| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹10.1 L+₹30,150 (3.09%)Rejected-AOC FLAT NO 101 UGF FRONT LHS RZ B 49A KAILASHPURI PALAM COLONY NEW DELHI 110045 | SOUTH WEST | DELHI | 110045 | L2 | Rejected-AOC Other than lowest Bidder | |
| 3 | L3₹10.9 L+₹1.2 L (11.9%)Rejected-AOC MEGHA SADAN GAGANNAGAR CURTI PONDA GOA 403401 | PONDA | SOUTH GOA | GOA | 403401 | L3 | Rejected-AOC Other than lowest Bidder |
Tender Value
₹18.4 L
EMD Value
₹36,700
Closing Date
27 Feb 2021, 6:00 pmClosed
GE(S) Jaipur
GE(S) Jaipur, Kalyan Marg, bani Park, Jaipur-302006
Manning and operations of water supply installation at Gothic line and Ajay Meru under AGE E/M II under GE(S) Jaipur
2020_MES_405839_1
GE (S)J-56P/2020-21 8618/ /E8
Open Tender
Civil Works
Item Rate
335 days
Jaipur
Class E category d(v)
9 documents required · 9 mandatory
₹500
Yes
GE (S) Jaipur
₹36,700
Yes
5 Mar 2021
22 Dec 2020
1 Mar 2021
22 Dec 2020
27 Feb 2021
15 Feb 2021
22 Dec 2020 - 25 Dec 2020
Amount
Manning and operation of water supply installations at Old Gothic line MAP Qtr pump house under AGE E/M II (South) jaipur with (pump attendant /Operator consists of three shift in a day as detailed below (each shift is having 8 hours of duration) on all working days including Sundays and holidays. S.no. No.of shift FGM per shift (Skilled) Total (0600 Hrs to 1400 Hrs) (i). 3 1 3 Nos (1400 hrs to 2200 Hrs) ( 2200 hrs to 0600 Hrs) (335x3 = 1005 Shifts)
Manning and operation of water supply installations atAjay meru Map Qtr pump house under AGE E/M II(South) Jaipur with (Pump attendant/Operator) consists of three shift in a day as detailed below (each shift is having 8 hours of duration) on all working days including Sundays and holidays. S.no. No.of shift FGM per shift (Skilled) Total (0600 Hrs to 1400 Hrs) (i). 3 1 3 Nos (1400 hrs to 2200 Hrs) ( 2200 hrs to 0600 Hrs) (335x3 = 1005 Shifts)
Note - For Item No. 1 to 2 (a) Quoted rates shall be deemed to include cost of consumables materials, stationary (for log sheets, complaint attendance register, records etc.), first Aid box, cost of lubricant etc. (b) Log sheet for pumping sets, for daily running records in booklet for a calender month arranged by the contractor complet all as directed by Engr in charge. (c) Following safety equipment and tools in addition to that prescribed by the manufacturer of the plant shall be provided at each installation-First Aid Box-01 No,Safety Helmets- 2 Nos, Hand gloves- 2 pairs, Gumboots- 2 pairs, Gas masks suitability for chlorine and other foul gases- 02 Nos, Set of spanners- 01 No. also provides T&P to carry out the maintenance work in machinary / equipment. First aid box consisting of all reqd medicine as per norms to be provided by the contractor within the overall cost quoted against the item. A penalty of Rs.300/- per day will be deducted per installations if the requirement is not adhered to. (d) Replacement of gland required for pump & valve etc shall be provided by contractor without any cost. (e) In case the defects are not rectified with in time decided by the Engr-in-charge and plant remained inoperative for more than 02 days during the contract period financial panelties shall be recovered at Rs 5000 per day.
(f) Installation will be handed over in operation state at the time of commencement of the contract with an inventory of various items equipments and electrcal fittings will be handed over for proper accounting and up keep. The taking over on expiry of contract shall be all as per inventory and any damage loss shall be made good by contractor before payment of final bill. GE decision will be final and binding. (g) The work shall be carried out in three shifts of 08 hours as per description of Sch.A.Contractor shall employ the man power in such a way that each worker shall get weekly off as per prevailing Labour Act / Law. The cost of additional worker (Reliever) required to adhere above said provision shall be deemed to be included in the quoted rates. (h) Qualification of operator shall be minimum 02 years experience in operation and maintenance of STP including criteria as given in specifications. (j) Operator shall always be present in proper uniform of approved colour. If operator found without uniform the panelty @ 100/- per shift shall be impossed on the contrator. (k) Normally maintenance will be carried out in day time but in case of emergency/ breakdown it must be attended at odd hours/night hours without any extra cost and the rate quoted above shall be deemed to be included.
(m) A penalty of Rs.1000/- per shift will be deducted in the case of absence by any operator (FGM) in any shift fromany of the installation. (n) The minimum wages as published by Govt of India and State authorities shall be applicable for payment to the operators. The higest rate shall be paid to the operators from the Minimum Fair Wages Order as circulated by Central and State Govt. in the respective category of labour and revised rates shall be paid to the operator as and when the rates are revised by the concerned authorities. Necessay proof of payment shall be made available to the Engr-in-Charge as and when demanded. In case any complaint is received from the operator regarding delay or non-payment of minimum wages by the contractor, the GE being principal emploer shall directly pay to the operator for the work done by him in the given month on account of contractors default and the same shall be deducted from contractors payment.
HIND CONSTRUCTIONS
M/S HARI CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .