| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 CrAccepted-AOC 142 | ₹42.0 Cr | L1 | Accepted-AOC LOWEST RATE BIDDER |
| 2 | L2₹43.5 CrRejected-Finance | ₹43.5 Cr | L2 | Rejected-Finance HIGH RATE BIDDER |
Tender Value
₹42 Cr
EMD Value
₹84 L
Closing Date
4 Mar 2020, 3:00 pmClosed
SE NINTH CIRCLE I.W. BAHRAICH
O/O SE NINTH CIRCLE I.W. BAHRAICH
Remaining leftover works of Rapti Main Canal from Km. 23.000 to Km. 35.000 as existing on 04-02-2020 in above mentioned reach mainly including leftover works of drainage syphon at Km. 23.950 and Km. 30.750 in District-Shrawasti. (U.P.)
2020_UPIDC_436814_2
10/SE/NAVAM/2019-20
Open Tender
Civil Works
90 days
BHINGA SHRAWASTI
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
EE SNK 4
₹84 L
19 May 2020
28 Feb 2020
4 Mar 2020
28 Feb 2020
4 Mar 2020
28 Feb 2020
Amount
E/w in digging foundation in all type of soil including all lead, lift, back filling and disposal of surplus earth for proper completion of work.
Laying Plain cement concrete M15 A40 (1:2:4) in foundation on with 20 to 40 mm. size crushed kabrai stone ballast & Hamirpur coarse sand and having F.M. not less than 2.0. including all taxes, material, labour, T&P etc.
Laying R.C.C. 1:1.5:3 using 4.75 mm. to 20 mm. size (M20 A20) crushed kabrai stone grite with Hamirpur coarse sand and having F.M. not less than 2.0. including all taxes, material, labour, T&P etc.
Laying R.C.C. 1:1:2 (M25 A20) in super structure of bridges using 4.75 mm. to 20 mm. size crushed kabrai stone grite with Hamirpur coarse sand and having F.M. not less than 2.0. including all taxes, material, labour, T&P etc. except steel with mechanical compaction required for proper completion of work.
Supply and laying graded filter including all taxes, cost of all material, labour and T & P etc. required for proper completion of work. (i) Coarse Sand
(ii) Pea Greavel
(iii) 20 to 40mm natural single
Centering and shuttering for C.C. work including all taxes cost of all material, labour, T&P etc.
Cutting, bending, binding & placing of steel reinforcement in proper position including cost of all taxes, binding wire, steel, labour, T&P etc. required for proper completion work.
S/f 20 mm. thick joint filler board in construction joint including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Dewatering with cost of power, Pol machines, pump. Well point system and operator etc. with assembling and deassembling of machine etc. required for proper completion of work.
Providing & laying LDPE over filter including all taxes, cost of all material, labour and T & P etc. required for proper completion of work.
Laying porus concrete in porus window in 1:0:4 with cement and 20 to 40mm. Size Krushed kabrai stone ballast including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Dry sand filling below foundation including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Providing & fixing P.V.C. water stopper 225mm wide including all taxes, cost of all material, labour and T & P etc.required for proper completion of work.
Supplying and fixing P.V.C. pipe 75mm. dia in weep holes including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Supplying and fixing sealing compound in floor joint including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Centering and shuttering for R.C.C. work of sub structure of T-Beam, syphon, aqueduct including all taxes cost of all material, labour, T&P etc. required for proper completion work.
E/W in digging drain channel section in all type of soil including all leads, lifts, royalty, labour cess with proper dressing & manual compaction for proper completion of work.
Supplying & driving of "Z" type sheet pile including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Supplying & laying tarfelt in two layers including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
E/W in making drain diversion in all types of soil including all leads, lifts, royalty with proper dressing & manual compaction for proper completion of work.
E/W in embankment in guide bund, ramp & making bank in all type of soil including all lead, lift, royalty with proper dressing & manual compaction for proper completion work.
Back filling of earth with proper dressing and manual compaction for proper completion of work.
E/W in embankment in making road diversion in all type of soil including all lead, lift, royalty with proper dressing & manual compaction for proper completion work.
Laying plain cement concrete in 1:3:6 with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T & P etc.With mechanical compaction required for proper compaction of work.
Supplying and laying Ahirora Stone boulder of 40-60 Kg. including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
P/F diamond seal including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Earth work for cleaning of silt from Syphon Aquaduct due to flooding in Hathiyakunda Nala including all lead & lift, cost of all material, labour, T&P etc. required for proper completion of work.
E/W in Constructing R.M.C. in all type of soil including all lead, lift, Royalty and disposal of surplus earth to spoil banks with manual compaction and dressing to profiles with all labour T&P etc. required for proper completion of work. (i) E/W above spring level
(ii) E/W bellow spring level
E/W in cleaning barrel/syphon including lead upto 200M and lift upto 4.50 M including all cost of labour, T&P etc. complete.
M/s Kaiser Construction Engineers and Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf