Loading…
Loading…
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
13 Jul 2026, 4:00 pm4d left
XEN REW Kathua
XEN REW Kathua
Constt. of water tank at shamshanghat wno 5 serimoni
2026_RDPR_314692_24
e-NIT No.80/REW/K of 2026-27 Dated 24/06/2026
Open Tender
Civil Works
90 days
Billawar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹7,840
6 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 20.42 | cum | 479.3 | ₹9,787.31 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.35 | cum | 4,826.5 | ₹16,168.78 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20.4 | cum | 4,774.46 | ₹97,398.98 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 5.81 | cum | 7,571.55 | ₹43,990.71 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 5.81 | cum | 1,455.65 | ₹8,457.33 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.85 | cum | 9,821.85 | ₹27,992.27 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level , Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2.5 | qtl | 12,320 | ₹30,800 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: | 29.42 | sqm | 286.35 | ₹8,424.42 |
| 9 | Suspended floors, roofs, landings, balconies and access platforms. | 7.7 | sqm | 718.2 | ₹5,530.14 |
| 10 | Edges of slabs and breaks in floors and walls under 20 cm wide | 22.34 | rmt | 262.2 | ₹5,857.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.54 MB
BOQ_1019125.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid