Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.7 LAdmitted-Finance | -1.00% | ₹19.7 L | L1 | Admitted-Finance |
Tender Value
₹19.9 L
EMD Value
₹39,820
Closing Date
10 Aug 2026, 10:00 amClosed
EO
NP TODA
WORK NO 14 E NIT NO 11/2026
2026_DLB_578456_14
E NIT NO 11/2026-27 REF NO 1942 DATE 27-07-2026
Open Tender
Civil Works
Percentage
NP TODA
WORK NO 14 E NIT NO 11/2026
2 documents required · 2 mandatory
₹500
NP TODA
₹39,820
Yes
19 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART - A BUILDING AND STRUCTURE WORKS | |||||
| 1.01 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m | - | Cum | 229.5 | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | Cum | 4,575 | ₹4,570.43 |
| 1.03 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | 4,860 | - |
| 1.04 | Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. | 1 | Cum | 5,830 | ₹5,824.17 |
| 1.05 | Square or rectangular pillars | 1 | Cum | 5,585 | ₹5,579.42 |
| 1.06 | Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 50mm thick | - | Sqm | 445 | - |
| 1.07 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | - | Sqm | 315.5 | - |
| 1.08 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm). | - | Sqm | 93.1 | - |
| 1.09 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete. | - | Kg | 113.5 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_1028120.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .