| Sl No | Description | Qty | Unit | Manjunatha Furnishers L2 | SPACE3DESIGNS L3 | VASP ENGINEERS L1 | Imperial Furnishers & Interiors L4 |
|---|---|---|---|---|---|---|---|
| 1.01 | Supply of workstation with a size of: 1200(L)x600(d)x750 /1050 (h) table top made of 25mm thk. With above table top fabric and writing board and below table top 2 level raceway.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 4 | Nos. | 14,000 ₹56,000 | 15,000 ₹60,000 | 13,750 ₹55,000 | 14,000 ₹56,000 |
| 1.02 | Supply of Printer storage unit with a size of; 1100(L)x600(d)x 750(h) with 2equal doors made of 18mm thk. PLB (The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 1 | Nos. | 8,500 ₹8,500 | 8,750 ₹8,750 | 9,000 ₹9,000 | 8,250 ₹8,250 |
| 1.03 | Supply of Manager table with a size of: 1800(L)x750(w) x750(h) with 25mm thk. Table top and leg with 18mm thk. Below table top modestry panel with side storage unit with a size of: 1200(L)x 450(d)x750(h) draw at top and shetter at bottom whole unit mounted on levellers to adjust uneven surface.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 2 | Nos. | 18,000 ₹36,000 | 20,500 ₹41,000 | 18,500 ₹37,000 | 20,000 ₹40,000 |
| 1.04 | Supply of Pedestal unit with a size of: 640(h)x400(w)x450(d) with 3draws with common lock mounted on casters.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 4 | Nos. | 3,000 ₹12,000 | 3,000 ₹12,000 | 3,500 ₹14,000 | 5,000 ₹20,000 |
| 1.05 | Supply of Full height partition with a size of: 2480(h)x3100+ 3070(L)x75mm combination of PLB+Glass with raceway at bottom whole unit mounted on levellers.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 240 | Sqft | 510 ₹1.2 L | 440 ₹1.1 L | 485 ₹1.2 L | 520 ₹1.2 L |
| 1.06 | Supply of Storage unit with a size of; 1800(h)x900(w)x450(h) with 2equal doors with 375mm shelving at inside with lock and handle made of 18mm thk. PLB.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 6 | Nos. | 13,500 ₹81,000 | 15,000 ₹90,000 | 13,000 ₹78,000 | 14,000 ₹84,000 |
| 1.07 | Supply of Door with vascal frame made of wood with hinges, lock, handle with door stoper at bottom.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 1 | Nos. | 30,000 ₹30,000 | 31,000 ₹31,000 | 25,000 ₹25,000 | 26,500 ₹26,500 |
| 1.08 | Dismantling of existing workstations and transporting to disposal yard anywhere in the campus.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 10 | Nos. | 500 ₹5,000 | 550 ₹5,500 | 1,000 ₹10,000 | 750 ₹7,500 |
| 1.09 | Supply of Window side Bottom storage unit size of: 4200x750 x400 mm with shelving at inside with doors.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 1 | Nos. | 28,000 ₹28,000 | 24,000 ₹24,000 | 25,500 ₹25,500 | 22,000 ₹22,000 |
| 1.10 | Supply of window roller blinds size of: 4200x1735mm(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.) | 4 | Nos. | 10,250 ₹41,000 | 12,000 ₹48,000 | 10,500 ₹42,000 | 12,000 ₹48,000 |
Tender Value
Refer Docs
Closing Date
16 Jan 2026, 3:00 pmClosed
Chief Manager (Infrastructure)
Chief Manager (Infrastructure), Estate Section, IIMB
Provision of modular workstations and storage units at room no E-210 for UG program office for chairperson and for staff
2026_IIMB_892840_1
CM(I)/SM(CD)/157/2025-26
Limited
Civil Works
30 days
Indian Institute of Management Bangalore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
20 Jan 2026
7 Jan 2026
19 Jan 2026
7 Jan 2026
16 Jan 2026
7 Jan 2026
Supply of workstation with a size of: 1200(L)x600(d)x750 /1050 (h) table top made of 25mm thk. With above table top fabric and writing board and below table top 2 level raceway.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of Printer storage unit with a size of; 1100(L)x600(d)x 750(h) with 2equal doors made of 18mm thk. PLB (The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of Manager table with a size of: 1800(L)x750(w) x750(h) with 25mm thk. Table top and leg with 18mm thk. Below table top modestry panel with side storage unit with a size of: 1200(L)x 450(d)x750(h) draw at top and shetter at bottom whole unit mounted on levellers to adjust uneven surface.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of Pedestal unit with a size of: 640(h)x400(w)x450(d) with 3draws with common lock mounted on casters.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of Full height partition with a size of: 2480(h)x3100+ 3070(L)x75mm combination of PLB+Glass with raceway at bottom whole unit mounted on levellers.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of Storage unit with a size of; 1800(h)x900(w)x450(h) with 2equal doors with 375mm shelving at inside with lock and handle made of 18mm thk. PLB.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of Door with vascal frame made of wood with hinges, lock, handle with door stoper at bottom.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Dismantling of existing workstations and transporting to disposal yard anywhere in the campus.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of Window side Bottom storage unit size of: 4200x750 x400 mm with shelving at inside with doors.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of window roller blinds size of: 4200x1735mm(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of soft board with a size of: 1200x1200 with aluminium beading which directly fixed to wall.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Supply of writing board with a size of: 1200x1200 with aluminium beading which directly fixed to wall.(The rate shall include the cost of all materials, labour, transportation, HOM all incidentials to complete the work in all respect.)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_938458.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid