Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 CrAccepted-AOC | L1 | Accepted-AOC qualified | |
| 2 | L2₹23.7 Cr+₹4.7 Cr (25.0%)Rejected-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | L2 | Rejected-Finance disqualified |
Tender Value
₹17.9 Cr
EMD Value
₹8.9 L
Closing Date
20 May 2025, 5:00 pmClosed
COMMISSIONER OF UJJAIN MUNICIPAL CORPORATION
COMMISSIONER OF UJJAIN MUNICIPAL CORPORATION CCHTRAPATI SHIVAJI BHAWAN, AGAR ROAD UJJAIN
ROAD WIDENING GADA PULIYA TO NARSINGH GHAT CHOURAHA
2025_UAD_394496_2
1/Project Cell/2025
Open Tender
Civil Works - Roads
Percentage
548 days
GADA PULIYA TO NARSINGH GHAT CHOURAHA
As per Annexure C
4 documents required · 4 mandatory
₹50,000
₹8.9 L
UJJAIN
22 Sept 2025
21 Apr 2025
22 May 2025
21 Apr 2025
20 May 2025
21 Apr 2025
1 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BITUMINOUS COURSES | 1,872.45 | M3 | 420 | ₹7,86,429 |
| 2 | GRANULAR COURSES | 5,617.35 | M3 | 378 | ₹21,23,358.3 |
| 3 | "PLANTING PERMANENT HEDGES INCLUDING DIGGING OF TRENCHES, 60 CM WIDE AND 45 CM DEEP, REFILLING THE EXCAVATED EARTH MIXED | 1,000 | M | 247 | ₹2,47,000 |
| 4 | "PLANTING OF TREES AND THEIR MAINTENANCE FOR ONE YEAR (PLANTING OF TREES BY THE ROAD SIDE (AVENUE TREES) IN 0.60 M DIA H | 100 | EA | 724 | ₹72,400 |
| 5 | "EDGING WITH 2ND CLASS BRICKS LAID DRY LENGTH WISE INCLUDING EXCAVATION, REFILLING, CONSOLIDATING WITH HAND PACKING AND | 500 | M | 32 | ₹16,000 |
| 6 | "SUPPLYING, STACKING AND SPREADING OF GOOD EARTH FOR PLANTATION AT SITE INCLUDING ROYALTY AND CARRIAGE (EARTH MEASURED I | 360 | M3 | 292 | ₹1,05,120 |
| 7 | "SUPPLYING AND STACKING SLUDGE AT SITE INCLUDING ROYALTY AND CARRIAGE UP TO 1 KM (SLUDGE MEASURED IN STACKS WILL BE REDU | 360 | M3 | 213 | ₹76,680 |
| 8 | "SUPPLYING, STACKING AND SPREADING COMPOST/MANURE FROM APPROVED SOURCE, (MANURE MEASURED IN STACKS WILL BE REDUCED BY 8% | 360 | M3 | 207 | ₹74,520 |
| 9 | MIXING & SPREADING EARTH AND MANURE IN PROPORTION AS SPECIFIED OR DIRECTED. | 360 | M3 | 15 | ₹5,400 |
| 10 | "UPROOTING RANK VEGETATION AND WEEDS BY DIGGING THE AREA TO A DEPTH OF 30 CM REMOVING ALL WEEDS AND OTHER GROWTH WITH RO | 1,200 | M2 | 26 | ₹31,200 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
NIT.pdf
Tender Notice • 0.04 MB
168641673.xls
BOQ Document • 0.34 MB
168641674.pdf
Tender Document • 0.22 MB
tender.pdf
Tender Document • 1.91 MB
DRAWING.pdf
Tender Document • 15.50 MB
168641676.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .