Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Technical | L1 | Admitted-Technical Tender found in order | |
| 2 | L2₹3.4 Cr+₹18.6 L (5.76%)Admitted-Technical | L2 | Admitted-Technical Tender found in order | |
| 3 | L3₹3.4 Cr+₹20.6 L (6.38%)Admitted-Technical | L3 | Admitted-Technical Tender found in order | |
| 4 | L4₹3.5 Cr+₹26.9 L (8.32%)Admitted-Technical 23 B KILPAUK HALLS ROAD CHENNAI TAMIL NADU 600010 | CHENNAI | TAMIL NADU | 600010 | L4 | Admitted-Technical Tender found in order | |
| 5 | L6₹3.5 Cr+₹27.3 L (8.46%)Admitted-Technical | L6 | Admitted-Technical Tender found in order |
| Sl No | Description | Qty | Unit | D D INFRA L2 | ARUNRAJ L3 | Sri Vigneshwaraa Homes L8 | Wings Brand Activations (I) Pvt Ltd L4 | M/S. ATS INFRA L7 | S.CHANDRASEKAR L1 | DR Constructions L5 | GAJENDRAN L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling Clearing away and carefully stacking materials useful for re-use for any thickness of Brick work with lime mortor etc. | 282 | m3 | 184 ₹51,888 | 194 ₹54,708 | 300 ₹84,600 | 207 ₹58,374 | 210 ₹59,220 | 60 ₹16,920 Lowest | 500 ₹1,41,000 | 193 ₹54,426 |
| 2.00 | Dismantling Clearing away and carefully stacking materials useful for re-use for any thickness of RCC roof etc. | 59 | m3 | 3,448 ₹2,03,432 | 3,635 ₹2,14,465 | 550 ₹32,450 Lowest | 3,600 ₹2,12,400 | 3,919 ₹2,31,221 | 2,000 ₹1,18,000 | 1,000 ₹59,000 | 3,591 ₹2,11,869 |
| 3.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 1,980 | m3 | 274 ₹5,42,520 | 289 ₹5,72,220 | 240 ₹4,75,200 | 293.25 ₹5,80,635 | 312 ₹6,17,760 | 150 ₹2,97,000 Lowest | 350 ₹6,93,000 | 285 ₹5,64,300 |
| 4.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 288 | m3 | 2,138 ₹6,15,744 | 2,254 ₹6,49,152 | 2,000 ₹5,76,000 | 2,300 ₹6,62,400 | 2,430 ₹6,99,840 | 2,200 ₹6,33,600 | 1,500 ₹4,32,000 Lowest | 2,227 ₹6,41,376 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 155 | m3 | 1,677 ₹2,59,935 | 1,767 ₹2,73,885 | 2,100 ₹3,25,500 | 2,012.5 ₹3,11,937.5 | 1,906 ₹2,95,430 | 1,400 ₹2,17,000 | 1,200 ₹1,86,000 Lowest | 1,747 ₹2,70,785 |
| 6.00 | Supplying and filling in foundation, basement, etc with Stone Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 345 | m3 | 410 ₹1,41,450 Lowest | 433 ₹1,49,385 | 1,600 ₹5,52,000 | 471.5 ₹1,62,667.5 | 467 ₹1,61,115 | 1,000 ₹3,45,000 | 1,500 ₹5,17,500 | 430 ₹1,48,350 |
| 7.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 160 | m3 | 117 ₹18,720 | 124 ₹19,840 | 50 ₹8,000 | 138 ₹22,080 | 134 ₹21,440 | 40 ₹6,400 Lowest | 800 ₹1,28,000 | 121 ₹19,360 |
| 8.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 142 | m3 | 4,413 ₹6,26,646 | 4,652 ₹6,60,584 | 5,050 ₹7,17,100 | 4,300 ₹6,10,600 | 5,015 ₹7,12,130 | 4,500 ₹6,39,000 | 2,500 ₹3,55,000 Lowest | 4,595 ₹6,52,490 |
| 9.00 | Providing Pre construction Anti termite treatment for the building including all chemicals as per standard specifications. Labour charges for preparing the areas for treatment spraying chemicals and other incidential charges etc., complete. The rate shall be inclusive of giving anti-termite treatment to the building for the following four stages including breaking the termite mounds making holes with crow bars at an intervel of 12"to a depth of 8" in the periphery of building and pouring chemicals etc., complete as per ISI 6313-1981 and. The antitermite chemicals used should have 0.5% concentration with 3L solution for the entire operation etc. as directed by the Engineer incharge and including cost of chemicals labour transportion etc., | 600 | m2 | 107 ₹64,200 | 113 ₹67,800 | 75 ₹45,000 Lowest | 200 ₹1,20,000 | 122 ₹73,200 | 120 ₹72,000 | 300 ₹1,80,000 | 112 ₹67,200 |
| 10.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 558 | m2 | 531 ₹2,96,298 Lowest | 560 ₹3,12,480 | 750 ₹4,18,500 | 710 ₹3,96,180 | 604 ₹3,37,032 | 550 ₹3,06,900 | 550 ₹3,06,900 | 553 ₹3,08,574 |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
24 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Superintending Engineer, PWD.,
The Superintending Engineer, PWD., Buildings (C and M) Circle-1, Chepauk, Chennai-5
Construction of Additional Building in Government Hospital at Ponneri in Thiruvallur District
2026_PWD_721942_1
PWD/BCMC1/16-2/2026-27
Open Tender
Civil Works
Lump-sum
270 days
Government Hospital at Ponneri in Thiruvallur Dist
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹2.4 L
24 Nov 2026
6 Nov 2026
24 Nov 2026
6 Nov 2026
24 Nov 2026
6 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Clearing away and carefully stacking materials useful for re-use for any thickness of Brick work with lime mortor etc. | 282 | m3 | - | - |
| 2 | Dismantling Clearing away and carefully stacking materials useful for re-use for any thickness of RCC roof etc. | 59 | m3 | - | - |
| 3 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 1,980 | m3 | - | - |
| 4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 288 | m3 | - | - |
| 5 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 155 | m3 | - | - |
| 6 | Supplying and filling in foundation, basement, etc with Stone Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 345 | m3 | - | - |
| 7 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 160 | m3 | - | - |
| 8 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 142 | m3 | - | - |
| 9 | Providing Pre construction Anti termite treatment for the building including all chemicals as per standard specifications. Labour charges for preparing the areas for treatment spraying chemicals and other incidential charges etc., complete. The rate shall be inclusive of giving anti-termite treatment to the building for the following four stages including breaking the termite mounds making holes with crow bars at an intervel of 12"to a depth of 8" in the periphery of building and pouring chemicals etc., complete as per ISI 6313-1981 and. The antitermite chemicals used should have 0.5% concentration with 3L solution for the entire operation etc. as directed by the Engineer incharge and including cost of chemicals labour transportion etc., | 600 | m2 | - | - |
| 10 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 558 | m2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
finance_867630.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
Additonalbuildingponnerischcondtion.pdf
Tender Documents • 1.40 MB
BOQ_867630.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .