Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC RAILWAY ROAD 9 10 KC MARKET 132001 2021R66 | KARNAL | HARYANA | 132001 | ₹18.1 L | L1 | Accepted-AOC LOA issued |
| 2 | L2₹20.5 L+₹2.4 L (13.2%)Rejected-Finance TYPE 2 RITURAJ SINGH AKBARPUR SARAI GHAGH KANNAUJ UTTAR PRADESH SARAIMEERA KANNAUJ UTTAR PRADESH 209725 | KANNAUJ | UTTAR PRADESH | 209725 | ₹20.5 L+₹2.4 L (13.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹20.8 L+₹2.7 L (15.0%)Rejected-Finance | ₹20.8 L+₹2.7 L (15.0%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Responsive. |
| 5 | Rejected-Technical 2ND FLOOR CUBIC TOWER BALLUPUR II CHAKRATA ROAD DEHRADUN DEHRADUN UTTARAKHAND 248001 CHAKRATA ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | - | - | Rejected-Technical Not Responsive |
Tender Value
₹21.0 L
EMD Value
₹42,040
Closing Date
20 Mar 2024, 5:00 pmClosed
AMIT GOYAL
ED - Karnal
Pdg. and Installation of 49KW On-grid Hybrid Solar Power Plant in Govt. Industrial Training Institute (Women) Distt. Karnal.
2024_HRY_367097_1
202406F6905C 563A 4831 B0D6 02BA689D81C2665BAR
Open Tender
Electrical Works
Works
60 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹42,040
Yes
14 Jun 2024
12 Mar 2024
21 Mar 2024
12 Mar 2024
20 Mar 2024
12 Mar 2024
Amount
[32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp
OM SOLAR SOLUTIONS
DEV POWER SYSTEMS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .