Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
21 Jul 2025, 3:00 pmClosed
The Block Development Officer, Veppanapalli
The Block Development Officer, Veppanapalli
Krishnagiri District, Veppanapalli Block, MLACDS 2025-2026, Construction of Passanger Shelter at Ramapuram X Road H/o. Kundarapalli. Package No. 2025-2026-VNPI-19
2025_RDTN_583396_1
ROC_NO_2088_2025_R7_07_07_2025
Open Tender
Civil Works
Item Rate
90 days
Veppanapalli
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
The Block Development Office, Veppanapalli
23 Jul 2025
18 Jul 2025
21 Jul 2025
18 Jul 2025
21 Jul 2025
18 Jul 2025
19 Jul 2025
Amount
01. Construction of Passanger Shelter at Ramapuram X Road H/o. Kundarapalli. Estimate Amount: Rs. 12.00 Lakhs.
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 (One cement and three sand ) and Kraft paper laid without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications
Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS. STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.50cm spaced at about 90cm centre to centre and supported by Casuarian props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed.
Centering below Ground Level
Centering for Above Ground Level
Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication.
Plastering with Cement Mortar 1:3 (One Cement and Three Plastering M.Sand) 12mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete.
Supply and fixing of steel door of following size including all cost and conveyance of all materials to site etc., complete.
Provision for Electrical arrangements
Light Point
Fan Point
Tube light
EB Deposit
EB Box
UG Cable
Provision for Grainite Stone Bench Arrangements
Provision for Name Board Charges
Provision for Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sanjay Contractor (BID ID -1407468)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].