Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance LONAND TALUKA KHANDALA DISTRICT SATARA | LONAND | SATARA | MAHARASHTRA | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical DOCUMENTS NOT FOUND AS PER B1FORM |
| 5 | Rejected-Technical | Rejected-Technical DOCUMENTS NOT FOUND AS PER B1FORM |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
11 Jun 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF OFFICER LONAND
NAGARPANCHAYAT LONAND
Reparing of Roads (Patch Works) and Alied works of Lonand Nagarpanchayat Roads at Lonand
2022_DMA_796783_2
NPL/02/2022-23
Open Tender
Civil Works
Item Rate
365 days
LONAND
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹20,000
17 Jun 2022
4 Jun 2022
13 Jun 2022
4 Jun 2022
11 Jun 2022
4 Jun 2022
Amount
Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method filled with 75 mm B.M, applying bitumen tack coat at the bottom and vertical sides as per as per MORTH specification clause 3004.1 and 3004.2
Providing 50 mm thick semi grout bituminous treatment including supplying all materials, prepairing the exisisting road surface, applying tack coat @ 0.735 kg/sqm and laying the required thickness of metallayer, heating and spraying bitumen of specified Grade at the rate of 2.75 kg/sqm, spreading chips and laying seal coat of specified Grade of bitumen of 1.25 Kg/sqm and compacting, making the surface good etc. complete (For only Patch Repair works / For Road work ) (VG-30 bulk bitumen rates are considered to arrive at rates)
Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting), heating and spraying the bitumen of VG-30 grade @ 2 kg/sqm, spreading 12 mm. size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desire ddegree of compaction as per Technical Specification Clause 506 etc. complete, including applying tack coat of VG 10 grade bitumen at the rate of 0.30 Kg Sqm. one xistingbitumen surface. ( For Repair works only)
Providing and constructing 50 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting), heating and spraying the bitumen of VG-30 grade @ 1.75 kg/sqm, spreading 12 mm. size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desire ddegree of compaction as per Technical Specification Clause 506 etc. complete, including applying tack coat of at the rate of 0.30 Kg Sqm. ( For Repair works only)
Patch repair on already filled pot holes with 20 mm premix carpet and seal coat as per MORTH specification clause 3004.1 and 3004.2
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat as per MORTH specification clause 3004.1 and 3004.2
Providing pick and roll surface by picking the old WBM surface to there quired standard, adding 30% of 40 mm size metal and required quantity of murum including laying sectioning, watering, compacting with static roller with thin layer of murum blindage on carrageway, watering and compacting by staticroller, including cost of all materials, loading, unloading, stacking and labour etc. complete.Spec.No.:As directed by Engineer- in-charge.
Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling etc. complete
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains etc. complete
Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location etc. complete
Repair of steel railing to bring it to original shape cleaning and repainting as per drawing etc. complete
Dressing of side shoulder/ Scrapping the road side shoulder by Mechanical means (By JCB/ DOUZER) including excavation of raised side shoulders upto 15 cm depth including remooving/ cutting bushes, grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge
Supplying trap/granite/quartzite/gneiss stone metal of required sizeby bringing the boulders / Rubble at the road side breaking them to by bringing the boulders / Rubble at the road side breaking them torequired gradation including conveying the boulders /Rubble andstacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date ofapproval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken).
Supplying trap/granite/quartzite/gneiss stone metal of required sizeby bringing the boulders / Rubble at the road side breaking them to by bringing the boulders / Rubble at the road side breaking them torequired gradation including conveying the boulders /Rubble andstacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date ofapproval will form part of the measurements) a)40 mm Metal, By breaking Boulders
Supplying hard murum/ kankar at the road site,including conveying and stacking
Supplying soft murum at the road site, including conveying and stacking complete.
Spreading 80/40 mm metal for road work complete as directed by Engineer in charge .including sectionong etc
Spreading hard murum/ soft murrum/gravel or kankar for side width complete
Compacting the sub grade/gravel/oversize layers for all width with Power roller having weight 8 to 10 MT.metal (200 mm loose)including necessary, labour, materials and artificial watering complete.including necessary, labour, materials and artificial watering complete.
Compacting the sub grade/gravel/oversize layers for all width with Power roller having weight 8 to 10 MT.metal (100 mm loose)including necessary, labour, materials and artificial watering complete.including necessary, labour, materials and artificial watering complete.
Compacting the hard murum side widhs including laying in layers on each side
Picking the road surface including sectioning the etc. complete (WBM surface)
Picking the road surface including sectioning etc. complete (BT surface.)
Providing bituminous Type A liquid seal coat on bituminous surface including supplying all material sand bitumen of specified grade preparing existng road surface, heating and applying bitumen @0.98Kilogram Square Metre. by mechanical means, spreading chip sand rolling, by static roller having weight 8 to10 MT.etc.complete.(VG-30bulk bitumen rate sare considered to arrive at rates)
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area .
Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed.By Manual Means. (with prior permission of S.E.)
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing ofunsuitable or excess stuff as directed all sorts of soils.
Transport to excavated upto a lead of 2.0 km including loading, unloading etc.complete.
Extra Royalty Charges As per Statement attached separatly a) for Sand
Extra Royalty Charges As per Statement attached separatly b)for Other Minerals
Providing and applying two coats of High Albedo paint having minimum Solar Reflective Index (SRI) 108 (with solar reflectance & thermal emittance tested as per ASTM) C1549 and ASTMC1371 respectively, VOC less than 10cc/gm. The coating thickness and the methodology of application shall strctlyas permanufacturer's specifitions and as approved by engineer incharge.Surface preparation includes cleaning with metal wire brush to remove all dust, fungus etc,washing with water all complete.The contractor shall give guarantee for the performance of SRI and also the durabitity of coating, all complete as per direction of Engineer - in- incharge.
Supervisor
Hanmant Dinkar Ghorpade
Abrar S Mujawar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .