Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | L1 | Accepted-AOC Agreement Completed | |
| 2 | L2₹7.0 LSame as L1Rejected-Finance | L2 | Rejected-Finance Lottery Not Allot | |
| 3 | L2₹7.0 LSame as L1Rejected-Finance F 16 GANESH SHANKAR VIDYARTHI NAGAR PANKI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | L2 | Rejected-Finance Lottery Not Allot | |
| 4 | L2₹7.0 LSame as L1Rejected-Finance | L2 | Rejected-Finance Lottery Not Allot | |
| 5 | L3₹8.1 L+₹1.1 L (15.3%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹8.3 L
EMD Value
₹82,579
Closing Date
6 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER, KMC
OFFICE OF THE CHIEF ENGINEER , KMC
Construction of boundary wall for green belt outside radhika upwan.
2026_NNKAN_1112111_1
73 CVO
Open Tender
Civil Works
Percentage
45 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹82,579
9 Oct 2026
4 Feb 2026
6 Feb 2026
4 Feb 2026
6 Feb 2026
4 Feb 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in trenches for foundation pipes cables etc in ordinary soil (loam clay sand incl.etc all comp. | 11.61 | cum | 174 | ₹2,020.14 |
| 2 | Disposal of surplus earth/malwa upto 5.00 km distance including loading/unloading of material with all charge complete. | 11.61 | cum | 146.2 | ₹1,697.38 |
| 3 | Prov & laying in position cement concrete 1:4:8 excluding the cost of centering and shuttering All work up to plinth level:1:4:8 (1 Cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) | - | cum | 5,740 | - |
| 4 | 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.89 | cum | 6,750 | ₹46,507.5 |
| 5 | 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.83 | cum | 7,160 | ₹70,382.8 |
| 6 | 12mm thick cement plaster in 1:4 cement, fine sand etc all complete.cement: mortar 1:4 | 148.3 | sqm | 182 | ₹26,990.6 |
| 7 | Finishing wall with putty brand of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 148.3 | sqm | 135 | ₹20,020.5 |
| 8 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture etc. | 148.3 | sqm | 135 | ₹20,020.5 |
| 9 | roviding and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer ms tube | 4,210 | kg | 119 | ₹5,00,990 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 123.93 | sqm | 212 | ₹26,273.16 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
BOQ_2056687.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .