Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹572.4 Cr
EMD Value
₹8.5 Cr
Closing Date
30 Oct 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Senior Manager Engineering Electrical
Air India Building First Floor
DSITC of BHS at Varanasi Airport
2025_AAI_245611_1
AAI_CHQ_BHS_VNS
Open Tender
Electrical Works
EPC Contract
456 days
Varanasi Airport
As per NIT
5 documents required · 5 mandatory
₹11,800
₹8.5 Cr
New Delhi
30 Oct 2025
21 Aug 2025
6 Nov 2025
21 Aug 2025
30 Oct 2025
21 Aug 2025
21 Aug 2025 - 15 Oct 2025
8 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Design, Supply, Installation, Testing and Commissioning (DSITC) of a complete, fully integrated and intelligent In-Line Baggage Handling System (BHS) including associated SCADA, Monitoring, Control System, necessary sensors, cabling, networking, integration with Airport Systems, and related civil/mechanical/electrical works at Varanasi Airport with a peak hour passenger capacity (PHP) of 5000 passengers.
The system shall be designed in accordance with latest ICAO/BCAS norms, IATA Resolution 753, ECAC Standard 3 for Explosive Detection, DBR, Technical Specifications and shall consist of, but not limited to the following key components:
Check-in & Induction:
i. 3 Nos. Check-in Islands comprises with 24 Nos. Check-in Counters per island (Total: 72 counters), including 8 Self Bag Drop (SBD) in each Island .
ii. Integrated with automated conveyor feed and Bag Tag Reader (BTR)
iii. 10 Nos. Maintenance-Free S-Lifts for vertical transfer of bags between levels
iv. 4 Nos. CT-EDS machines conforming to ECAC Standard 3 for Level 1 and Level 2 automatic baggage screening. Complete Level 1 & 2 screening system with auto-divert and reject capability. Integration with BHS PLC/SCADA for real-time threat management
v. Level 3 Screening: 2 Nos. Dual-view X-Ray BIS Machines with provision for remote operator workstations
vi. Manual Encode Stations with Workstations
vii. Sorter & Distribution: 1 No. High-Speed Tilt Tray Sorter (capacity not less than 5,400 BPH) with SCADA integration. Associated conveyor network with diverters, merges, and accumulation conveyors
viii. Control & Monitoring System: Central SCADA-based control system with redundancy,PLC Panels with IP-rated enclosures, Alarm & Fault Monitoring System, Interfaces with FIDS, AODB, BMS and BRS (Barcode and RFID)
ix. Energy Efficiency: Energy-efficient motors, VFDs, photo sensors,Low-friction and low-noise rollers and belts
Automatic stand-by mode for idle sections.
x. O&M and AICMC Provisions: 15 Years Operation & 13-year Comprehensive Maintenance Contract (AICMC) post completion after DLP.
xi. Training to AAI O&M staff
xii. Provision of spares and consumables as per OEM standards
xiii. All associated structural supports, foundation, cable trays, ducts, earthing, power distribution, lighting for maintenance areas, communication, and data cabling
xiv. Integration with fire alarm/suppression system in coordination with the Airport fire detection system
xv. Safety systems including Emergency Stop Buttons, Overload Protection, and Safe Access Platforms etc as req. | 1 | Nos | - | - | - |
| 1.1 | Annual Operation & Routine Maintenance Contract | - | - | - | - | - |
| 2Annual Operation and routine maintenance of complete Departure and Arrival Conveyor systems as mentioned under item no.1.0 by providing requisite man-power, tools, consumables and technical support etc. during operations as specified in SCC, Technical Specification and particular specifications of operation & AICMC with complete in all respect. | ||||||
| 2.01 | 1st Year (During DLP) | 1 | Nos | - | - | 0.09% |
| 2.02 | 2nd Year (During DLP) | 1 | Nos | - | - | - |
| 2.03 | Year 3 | 1 | mm | - | - | - |
| 2.04 | Year 4 | 1 | km | - | - | - |
| 2.05 | Year 5 | 1 | KK | - | - | - |
| 2.06 | Year 6 | 1 | Nos | - | - | - |
| 2.07 | Year 7 | 1 | Nos | - | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
TenderDocument.pdf
Tender Documents • 37.75 MB
BOQ_281246.xls
BOQ • 0.43 MB
Corri3.pdf
PDF • 14.64 MB
Corrigendum2.pdf
PDF • 0.41 MB
Corrigendum-I.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .