Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance R O BAGHJOGI LANKER RAINAWARI SRINAGAR | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹22.3 L
EMD Value
₹44,540
Closing Date
24 Feb 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex. Engineer SNDII SMC Sgr.
Kak Sarai Srinagar
Construction of cement concrete drain including from existing drain upto H/O Mohammad Shafi Ganie in lane No. 03 Salfia Colony Batmaloo Srinagar.
2022_HAUDD_160084_5
14/SNDII of 2021-22
Open Tender
Civil Works
Item Rate
45 days
Batmaloo
Please refer Tender documents.
5 documents required · 5 mandatory
₹950
Yes
Ex. Engineer SNDII SMC Sgr.
₹44,540
Yes
25 Feb 2022
10 Feb 2022
25 Feb 2022
11 Feb 2022
24 Feb 2022
11 Feb 2022
90 days
Amount
Earth work in excavation by Manual means in foundation trenches, drains, pipes and cables (not exceeding 1.5m.in width or 10sqm. on plan) including dressing of sides and ramming of bottoms lift upto 1.5m. including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50 meters. All kinds of soil.
Providing and laying dry stone soling.
Providing & laying in position Cement concrete of specified grade excluding the cost of centering & shuttering All work upto Plinth level in:- 1:5:10 (1cement: 5 coarse sand: 10 graded stone aggregate 40mm nominal size) Crushed
Providing & laying in position cement concrete excluding the cost of centring & shuttering (All work upto plinth level)All work upto Plinth level in cement concrete 1: 3: 6 (1Cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size)
Providing & laying in position cement concrete excluding the cost of centring & shuttering (All work upto plinth level)All work upto Plinth level in cement concrete 1: 2: 4 (1Cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size)
Providing & laying in position Reinforced cement concrete excluding the cost of centring & shuttering (All work upto plinth level)All work upto Plinth level in cement concrete 1: 2: 4 (1Cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size)
12 mm cement plaster in 1 : 4 Mix (1 Cement : 4 Fine Sand).
Centring& shuttering including strutting propping etc. & removal of form work for :-Walls (any thickness) incld. Attached pilasters buttresses plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access plat form.
Edges of slabs below 20 cm wide.
Edges of slabs above 20 cm wide.
Reinforcement for R.C.C. work including straightening cutting bending ,placing in position and binding all complete -Thermo mechanically treated Bars.
Flling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Clearance of open, covered drain/ sewer manholes, silt Chamber , sump wells etc. by way of removal of silt ,garbage , sewage, mud, slush, organic / inorganic matters and other solids, cleaning of sewer pipes by rodding or by any means from manholes and well flushing after cleaning including all leads lifts and its disposal upto final dumping site as directed by Engineer Incharge at site by Mechanical transport including construction of Ring bund dewatering by deploying dewatering pumps (complete job). Shrinkage will be deducted @25%as water content
Providing, laying and fitting of polycrete manhole covers including all safe carriages from Divisional Store upto site of work (Complete Job) (Manhole covers shall be supplied Departmentally).
Carriage of materials by mechanical transport including loading, unloading & stacking from approved source to site of work :-Stone soling for 15 Kms.
40mm N.S. stone agg. For 15 Kms
20mm N.S. stone agg. –do-
Sand for 29 Kms.
Cement/ Steel for an average lead of 03 Kms
High-definition geo-tagged Photographs of work to be taken before, during and after execution of work.
IMRAN AMIN MIR
M/S LOGITECH GROUP
BILAL AHMAD BHAT
stage.html
html • 0.02 MB
finance_364430.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .