| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹29.9 L+₹2.9 L (10.9%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹30.5 L+₹3.5 L (13.1%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹31.6 L+₹4.7 L (17.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹33.7 L+₹6.8 L (25.2%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mohd Latief Butt L7 | khan Majid L8 | SAJID WANI L5 | M/S M.A CONSTRUCTION L6 | MUSHTAQ AHMED RATHER L2 | nadiya shameem L4 | manzoor ahmed L3 | Bilal Ahmed Wani L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed | 330.32 | Cum | 300 ₹99,096 Lowest | 450 ₹1,48,644 | 391.73 ₹1,29,397.24 | 400 ₹1,32,128 | 600 ₹1,98,192 | 400 ₹1,32,128 | 550 ₹1,81,676 | 300 ₹99,096 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 20mm nominal size | 14.92 | Cum | 550 ₹8,206 Lowest | 7,500 ₹1,11,900 | 4,000 ₹59,680 | 4,500 ₹67,140 | 4,000 ₹59,680 | 1,200 ₹17,904 | 9,400 ₹1,40,248 | 6,500 ₹96,980 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size | 95.5 | Cum | 1,100 ₹1,05,050 Lowest | 8,000 ₹7,64,000 | 7,838.71 ₹7,48,596.81 | 5,700 ₹5,44,350 | 6,000 ₹5,73,000 | 6,400 ₹6,11,200 | 4,000 ₹3,82,000 | 7,200 ₹6,87,600 |
| 4.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 47.75 | Cum | 233 ₹11,125.75 | 350 ₹16,712.5 | 500 ₹23,875 | 100 ₹4,775 Lowest | 400 ₹19,100 | 200 ₹9,550 | 2,500 ₹1,19,375 | 500 ₹23,875 |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size | 71.62 | Cum | 20,000 ₹14,32,400 | 8,500 ₹6,08,770 | 7,000 ₹5,01,340 | 10,000 ₹7,16,200 | 10,000 ₹7,16,200 | 6,700 ₹4,79,854 | 3,000 ₹2,14,860 Lowest | 7,500 ₹5,37,150 |
| 6.00 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars | 3,265.08 | Kg | 160 ₹5,22,412.8 | 300 ₹9,79,524 | 120 ₹3,91,809.6 | 120 ₹3,91,809.6 | 115 ₹3,75,484.2 Lowest | 118 ₹3,85,279.44 | 181 ₹5,90,979.48 | 120 ₹3,91,809.6 |
| 7.00 | Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended. | 562 | Each | 800 ₹4,49,600 | 400 ₹2,24,800 | 770 ₹4,32,740 | 298 ₹1,67,476 Lowest | 500 ₹2,81,000 | 500 ₹2,81,000 | 300 ₹1,68,600 | 400 ₹2,24,800 |
| 8.00 | Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts | 1,253.53 | sqm | 750 ₹9,40,147.5 | 300 ₹3,76,059 | 500 ₹6,26,765 | 300 ₹3,76,059 | 200 ₹2,50,706 Lowest | 500 ₹6,26,765 | 900 ₹11,28,177 | 350 ₹4,38,735.5 |
| 9.00 | Carriage of Bajri | 163.59 | Cum | 50 ₹8,179.5 Lowest | 1,170 ₹1,91,400.3 | 500 ₹81,795 | 3,000 ₹4,90,770 | 1,000 ₹1,63,590 | 1,500 ₹2,45,385 | 400 ₹65,436 | 500 ₹81,795 |
| 10.00 | Carriage of Sand | 75.2 | Cum | 50 ₹3,760 Lowest | 1,000 ₹75,200 | 700 ₹52,640 | 3,500 ₹2,63,200 | 1,000 ₹75,200 | 1,000 ₹75,200 | 400 ₹30,080 | 400 ₹30,080 |
Tender Value
₹42.1 L
EMD Value
₹84,000
Closing Date
19 Aug 2025, 4:00 pmClosed
DFO Demarcation Division Bhadarwah
DFO Demarcation Division Bhadarwah
Constt. of 562 BPs in Boungam Janseer Forest of Marwah Forest Division
2025_FD_283292_1
08 of 2025 dated 30-07-2025
Open Tender
Civil Works
Item Rate
115 days
Constt. of 562 BPs in Boungam Janseer Forest of Ma
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
DFO Demarcation Division Bhadarwah
₹84,000
DFO Demarcation Division Bhadarwah
25 Aug 2025
6 Aug 2025
20 Aug 2025
6 Aug 2025
19 Aug 2025
6 Aug 2025
8 Aug 2025
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 20mm nominal size
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended.
Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts
Carriage of Bajri
Carriage of Sand
Carriage of Steel
Carriage of Cement
MUSHTAQ AHMED RATHER (BID ID -2445634)
manzoor ahmed (BID ID -2446061)
nadiya shameem (BID ID -2447412)
SAJID WANI (BID ID -2447100)
M/S M.A CONSTRUCTION (BID ID -2438016)
Mohd Latief Butt (BID ID -2440024)
khan Majid (BID ID -2446899)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .