Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.2 LAccepted-AOC VILLAGE DEORA P O PACHAUR DIST SINGRAULI M P 486886 | SINGRAULI | MADHYA PRADESH | 486886 | ₹57.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹70.3 LRejected-Finance | ₹70.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹87.5 LRejected-Finance | ₹87.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹92.9 LRejected-Finance JME COLONY SHAKTINAGAR DIST SONEBHADRA UP | SHAKTINAGAR | SONEBHADRA | UTTAR PRADESH | ₹92.9 L | L4 | Rejected-Finance L4 |
Updated dates
Tender Value
₹1.2 Cr
EMD Value
₹1.6 L
Closing Date
13 Mar 2026, 11:00 amClosed
S.O.(CIVIL)
Khadia Area Dist.-Sonebhadra U.P. PIN 231222
Leaning and removal of silt/earth from nallah/siltation area of mine towards OB time office along railway line up to double barrel culvert and NTPC boundary wall at Khadia Project during monsoon 2026-27
2026_NCL_353947_1
GM /KHD/C/25-26/ETN-106 Date 20/02/2026
Open Tender
Civil Works - Others
180 days
Khadia Area Dist.-Sonebhadra U.P.
REFER NIT
5 documents required · 5 mandatory
₹1.6 L
6 Apr 2026
20 Feb 2026
14 Mar 2026
20 Feb 2026
13 Mar 2026
21 Feb 2026
20 Feb 2026 - 2 Mar 2026
Item Description/ Heading
CIVIL PART
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed byEngineer-in-charge. All kinds of soil
Earth work in excavation in all kind of soil/ silt bymechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloadingat designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead upto 50.00 m
Earth work in excavation in all kind of soil/ silt bymechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloadingat designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead upto 5 km
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.87 MB
BOQ_366763.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid