Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.2 LAdmitted-Finance | -23.69% | ₹9.2 L | L1 | Admitted-Finance |
| 2 | L2₹10.2 LAdmitted-Finance | -15.00% | ₹10.2 L | L2 | Admitted-Finance |
| 3 | L3₹11.0 LAdmitted-Finance | -8.29% | ₹11.0 L | L3 | Admitted-Finance |
Updated dates
Tender Value
₹12 L
EMD Value
₹36,000
Closing Date
21 Apr 2026, 4:00 pmClosed
EXECUTIVE ENGINEER PMGSY DIVISION KATHUA
pmgsy division kathua
Permanent Restoration L075 t01 km12th to sowla
2026_JKRRD_147248_2
EE/PMGSY/KUA03of2026-27 DATED10.04.2026
Open Tender
CIVIL
60 days
Permanent Restoration L075 t01 km12th to sowla
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PMGSY DIVBISION KATHUA
₹36,000
6 May 2026
11 Apr 2026
22 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres Ordinary soil 80%, Ordinary rock 20% | 181.5 | cum | 304.18 | ₹55,208.67 | BI01010001010000000000000515BI0100001119 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.3 | cum | 4,826.5 | ₹15,927.45 | BI01010001010000000000000515BI0100001120 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) incl. all leads, lifts & carriage of material by MT/ H.L. | 40.5 | cum | 5,733.6 | ₹2,32,210.8 | BI01010001010000000000000515BI0100001121 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 0.56 | sqm | 7,788.4 | ₹4,380.97 | BI01010001010000000000000515BI0100001122 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level thermomechanically treated bars of Fe500D or more. | 67.5 | sqm | 123.2 | ₹8,316 | BI01010001010000000000000515BI0100001123 |
| 6 | Centring and shuttering including strutting propping etc and removal of form work Foundations, footings, bases of columns etc. for mass concrete. | 54 | cum | 286.35 | ₹15,462.9 | BI01010001010000000000000515BI0100001124 |
| 7 | Suspended floor, roofs, landings, balconies, platform etc.(100MMX100MM MESH) | 2.25 | cum | 718.2 | ₹1,615.95 | BI01010001010000000000000515BI0100001125 |
| 8 | Supplying and packing of stone boulder in 4mm dia (100mm x100m mesh) GI wire crates apron complete as per technical specifications and directions of engineer in charge including cost of wire crates | 328.32 | cum | 1,765.59 | ₹5,79,678.51 | BI01010001010000000000000515BI0100001126 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate (size
range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification
including premixing the material with water at OMC in mechanical mix
plant, carriage of mixed material by tipper to site, for all leads & lifts,
laying in uniform layers with mechanical paver finisher in sub- base / base
course on well prepared surface and compacting with vibratory roller of 8
to 10 tonne capacity to achieve the desired density, complete as per
specifications and directions of Engineer-in-Charge. | 13.5 | sqm | 1,885.95 | ₹25,460.33 | BI01010001010000000000000515BI0100001127 |
| 10 | Tack Coat Providing and applying tack coat using hot straight run bitumen of
grade – VG-30, including heating the bitumen, spraying the bitumen
with mechanically operated spray unit fitted on bitumen boiler,
cleaning and preparing the existing road surface as per specifications.On bitumen surface @ 0.50 Kg/sqm | 300 | sqm | 56.1 | ₹16,830 | BI01010001010000000000000515BI0100001128 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_229381.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid