Spreaders as incomer & panel mount or flush mount power meter with a 96mm by 96mm size having backlit LCD display of 128 by 128 pixels. The meter measures active energy as per accuracy class, Class 1.0 complying to IEC 62053-22 standard with sampling rate of 64 samples per cycle. Able to measures all three vectors of power and energy such as Active, Apparent & Reactive beside Voltages, Current, Frequency and Power Factor incl the total Harmonic Distortion, 50Hz or 60Hz network frequency and accepts universal control power voltages ranging from 80 to 300 V Line to Neutral AC or DC voltages. Rated current 1A or 5A input having RS485 communication port over Modbusl. panel will also be integrated with protection system with Micro controller-based indicator with inbuilt Temperature measurement in single enclosure. Incorporates highly stable built-in or Remote Temp. 3 Digit, 0.56" bright LED display for displaying Temperature. Software Calibration for 2 channels. MODBUS RTU multi drop RS-485 serial communication, etc. transmitting power supply – 24/5 V DC 100 MA with isolation based SMPS type, Indication Temperatures, control mode Auto tune / Self tune PID or ON-OFF Relay: SPDT: 10A resistive @ 230V AC / 30V DC temprature controler complete directed by the Engineer-in-Charge will be fulfilled the requirement by the contractor at no extra cost. Note: This includes all necessary site supervision, documentation, and training for client personnel to operate and maintain the system complete fabrication, mounting, wiring, and configuration of all components, including establishing RS-485 communication and ensuring seamless integration with existing systems as design by OEM. contractor is also covers all electrical connections, communication setup, functional testing, and remote operation verification to ensure full functionality and compliance with project specifications.
All as per Srl item No.1 here-in-before complete but for 250 KVA ,315 KVA & 400KVA transformer- MCCB 800A 4P 50KA MCCBs integrated with RS-485 meter, include an RTU for remote operations, metering with Auxiliary contact blocks, ROH & other accessories, Spreaders as incomer & panel mount or flush mount power meter with a 96mm by 96mm size having backlit LCD display of 128 by 128 pixels. The meter measures active energy as per accuracy class Class 1.0 complying to IEC 62053-22 standard with sampling rate of 64 samples per cycle. Able to measures all three vectors of power and energy such as Active, Apparent & Reactive beside Voltages, Current, Frequency and Power Factor incl the total Harmonic Distortion . 50Hz or 60Hz network frequency and accepts universal control power voltages ranging from 80 to 300 V Line to Neutral AC or DC voltages, rated current 1A or 5A input. having RS485 communication port over Modbus. Panel will also be integrated with protection system with Micro controller-based indicator with inbuilt Temperature measurement in single enclosure. Incorporates highly stable built-in or Remote Temp. 3 Digit, 0.56" bright LED display for displaying Temperature. Software Calibration for 2 channels. MODBUS RTU multi drop RS-485 serial communication, etc. transmitting power supply – 24/5 V DC 100 MA with isolation based SMPS type, Indication Temperatures, control mode Auto tune / Self tune PID or ON-OFF Relay: SPDT: 10A resistive @ 230V AC / 30V DC temprature controler complete as directed by the Engineer-in-Charge will be fulfilled the requirement by the contractor at no extra cost. Note: This includes all necessary site supervision, documentation, and training for client personnel to operate and maintain the system complete fabrication, mounting, wiring, and and configuration of all components, including establishing RS-485 communication and ensuring seamless integration with existing systems as design by OEM . Contractor is also covers all electrical connections, communication setup, functional testing, and remote operation verification to ensure full functionality and compliance with project specifications.
All as per Srl item No.1 here-in-before complete but for 500 KVA transformer- ACB 1000A 4P 65KA ACBs integrated with RS-485 meter. The system will also include an RTU for remote operations., metering with Auxiliary contact blocks, ROH & other accessories, Spreaders as incomer & panel mount or flush mount power meter with a 96mm by 96mm size having backlit LCD display of 128 by 128 pixels. The meter measures active energy as per accuracy class Class 1.0 complying to IEC 62053-22 standard with sampling rate of 64 samples per cycle. Able to measures all three vectors of power and energy such as Active, Apparent & Reactive beside Voltages, Current, Frequency and Power Factor incl the total Harmonic Distortion. 50Hz or 60Hz network frequency and accepts universal control power voltages ranging from 80 to 300 V Line to Neutral AC or DC voltages. Rated current 1A or 5A input. having RS485 communication port over Modbus. Panel will also be integrated with protection system with Micro controller-based indicator with inbuilt Temperature measurement in single enclosure. Incorporates highly stable built-in or Remote Temp. 3 Digit, 0.56" bright LED display for displaying Temperature. Software Calibration for 2 channels. MODBUS RTU multi drop RS-485 serial communication, etc. transmitting power supply – 24/5 V DC 100 MA with isolation based SMPS type, Indication Temperature, control mode Auto tune / Self tune PID or ON-OFF Relay: SPDT: 10A resistive @ 230V AC / 30V DC temprature controler complete as directed by the Engineer-in-Charge will be fulfilled the requirement by the contractor at no extra cost. Note: This includes all necessary site supervision, documentation, and training for client personnel to operate and maintain the system complete fabrication, mounting, wiring, and configuration of all components, including establishing RS-485 communication and ensuring seamless integration with existing systems as design by OEM . contractor is also covers all electrical connections, communication setup, functional testing, and remote operation verification to ensure full functionality and compliance with project specifications.
Supply, Laying, jointing, Testing & commissioning LT cables, 1100 volts, PVC insulated & heavy duty aluminum unarmoured conductors, ISI marked, having terminal lugs, Laid in LT panel to transformer. Complete all as specified & directed.
(a) 185 Sqmm single core for 100 KVA to 400KVA transformer
(b) 240 Sqmm single core for 500KVA transformer
Supply, Installation, Testing and Commissiong of Software/Server alongwith Hardware, Software complete of ISO 50001: 2018/ ISO 9001 : 2015 certified 'Energy Monitoring System with all parameter required to make transfromer healthy having 35 Nos 11/.0415 KV TRF with Breaker and control of all data as desired complete all as specified and as directed as detailed here in below:-
Server at AGE E/M office includes following :- i) application software shall have minimum following inherent features :- (a) Online state of server/communication front ends. (b) Connection status of all the RTU/PLC station. (c) Connection status of all equipment at server room. (d) Connection status of all the Server station. (e) Data analysis (Comparison between last day value with present value ) and recording all parameters for time interval of 5 min, 15 min configurable as per user requirement (f) Reporting (Power consumption, Input & output electric consumption and eletric parameter, parameter phase wise ( A, V,KVA, KW, PF, KVAH, Hz) (g) Facility to define certain alarms with audible sound to attract the attention of the operator as per user requirement for CMD control, PF control, tripping and malfunctioning of breaker etc (h) SQL data base (i) Asset Management in single screen display as user requirement. (j) System should support adding more parametrs in future with minimal changes. k) This should allow export/import of Tag Configuration Data and Configuration data for all, Visualization /Reporting / Monitoring component as well as connector utility and device configuration data for all sites. This should be in either of CSV / Excel/ XML format. l) There should not be any limit on the number of tags and screens to be configured in the system and the number of users to be allowed in the system. Note:- Contractor has to be ensure for minimum 5 years of technical support for monitering system. (k) PLC software for configuration,troubleshooting or modification the program in future with respective license key.
(ii) Performance Management: Software platform that allows to see, measure and manage energy and sustainability initiatives across your entire enterprise. With the addition of Performance Analytics, view of all of consumption-related data streams so user can view, interact with and analyze all near real-time facility data in a single platform. To facilitate continous utility and energy management and increased operational efficiency > Enable organisation to reduce energy use upto 5% > Perform portfolio, building and system level energy performance analyisis > Benchmarking site performance across portfolio > Identifying non-optimized facilities, equipment and behavioral inefficiencies > Monitoring and controlling consumption to identify anomalies > Energy Management report generation > Calculate and report green house gas emssions > Provide public dashboard and kiosk to inform and educate occupant
Supply, installation, testing & commissioning of Transformer analytics services with 5 years subscription for health monitoring Multi Sensor probe oil sensor type for monitoring oil temp with all essential power data of transformer.
The solution should be capable to deliver the following KPIs 1.Measurements a.Measure of oil temperature. b.Measure partial discharge activity 2.Predictive Capabilities . a.Help asset engineers to assess transformer risk. b.Configurable notifications to alert users when transformer risk parameters exceed levels specified by IEEE and CIGRE standards and make recommendations for action. d.Have Fleet-wide view – ability to rank transformers based on multiple parameters including risk and forecast Life Left. 3.Data Storage a.Store and analyse offline DGA data across the fleet. b.Keep track of major maintenance works. 4.Solution Accessibility a.Be web accessible easily access from around the world.
Supply , installation , testing & commissioning of Digital inputs & Digital outputs in exisisting outgoing MCCBs / Fuse switch units or MCB of any make / type with capacity from 20 Amp to 400 Amp 3 phase type provided binary signal either ON or OFF, applied to the PLC processor from a new digital field input device. General Status: TRUE/FALSE, HIGH/LOW, and 1/0 ,Load Condition: ON/OFF ,Switching Mechanism: ENERGIZED/DE-ENERGIZED,ACTIVATED/DEACTIVATED Switching Contact Status: CLOSED/OPEN system must be compatible for characterized by voltage or current signals whose range of values is much more than just 1 or 0.with signals received by a PLC can either be 12-bit or 13-bit signals. System must be suitable for analog PLC output is a time-varying or continuous signal from the PLC CPU to the field output devices analog PLC output can either be a current or voltage signal. In most PLC systems, the analog output modules supply either voltage or current signals to field output to display live interface.
Supply, testing, commissioning & validation of Networking Component and integration with field devises & server with the following :-
Supply, Erection, Testing and Commissioning of Remote Terminal Unit (RTU) along with Digital Input Modules (DI) 14 Nos, Digital Output (DO) Moules 10 Nos . This includes installation in complete respects as per specifications mentioned below :- (a).Outputs include two fast (PWM/PLS) and eight regular transistor types. (b).Input voltage is 24 V DC with sink or source logic options. (c).Discrete outputs deliver 0.5 A current with negative sink logic type. (d).Maximum power consumption is 10 W under full operational load. (e).Instruction execution speed is 0.2 µs for basic Boolean operations. (f).Event task response time is rated at 60 µs for quick reactions. (g).Up to 14 PID control loops can run simultaneously and be adjusted. (h).Positioning features include PWM/PLS channels at up to 100 kHz speed. (i).High-speed input supports quadrature, pulse, and CW/CCW counting modes. (j).Internal memory includes 512 bytes with optional 32 GB SD card. (k).Backup battery (BR2032) lasts two years 500 VA with connected accesories, ensuring uninterrupted operation. (l).Ethernet Modbus TCP/IP communication uses an RJ45 connector for networking. (m).Serial ports offer RS232/RS485 with isolated and non-isolated configurations. (n).USB Mini-B port is included for programming and data transfer. (o).Protection features include overload and short-circuit safeguards for safety. (p).Automatic system reset activates within one second after fault conditions. (q).Environmental tolerance includes 0–55 °C operation and 10–95% humidity. (r).IP20 protection ensures durability with a cover in place. (t).Device dimensions are 90 mm height, 130 mm width, and 70 mm depth. (u).DIN rail or panel mounting options ensure versatile installation choices. (v).It is certified with CE, UL, CSA, and other international standards. (w).Meets IEC 61131-2 and IEC 61010-2 standards for safety and control. (x).Communication protocols include Modbus, and Ethernet TCP/IP. (y).Power protection handles inrush current and tolerates short power interruptions. (z) Supply and fixing Contact multiple relay suitable for operation with digital input and output module of RTU mentioned at Sr Item No.5 of BOQ.
Supply,Installation, Testing and Commissioning of Modbus Communication Cable with 2 Nos of pair 0.5 Sqmm tinned copper Standed cable, HDFM PE insulation 2.6 mm Aluminium Foil polyester Tape Sheilded with over all sheild of tinned copper with supply and fixing Cable Tray fabricated out of hot dipped GI sheet of size 75mmx25 mmx1.6 mm Cleated or grouped GI saddles. Interval for cleating shall not exceed 1500 mm of 2 run.
M&L for Cat 6 Cable LAN U/UTP 2x4P 50m length all as directed by Engineer-in-Charge.
M&L for 10 port Ethernet network Switch TCP/IP unmanaged switch (Shielded RJ45 copper cable connection type, Supply voltage 24V DC, LED for power supply and per channel copper port activity, CE marking Ethernet switch) and necessary protection MCBs all as directed by Engineer-in-Charge.
IT network cable. (a)Power Supply Card ( 48 Volts, DC) (b) Control Card with Alaram cables and Terminal:-3 (c) Fibre Patch Cord - 2 meters (Qty:-4) (d) Liu Port at server location ( Qty:- 2) (e) Media Converter cards - QTY:-2 (f) Installtion & Programming. (g) Configuration of each location at server point.
Supply and fix base Workstation / operator console Hardware for Server for monitoring and reporting Intel(R) Xeon(R) Processor Powered by Intel Xeon E-2300 processors, it supports up to 128 GB of DDR4 UDIMMs at 3200 MT/s, PCIe Gen 4, and enhanced thermal efficiency. It integrates the EMC OpenManage portfolio for efficient IT infrastructure management, featuring tools like telemetry streaming, restful APIs, and seamless update capabilities. With a cyber-resilient design, it ensures data and system security through features like cryptographically signed firmware, secure boot, and system lockdown. The T150 is optimized for office environments with quiet acoustics and supports a wide range of operating systems and hypervisors, making it versatile for various business-critical application 16GB RAM, 1TB 3.5inch SATA (7,200 Rpm) Hard Drive x 1, 16X Half Height DVD +/- RW x 1, Intel XEON Processor3.5Hz 8M cache,4C/4T Turbo,71W,TPM/ 4 DIMMS / 1x8GB UDIMM/ Upto 3, 3.5" SATA Drives /1 x 1TB 7.2K RPM Label x 1, NVIDIA(R) Quadro(R) K620 2GB (DP, DL-DVII) (1 DP to SL-DVI adapter) x 1, External Speaker Not Included x 1, 1Gbit NIC add-in card (PCIe- Intel) x 1, No Wireless LAN x 1,Optical Mouse MS116 Black x 1, Multimedia Keyboard KB216 Black (US International - QWERTY) x 1, Windows 10 Pro (64bit) English x 1, Windows 10 Pro OS Recovery 64bit - DVD x 1 Antivirus Quick heal Server Edition with 3 years Subscription # Limited Warranty: Initial Year (NBD) x 1 # Limited Warranty: Initial Year (POW) x 1 Onsite Service Yr 2-3 x 1, 3Yr Onsite Service x 1, Entry SATA 3.5" Cabled Hard Drive /Onboard* /DVD+/-RW / Power Supply, 300W /Intel AMT 12.0 /3YR Pro Support Next Business Day Onsite Service. of Server / work station PC and software with 65 inch monitor 1,366 x 768) HDMI-2 port A3 PRINTER,Bidder should be ensure the storage data of reporting minimum storage capacity should be 1 year and any items required should be maintained by contractor without any cost implication. This is to be installed at Roorkee Road.
Earthing for LT Panel complete with galvanised steel earth plate electrode 60 cm x 60 cm x 6 mm thick buried directly in ground (earth pit not less than 2.25 m below normal ground level) with top edge of the plate at a depth not less than 1.5 m below ground level, the earth electrode surrounded by adequate quantity of charcoal dust and salt to a packed thickness of 15 cm on all sides, connected by GI earth strip of size 32 x 6mm thick pto 7.50 metre, including nuts, bolts, check nuts & washers of galvanized iron or steel and riveted to earth plate at one end and connecting to running earth wire/over head line conductor along pole at the other end, revetted to earth plate. GI earth strip will be protected by using 40mm bore GI pipe (light grade) from test point to main board. The earthing includes PCC pit chamber, RCC pit cover and frame, watering pipe 20mm bore, funnel with wire mess with necessary earth work including disposal of surplus soil to a distance not less than 50 Mtr etc complete all as specified and shown in electrical plate No 3 of SSR Part-I.
M/S Sonu Traders (BID ID -3261540)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .