Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹1.96 (<0.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹5,880
Closing Date
28 Jul 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
LANE FROM L/O PEER SHABIR AND ORS AT PEER CHECK BLOCK KPORA
2026_RDPR_317302_28
ENIT75of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹5,880
31 Jul 2026
23 Jul 2026
29 Jul 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by the way of engagement of labors including cutting of shrubs etc dewatering.(subject to actual) | - | cum | - | - |
| 0.0 | E/w in excavation in foundation trenches by manual means dispoal lead upto 25 mts and lift 1.5 mts in all kinds of soil | - | Cum | - | - |
| 0.0 | Prov/Laying of nallah muck incl.spreading etc incl.all leads, lifts, carriages, complete | - | Cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm down aggregates. | 1 | Cum | - | - |
| 0.0 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | - | sqm | 1 | - |
| 0.0 | Centring ,strutting, propping etc. and removal of formwork for Foundation | 0.2 | sqm | - | - |
| 0.0 | Centring ,strutting, propping etc. and removal of formwork for Suspended Floors | 1 | sqm | - | - |
| 0.0 | Reinforced cement concrete work in Slab excluding cost of centring, shuttering, finishing and reinforcement,with 1:2:4 mix graded stone aggregate 20mm nominal size | 1 | Cum | - | - |
| 0.0 | Reinforcement for RCC work including straightening, bending, cutting ,placing in position and binding all complete, hot rolled deformed bars @ 90 kgs/cum | - | Cum | - | - |
| 0.0 | Carriage of Sand/Bajree by MT Lead of 20 Kms & HL of 50 M | 1 | Cum | 1 | ₹1 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1039401.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .