Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹98.9 LAdmitted-Finance H NO 130 ANAND NAGAR A TRIPURI TOWN PATIALA | PATIALA | PATIALA | PUNJAB | -0.25% | ₹98.9 L | L1 | Admitted-Finance |
Tender Value
₹99.2 L
EMD Value
₹2.0 L
Closing Date
3 Aug 2026, 5:00 pmClosed
Superintending Engineer
Municipal Corporation Patiala
Construction of Zones office near Govt. press office near Sirhind Road, MC Patiala Est Cost Rs. 99.19 lacs dt 29/30.07.2026
2026_DLG_172383_1
MCP/2026/178-180/02
Open Tender
Civil Works
Percentage
180 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹2.0 L
Yes
14 Aug 2026
22 Jul 2026
4 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations, trenches, etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and disposal of all surplus soil within a lead of one chain as directed. | 264.7 | cum | 191.74 | ₹50,752.78 |
| 2 | CC 1:5:10 | 66.8 | cum | 3,604.02 | ₹2,40,748.77 |
| 3 | First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth | 21.66 | cum | 5,281.2 | ₹1,14,390.69 |
| 4 | Damp proof course 4cm thick of cement concrete 1:2:4 with water proofing compound
as per manufactures guidelines. | 19.5 | sqm | 235.98 | ₹4,601.69 |
| 5 | First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres above
plinth level. | 334.5 | cum | 5,426.58 | ₹18,15,190.51 |
| 6 | Reinforced cement concrete M-30 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 378.7 | cum | 5,886.96 | ₹22,29,390.99 |
| 7 | Extra for pumping charges of Batch Mix Concrete / Ready mix conrete work (RMC) | 204.4 | cum | 92.71 | ₹18,949.52 |
| 8 | Extra for R.C.C/PCC. work done in each subsequentstoreyabovethefirststoreyupto height of 4metresor part thereof up to the roof top level of that storey. | 204.4 | cum | 190.68 | ₹38,975.71 |
| 9 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C
works, where not including in the complete rate of RCC including bending and binding placing in
position complete | 443.65 | kg | 7,827 | ₹34,72,448.55 |
| 10 | Add 7% for final designs | 31 | kg | 7,827 | ₹2,42,637 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_350522.xls
BOQ • 0.34 MB
COPYSOPnotification.pdf
Tender Documents • 0.21 MB
etenderlist.pdf
Tender Documents • 0.39 MB
Generaltenderconditions.pdf
Tender Documents • 4.57 MB
Patiala 2 MC Office-GF Layout Plan.pdf
Tender Documents • 0.17 MB
Patiala 2 MC Office-SF Layout Plan.pdf
Tender Documents • 0.17 MB
Patiala 2 MC Office-FF Layout Plan.pdf
Tender Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .