| 1 | 1₹19.9 LAccepted-AOC AT CHAKASINDHIA PO GHODAPADA DIST BALESWAR PIN 756003 | GHODAPADA | BALESWAR | ODISHA | 756003 | ₹19.9 L | 1 | Accepted-AOC successful bidder |
| 2 | 1₹19.9 LRejected-AOC AT CHHOTRAYPUR PO MUKTPUR PS BETNOTI DIST MAYURBHANJA | BALESHWAR | ODISHA | 756028 | ₹19.9 L | 1 | Rejected-AOC unsuccessful bidder |
| 3 | 1₹19.9 LRejected-AOC KHUNTAPUR UNDER BETNOTI TAHASIL | BALESHWAR | ODISHA | 754223 | ₹19.9 L | 1 | Rejected-AOC unsuccessful bidder |
| 4 | 1₹19.9 LRejected-AOC | ₹19.9 L | 1 | Rejected-AOC unsuccessful bidder |
| 5 | 1₹19.9 LRejected-AOC | ₹19.9 L | 1 | Rejected-AOC unsuccessful bidder |
Tender Value
₹23.4 L
EMD Value
₹23,390
Closing Date
19 Dec 2025, 5:00 pmClosed
S.E.R.W.Division, Baripada
S.E.R.W.Division, Baripada
Construction of 1 no.F type quarter at Jugal PHC under Betnoti block for the year 2023-24.( State Plan)
2025_CERWI_122923_18
11(Online)/RWD/BPD/2025-26
Open Tender
Civil Works - Buildings
180 days
Baripada
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹23,390
Yes
27 May 2026
11 Dec 2025
19 Dec 2025
11 Dec 2025
19 Dec 2025
11 Dec 2025
11 Dec 2025 - 19 Dec 2025
Civil
Earth work in excavation of foundation in hard soil or gravelly soil including dressing and levelling the bed and disposal of the excavated materials within initial leads and lifts as per direction of E.I.C.
Ground Floor
Supplying & filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty & taxes of all materials, cost of all labour, T&P etc complete.
Ground Floor
Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal of approved quality from approved quarry including hoisting, laying, using concrete mixture and vibrators including watering, curing, cost, carriage, royalty & taxses of all materials etc. complete.
Ground Floor
Cement Concrete (1:2:4) using 12mm size hard granite Chips of approved quality from approved quarry including hoisting, laying, using concrete mixture and vibrators including watering, curing, cost, carriage, royalty & taxses of all materials etc. complete.
Plinth Protection
R.C.C. work of M-20 using 20 mm and dowm graded cb. Chips with cost carriage of all materials etc. complete.
Column Base
Ground Floor
Grade Beam
Ground Floor
Column & Beam
Ground Floor
First Floor
Lintel
Ground Floor
First Floor
Chajja &shelves
Ground Floor
First Floor
Stair case
Ground Floor
Roof slab
Ground Floor
First Floor
Supplying fitting and placing uncoated HYSD bar reinforcement complete asper drawing and technical specification.
Ground Floor
First Floor
Brickwork with Fly Ash bricks in cement mortar (1:6) in Foundation and Plinth including watering curing etc.
Ground Floor
Brickwork with Fly Ash bricks in cement mortar (1:6) in Super structure with cost carriage of all materials etc.
Ground Floor
First Floor
16 mm thick c.p. 1:6 over brick work in finished smooth with cost carriage of all materials etc.
Ground Floor
First Floor
12mm thick c.p. 1:6 over brick work in finished smooth with cost carriage of all materials etc.
Ground Floor
First Floor
6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry treatment.
Ground Floor
First Floor
Fixing vertified tiles in floors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile.
Ground Floor
Providing and fixing Granite tiles in floors,treads (600mm x 600mm) and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile.
Ground Floor
Fixing vertified wall tiles in dados, (600mm x 600mm) skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile.
Ground Floor
Supplying, fitting and fixing Anti-Skid ceramic tile in floors, treads of steps and landing on 20mm thick cement mortar(1:4) (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required
Ground Floor
providing fitting and fixing M.S. door & window grills and grill gate made out of M.S. angle with flat with cost of all materials etc.
Ground Floor
First Floor
Supplying, fitting afixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost conveyance, taxes of all materials labour, T&P etc. required for the complete in all respect.
Ground Floor
Finishing wall surface of wall with Acylic wall putty (water based) of approved make and finish smooth and even surface to receive painting including cost of all materials labour T&P etc complete.
Ground Floor
First Floor
Finishing walls with plastic emulsion paint two coats any approved shade with cost of all materials etc.
Ground Floor
First Floor
Finishing walls with weather seal coat paints two coats any approved shade with cost of all materials etc.
Ground Floor
First Floor
Painting two coats over a coat of primer with any approved shade with cost of all materials etc.
Ground Floor
First Floor
Earthwork in hard soil with initial lead and lift including rough dressing and breaking clods upto 5cm to 7cm size and laying in layers each layer not exceeding 0.3m in depth etc. complete.
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_571018.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_571018.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid