| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.6 L+₹73,043 (25.2%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder |
Tender Value
₹3.4 L
EMD Value
₹3,500
Closing Date
7 Jun 2023, 6:00 pmClosed
SE,O and MC-II,3x200MW,BTPS,Obra
SE,O and MC-II,3x200MW,BTPS,Obra
Spray painting/ painting of turbine, condenser, heat exchanger pipeline, pumps and etc. During overhauling of unit no.09, 3x200mw, BTPS, Obra
2023_RVUNL_790161_1
N-OBR////6000001182_00
Open Tender
Miscellaneous Works
Fixed-rate
35 days
Unit no.-9, 3x200 MW, BTPS, Obra
As per PQC
3 documents required · 3 mandatory
₹296
Dy. Chief Account Officer,CFA and BO, BTPS,Obra
₹3,500
8 Aug 2023
27 Mar 2023
9 Jun 2023
27 Mar 2023
7 Jun 2023
27 Mar 2023
27 Mar 2023 - 7 Jun 2023
Amount
Double coat painting with synthetic enamel paint along with one coat primer of red oxide of I.S.I. specification of various pumps, hydraulic coupling, heat exchanger, lube oil cooler, working oil cooler, pipeline valve of turbine side of unit no. – 09, 3X200MW, BTPS, Obra.
BCW pipe lines, working oil coolers, lube oil cooler line of BFP system, seal water cooling line and other associated pipe line of condensate pup/ BPF drip pump etc., BCW direct line, hot well make up pumps line, CW Booster line and site various valve, stator water pumps, cooling pumps & its lines valve, CST make up line vale, overhead BCW line valve , cooling tower pipeline and CW pipe line etc. BFP cooling line, main header of CLCT, CW inlet and outlet pipe of condenser and their valve.
Condensate storage tank, BCW tank stator water cooling tank, condensate recovery tank, BCW overhead tank and associated pipe and their valve.
Hydraulic coupling of BFP, stator water heat exchanger, CW Heat exchanger, BCW heat exchanger, BCW heat exchanger and oil cooler of turbine side including hot well make up pump seal coolers lubs oil coolers of BFP and its associated pipe lines and valves.
Air washer fans pumps, pipelines connecting valves, plate forms railing of condensate pumps and its pedestal railing plat forms of phosphate and hydrazine pumps and other miscellaneous structures of turbine side.
Double coat synthetic super enamel anticorrosion paint of different color by spray machine in accordance with specified color after single red oxide.
Spray painting of L.P. Cylinder
Spray painting of front pedestal & bearing gear housing of turbine
All bearing & barring gear housing of turbine
Control valve casing camshaft
Condenser (including inlet & outlet pipe line)
Main oil tank
Main ejector
Lube oil cooler (05 Nos.)
Centrifuging machine
Letter writing 2” size dia letter in turbine side equipment name of 3X200MW.
M/S S K DEY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .